RPC'S MUON TRIGGER - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

RPC'S MUON TRIGGER

Description:

1) Status of the RPC chambers. 2) Status of the muon trigger. Status of the RPC chambers ... New firmware for FPGAs produced. and installed. turnaround of updating ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 11
Provided by: maciej4
Category:

less

Transcript and Presenter's Notes

Title: RPC'S MUON TRIGGER


1
RPC'S MUON TRIGGER IN LAST DAYS OF CRUZET
(preliminary)? M. Gorski, Warsaw for the RPC
team Topics 1) Status of the RPC chambers 2)
Status of the muon trigger
2
Status of the RPC chambers
Green 4 wheels with HV/LV on Readout and
trigger in four towers only
3
Current values stable in time
One sector an example, 4 days peaks ramping
up chambers
4
Gas system operation of all wheels stable with
final system in closed mode only one stop because
of liquid mass flow control failure
5
Status of the trigger electronics Problems
encountered since some time Resetting of LBOX
FPGAs Errors in readout Spikes in trigger rate
6
New firmware for FPGAs produced and
installed turnaround of updating - basically 1
update/day due to - long VHDL compilation and
- long reloading procedure Data taking with
Minidaq started Friday 11.07
7
RPC TRIGGER RATE VS TIME
8
BX DISTRIBUTIONS FOR RPC'S
3 CHAMBERS
4 CHAMBERS
5 CHAMBERS
6 CHAMBERS
TRIGGER FROM RPC'S ONLY
9
BX DISTRIBUTION FROM RPC'S
4 CH.
3 CH.
6 CH.
5 CH.
NON-RPC TRIGGER
10
No readout errors encountered, No nonexistent
partitions present
More work needed on synchronization Further
checks on system stability Inclusion of endcaps
Write a Comment
User Comments (0)
About PowerShow.com