NORM: Measurement - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

NORM: Measurement

Description:

Gert.Jonkers_at_Shell.com. G. Jonkers, GSEA/4 at SRTCA. P.O. Box 38000, 1030 BN ... add a polonium (208Po) isotopic spike. Plate out polonium on a clean Ag-plate ... – PowerPoint PPT presentation

Number of Views:70
Avg rating:3.0/5.0
Slides: 14
Provided by: pdo5
Category:
Tags: norm | com | measurement | spike

less

Transcript and Presenter's Notes

Title: NORM: Measurement


1
NORM Measurement Analysis (Standardisation
Quality Assurance) Gert Jonkers Engineering
Analytical - GSEA/4 Problem Solving (Shell EP
Ionising Radiation/NORM HSE Expert
CHP) location Shell Research Technology
Centre, Amsterdam P.O. 38000 NL-1030 BN
Amsterdam the Netherlands
2
Product Waste Streams to be Analysed on NORs
3
1 BqNOR/g corresponding to ... gNOR/g
ppt
ppb
ppm
4
Nuclear Based Analytical Techniques
5
g-Spectrometry (1) Sample Containers
Petri-dishes fix geometry Sealing dishes prevents
escape of 222Rn Data acquisition time 60,000
s Calibration for NORM (IAEA certified ores)
6
g-Spectrometry (2) Setup
n-type high purity Germanium detectors for low
energy range
7
g-Spectrometry (3) Setup
8
g-Spectrometry (4) Spectrometry
g-yield data base used for analysis
standardised 226Ra 186 keV line directly used (no
235U present) Correct intensity low energy (Eg lt
100 keV, 210Pb) lines for self-absorption NORs
analysed 226Raeq, 210Pbeq, 228Raeq 228Theq,
9
a-Spectrometry (1) Spectrometry
  • 210Po determination in all kind of materials
  • Digest the sample in a mixture of concentrated
    acids
  • add a polonium (208Po) isotopic spike
  • Plate out polonium on a clean Ag-plate
  • Place plate below surface barrier detector in a
    vacuum chamber
  • Analyse the a-spectrum, where the internal
    reference is used for efficiency of plate out

10
a-Spectrometry (2) Setup
Method is laborious Questionable, a separate
210Po is required from an HSE point of view.
11
a-scintillation counting (1) Setup
(disassembled)
Lucas cell method
12
g-Spectrometry (2) Setup Assembled
Counting 222Rn concentration
13
EP NORM REQUIRED ANALYSES DATA(HSE point of
view)
Write a Comment
User Comments (0)
About PowerShow.com