Title: LINAC Proton Driver Civil Design


1
LINAC Proton DriverCivil Design Site
Considerations
  • Dixon Bogert
  • March 15 , 2005

Reporting Work by FESS Elaine
McCluskey And Chuck Federowicz Tom Lackowski Rod
Walton Gary Van Zanbergen
2
Outline
  • Site Considerations Inside Main Ring
  • Major Elements of Construction
  • List
  • Comparison with previous experience
  • Underground Enclosures
  • Surface Structures
  • Utilities
  • Cost and Schedule

3
Linac Proton Driver Site Plan
4
Linac Proton Driver Civil Elements (1)
5
Linac Proton Driver Civil Elements (2)
6
Linac Enclosure Section
7
Linac Enclosure and L-1 Gallery Section
8
8 GeV H- Transport LineEnclosure Section
9
8 GeV H- Transport LineEnclosure Section
10
Crossing the Tevatron and P-barTunnels Plan
and Elevation Views
11
Injection Area near MI-10 Plan and Elevation
Views
12
Linac and Injection Beam Absorbers
13
L-0 Upstream Service Building
14
L-1 Klystron Gallery-Volumetric Rendering
15
L-1 Klystron Gallery
16
Service Buildings L-10, L-11
17
L-10 (SNS Central Helium Liquefier Layout)
18
L-25, L-32, L42 Service Buildings
19
Linac Beam Absorber/L-25, L-32, L-42 Locations
20
L-25 Center Service Building Section
21
Cost Estimate0.5MW Beam Power
22
Shutdown Schedules DRAFTfor Crossover and
Connection
23
Summary
  • The Civil Construction for the Linac Proton
    Driver is similar to most of the civil
    construction at Fermilab.
  • The Main Injector built in 1992-97 was similar
    and larger.
  • The enclosures, connections, and service
    buildings are typical when compared to previous
    work.
  • Cost estimating take-offs are typical for similar
    projects at this stage.
  • The Main Injector was built without cost
    overruns.
  • The Service Buildings and Outfitting of
    NuMI/MINOS were also within budgetary estimates.
  • With appropriate contingency, more for scope than
    constructability, the estimates for cost and
    schedule are reasonable. We expect no surprises
    during the environmental assessment development.

24
LINAC Proton DriverCivil Design Site
ConsiderationsAppendix Slides
  • Dixon Bogert
  • March 15 , 2005

25
Linac Proton DriverCivil Overview 1A
26
Linac Proton DriverCriteria Utility Plan
27
Linac Enclosure
28
Beamline Enclosure / Exit Stair Plan
29
Stair Sections
30
Transport Line Enclosure
31
Transport Line at Tevatronand Anti-Proton
Enclosures
32
Linac Beam Absorber
33
Linac Beam Absorber and L-25 Service Building
34
Transport Line Connection atthe Main Injector
35
Earthwork
36
Utilities
37
Cooling Schematic
38
Electrical Single Line (1)
39
Electrical Single Line (2)
40
Electrical Single Line (3)