E-1-1
  • NPOESS Program and Spacecraft

2
NPOESS Spacecraft Status
  • NPOESS supports the 1330 and 1730 orbit planes
  • Spacecraft working to A-DCS/spacecraft ICD
    IF31-0033 Rev B (soon to be Rev C)
  • Technical interchange meeting with CNES held July
    9-11, 2008
  • Spacecraft subsystem reviews Dec 2008 - Feb
    2009
  • Spacecraft Critical Design Review April 2009

3
Launch dates
  • Initial order for two satellites,
  • - option for additional two to be exercised in
    2010
  • Planned launch dates C1 Mar 2014 1330 orbit
  • C2 May 2016 1730 orbit
  • C3 2020 1330 orbit
  • C4 2022 1730 orbit
  • launch date tentative.
  • Launch readiness dates 1/2018 1/2020 for C3
    and C4
  • Program runs through 2026 (provide data through
    2026)

4
Review/Delivery Status
  • NGAS spacecraft design reviews in the December
    2008-February 2009 time frame
  • NPOESS CDR April 2009
  • CNES instrument PDR held February 2009
  • CNES review of interfaces planned for September
    or October 2009
  • Since spacecraft is already past CDR, will be
    important to keep in close contact to ensure
    information exchange is kept up-to-date
  • need dates vs availability dates for A-DCS
    instrument being worked between NGAS/IPO and CNES
    as part of giver-receiver list discussion
  • All dates need to be revisited based on C1 launch
    movement from 2013 to 2014

5
NPOESS Contacts June 2009
  • IPO Systems lead Benjie Spencer
    Benjie.Spencer_at_noaa.gov
  • IPO A-DCS instrument Mike Cummings
  • Michael.Cummings_at_noaa.gov
  • NGAS A-DCS Brian Norden Brian.Norden_at_ngc.com
  • (NGAS) SI Stephanie Moore smmoore_at_raytheon.com
  • SISystems Integration (responsible for ground
    interface control documents).

6
Ground Interfaces
  • Ground-to-ground ICD exists and has been signed
    by all parties.
  • Document D34652 NPOESS to Advanced Data
    Collection System Interface Control document
  • Dated August 11, 2006 (revision A)
  • Revisions for a Rev B reviewed by CNES in 2008.
    Release of Rev B on hold pending NGAS resolution
    of IPO comments received during Critical Design
    Audit

7
Spacecraft Interfaces
  • IF31-0033 ICD for the Advanced Data Collection
    and Location System (A-DCS) released and signed
    by all parties
  • IF31-0033 currently at Revision B, dated January
    28, 2008
  • July 2008, Technical Interface Meeting held among
    CNES, NGAS and IPO to discuss A-DCS details
  • Changes to create Revision C in change review
    board
  • ICD will be revised periodically for
    missing/incomplete information, as the
    information becomes available
  • Technical interface meeting among CNES, IPO and
    NGAS planned for September or October, 2009

8
OPSCOM 42 Action
  • 42-12-N
  • NOAA to provide an update on the LRD
    specification and SafetyNet development.
  • Action C. OConnors, M. Cummings, June 2009
  • Response - See following pages

9
LRD Characteristics
10
SafetyNet Sites
  • Next chart shows schedule for SafetyNet site
    readiness
  • McMurdo, Svalbard and Orlando (Florida)
    considered launch-critical for NPOESS C1
  • 5 additional sites planned to be ready by C1
    launch
  • Remaining sites to be ready by C2 launch

11
SafetyNet Sites