Title: LINAC Proton Driver Civil Design
1LINAC Proton DriverCivil Design Site
Considerations
- Dixon Bogert
- March 15 , 2005
Reporting Work by FESS Elaine
McCluskey And Chuck Federowicz Tom Lackowski Rod
Walton Gary Van Zanbergen
2Outline
- Site Considerations Inside Main Ring
- Major Elements of Construction
- List
- Comparison with previous experience
- Underground Enclosures
- Surface Structures
- Utilities
- Cost and Schedule
3Linac Proton Driver Site Plan
4Linac Proton Driver Civil Elements (1)
5Linac Proton Driver Civil Elements (2)
6Linac Enclosure Section
7Linac Enclosure and L-1 Gallery Section
88 GeV H- Transport LineEnclosure Section
98 GeV H- Transport LineEnclosure Section
10Crossing the Tevatron and P-barTunnels Plan
and Elevation Views
11Injection Area near MI-10 Plan and Elevation
Views
12Linac and Injection Beam Absorbers
13L-0 Upstream Service Building
14L-1 Klystron Gallery-Volumetric Rendering
15L-1 Klystron Gallery
16Service Buildings L-10, L-11
17L-10 (SNS Central Helium Liquefier Layout)
18L-25, L-32, L42 Service Buildings
19Linac Beam Absorber/L-25, L-32, L-42 Locations
20L-25 Center Service Building Section
21Cost Estimate0.5MW Beam Power
22Shutdown Schedules DRAFTfor Crossover and
Connection
23Summary
- The Civil Construction for the Linac Proton
Driver is similar to most of the civil
construction at Fermilab. - The Main Injector built in 1992-97 was similar
and larger. - The enclosures, connections, and service
buildings are typical when compared to previous
work. - Cost estimating take-offs are typical for similar
projects at this stage. - The Main Injector was built without cost
overruns. - The Service Buildings and Outfitting of
NuMI/MINOS were also within budgetary estimates. - With appropriate contingency, more for scope than
constructability, the estimates for cost and
schedule are reasonable. We expect no surprises
during the environmental assessment development.
24LINAC Proton DriverCivil Design Site
ConsiderationsAppendix Slides
- Dixon Bogert
- March 15 , 2005
25Linac Proton DriverCivil Overview 1A
26Linac Proton DriverCriteria Utility Plan
27Linac Enclosure
28Beamline Enclosure / Exit Stair Plan
29Stair Sections
30Transport Line Enclosure
31Transport Line at Tevatronand Anti-Proton
Enclosures
32Linac Beam Absorber
33Linac Beam Absorber and L-25 Service Building
34Transport Line Connection atthe Main Injector
35Earthwork
36Utilities
37Cooling Schematic
38Electrical Single Line (1)
39Electrical Single Line (2)
40Electrical Single Line (3)