3GPP TSG GERAN OUTCOME OF GERAN WG4 - PowerPoint PPT Presentation

About This Presentation
Title:

3GPP TSG GERAN OUTCOME OF GERAN WG4

Description:

General information (1/3) The Joint WG4 ... GPRS. EDGE. Selection/Reselection, HO (2.5G, 3G) LCS. Main outcomes Layer 1(1/2) ... Main outcomes GPRS (1) ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 17
Provided by: blan75
Learn more at: https://www.3gpp.org
Category:
Tags: 3gpp | geran | outcome | tsg | gprs | wg4

less

Transcript and Presenter's Notes

Title: 3GPP TSG GERAN OUTCOME OF GERAN WG4


1
3GPP TSG GERAN OUTCOME OF GERAN WG48Radio
Aspects
  • 5-7, February
  • Rome, Italy

2
Introduction
  • General information
  • Main outcomes
  • Future meetings , 2002

3
General information (1/3)
  • The Joint WG4 WG5 session held place during the
    meeting.
  • Most of the delegates were participating at both
    WG4 WG5 sessions and were requested to ask
    companies to send at least one dedicated to each
    group delegate.
  • The GERAN WG4 meeting report could be found in
    GP-020474

4
General information (2/3)
  • Workload
  • 101 contributions were considered during
    the meeting
  • 54 CRs were agreed
  • The works have been started on the
  • AMR NB
  • DTM
  • Rel-4
  • - Delayed TBF

5
General information (3/4)
  • The Participated Companies were requested to
    provide input on the developing Test Cases for
  • Rel-5
  • - Wideband AMR
  • - RLC/MAC (Iu interface CS and PS domain)
  • - Enhanced power control
  • - AMR 8 PSK HR
  • - Selection/Reselections (GERANgtUTRAN)
  • - Handover (GERANgtUTRAN PS).

6
General observations (4/4)
  • Main topics
  • Radio/Layer 1
  • GPRS
  • EDGE
  • Selection/Reselection, HO (2.5G, 3G)
  • LCS

7
Main outcomes Layer 1(1/2)
  • Seven documents were presented for new AMR NB
    Test cases, including co-channel rejection,
    reference sensitivities and BFI.
  • The AMR related CRs has been presented, are for
    both AFR and AHR.
  • The BFI test cases for both FR and HR were
    agreed.
  • The rest of the tests are planed to be done
  • during the next WG4 meeting.

8
Main outcomes Layer 1(2/2)
  • There are number (26) of document were presented
    as a correction for the existing test cases
    related to selection/reselection.
  • Document GP-020051 contained an Introduction to
    DTM
  • Document GP-020052 contained an input on DTM Test
    Cases
  • It is expected that the GERAN WG4 will receive
    the contributions related to the DTM tests cases
    developing at the next meeting.

9
Main outcomes GPRS (1)
  • GERAN WG4 has received a number of CRs to section
    41, 42 and 43 of 51.010-1
  • There are 17 documents were presented related to
    S41 of the 51.010, 24 for S42 and 1 for S43.
  • Most of the documents are the corrections for the
    existing test cases.
  • The number of the documents are correction of the
    Procedure and Test Requirements.

10
Main outcomes GPRS (2)
  • The number of CRs are related on the need to
    align timing for the turning on the carriers at
    the appropriate time, that the reselection will
    be performed as expected by the test case.
  • Some corrections were related to the correction
    of step references in Test Requirements.
  • Number of the corrections are related on the need
    to align the test cases with the latest versions
    of the core specifications.

11
Main outcomes EDGE
  • There are relatively small number of documents
    were received by the GERAN related to the EDGE
    test cases.
  • Document GP-020100 contained a correction to
    section 51.1.1.3 - RR / Paging / on PCCCH for
    EGPRS service / extended paging with P-TMSI
    successful
  • Document GP-020399 contained CR 51.010-1-422 on
    S52.1 EGPRS Tests for MAC procedures on PCCCH in
    Idle Mode
  • Document GP-020102 contained CR 51.010-1-559 with
    a correction to sections 53.1.2.8, 53.1.2.10,
    53.1.2.12 and 53.1.2.13 on Acknowledged Mode/
    Downlink TBF

12
Main outcomes LCS (1)
  • GERAN WG4 have received fourteen Contribution for
    LCS for this meeting.
  • The GP-020211 as a Revised LCS Work Plan.
  • Document GP-02125 contained a CR to 51.010-1 on
    E-OTD Timing Measurement Accuracy.
  • EOTD-Capable MS Test Platforms were discussed and
    included into 3GPP TS 51.010 in Annex 6.

13
Main outcomes LCS (2)
  • There are essentially three subjects i.e.
    sensitivity, interference and multipath which are
    the requirements from 05.05.
  • It was decided that three corresponding test
    cases should be written.
  • An example of how this should be done was
    provided in document GP-020389 (CR 616) which is
    a combination of GP-020126 and GP-020133

14
Main outcomes LCS (3)
  • It was suggested that some of the parameters are
    very tight and accuracy may not be feasible.
  • It was proposed to ask GERAN that more test
    equipment manufacturers attend WG4 to ensure that
    the proposed block-diagram being elaborated are
    possible.

15
Future meetings - 2001
  • The next GERAN WG4 meeting will be collocated
    with TSG GERAN, April 2002.

16
Future meetings - 2002
  • TSG GERAN meetings
  • 9, 15-19/04
  • 10, 24-28/06
  • 11, 26-30/08
  • 12, 18-22/11
Write a Comment
User Comments (0)
About PowerShow.com