Title: Prezentace aplikace PowerPoint


1
Slovenská elektrizacná prenosová sústava,
a.s. Bratislava
Strategy of SR Energy Security
Ing. Rudolf Kvetán senior director of the
section of ES strategy, development, investments,
and international cooperation 1 June 2007 Town
of Melník
2
SR transmission system
3
Essential technical parameters of the
transmission system
  • 400 kV lines 1 753 km
  • 220 kV lines 962 km
  • 400 kV electric stations 18
  • 220 kV electric stations 8
  • owned by SEPS, a.s. there are 21 electric
    stations
  • transformer output 9 710 MVA
  • 400/220 kV 1 400 MVA
  • 400/110 kV 5 710 MVA
  • 220/110 kV 2 600 MVA

4
Current energy base in the Slovak Republic
Small hydro plants
Trencín Hydro power plant
Bohunice Nuclear power plant
Nováky Thermal power plant
Vojany Thermal power plant
Mochovce Nuclear power plant
Gabcíkovo others Hydro power plant
SE, a.s. Bratislava Headquarters
5
Current energy base in the Slovak Republic
Rated capacity and electrical power production
structure in ES of the SR in 2006
Rated capacity
Production
  • SR rated capacity 8 157 MW
  • The power output structure of the production
    base is equally distributed among
  • nuclear, thermal, and hydro power stations
  • Electricity production 31.2 TWh

6
Current energy base in the Slovak Republic
Electrical power production in Slovakia, in 2006
Shares of consumption and exports in the total
electricity production
The share of SE, a.s. (the major producer) in the
total electricity production
The total electrical power production in Slovakia
reached 31.2 TWh, out of which SE, a.s. 26.5 TWh
7
Current energy base in the Slovak Republic
Developments of Slovak ES rated capacity 1995 -
2006
ES SR rated capacity in 2006 8 157 MW
8
Current energy base in the Slovak Republic
Electricity production structure and consumption
developments in Slovakia
SR electricity consumption in 2006 29.6
TWh 2006/2005 Index
3.7
Consumption of electricity
9
Current energy base in the Slovak Republic
Balance of ES SR crossborder exchange in 2006
The total export balance in the foreign trade
equalled to 1 603 GWh in 2006.
10
Macro-economic environment analysis
Development of GNP and electricity consumption in
Slovakia
11
Analysis of development alternatives
Factors affecting the future development and
safety of electricity supplies in Slovakia
  • electricity supply requirements
  • fuel accessibility and pricing developments
  • electricity market price developments
  • removal of production and distribution
    facilities from operation
  • new technology development
  • development in neighbouring countries
  • regulatory framework stability

12
Analysis of development alternatives
Development of electricity consumption in Slovakia
An average annual growth in electricit
consumption is predicted within the range between
0.8 to 2.3 , until 2030. In a reference scenario
with the average annual growth of 1.6.
13
Analysis of development alternatives
Development of GNP, final electricity
consumption, and specific consumption (year
20061.0)
The growth of economy with decreasing specific
consumption is predicted, which corresponds with
priorities of SR and EU energy policies
14
Energy base in the Slovak Republic
ES SR capacity to be removed from operation until
2010
Year of removal
Average production GWh
Rated capacity MW
Equipment
Power plant
On a basis of the Slovak Republic Government
Resolution no. 801/1999 and Treaty of accession
to EU, in which Slovakia committed itself to shut
down the V1 units of NPP Jaslovské Bohunice, the
1st unit of NPP V1 removed from operation as of
31 December 2006. During 28 years of its
operation the unit produced 76.7 TWh of
electricity.
2006 and 2008
5600
2x440
V 1
NPP Bohunice
2010
600
2x110
3rd and 4th unit
ENO B
2010
120
32
TG 3
ENO A
2006
700
2x110
3rd and 4th unit
EVO 1
2006
100
2x110
25th and 26th unit
EVO 2
until 2010
900
200
Independent producers (estimate)
8020
1772
Total
15
Energy base in the Slovak Republic
ES SR capacity to be removed from operation until
2030
Progress of the production rated
capacity removal from the ES SR balance
Requirements to cover the deficit in the ES SR
production
Until 2030, 3 855 MW of the current rated
capacity in the SR is to be removed. For a
equalized balance between the consumption and the
production, it shall be necessary to ensure,
during this period, new electrical industry
capacity providing for annual production at the
level of 29 TWh.
16
Energy base in the Slovak Republic
ES SR capacity to be removed from operation until
2030
17
Analysis of development alternatives
Projected balance of electricity production and
consumption
5
rok
0
Moná nadvýroba
2005
2010
2015
2020
2025
2030
1200 MW - nový
pri nízkej
výkon tepelných el.
spotrebe
postupne v rokoch
-5
2015 a 2025
670 MW - ocakávaný
pri referencnej
priemerný pásmový dovoz v
spotrebe
TWh
-10
rokoch 2009 a 2012
1200 MW - nové jadrové el.
pri vysokej
od roku 2025
spotrebe
-15
-20
Nedostatok výroby
-25

18
Analysis of development alternatives
Projection of new power output facilities
An achievement of an equalized balance between
electricity consumption and production shall be
feasible when to following electrical industry
capacities are realized
19
Analysis of development alternatives
Projection of the share of new source type
facilities until 2030
Investment costs of renewable sources for
electricity production are rather high. It
represents nearly a half of all the capital
expenditure for new capacities, when the power
output obtained only reaches slightly over one
third, and the electricity production does not
even reach one fifth, of the quantity that shall
be ensured until 2030.
20
Analysis of development alternatives
Share of investment demands for ES development
with an equalized balance of electricity
consumption and production until 2030
The development of the Slovak electricity system,
including both transmission and distribution
system, shall require over Sk 560 bill. until the
year 2030.
21
Suport services for the existing sources in the SR
Provision of sources for particular types of ES
support services in 2011
22
Suport services for the existing sources in the SR
The course of existing source availability for
particular types of support services, reflecting
their gradual removal from operation
Creating conditions for operation of an adequate
range of production technologies capable of
ensuring requirements for support services.
Concurrently, supporting development of tools for
an enhancement of opportunities to importi
particular types of support services.
23
Envisaged cross-border development projects
  • Interconnection with Hungary - alternatives
  • Moldava (SK) - Sajóivánka (HU) T 2 x 400 kV line
  • Rimavská Sobota (SK) - Sajóivánka (HU) T 2 x 400
    kV line
  • Gabcíkovo (SK) - Györ (HU) T 400 kV line
    strengthening
  • Interconnection with Poland - alternatives
  • Byczyna (PL) - Varín (SK) T 2 x 400 kV line
  • Podborze (PL) - Varín (SK) T 2 x 400 kV line
  • Interconnection with Austria - alternatives
  • Stupava (SK) - Wien SO (AT) T 2 x 400 kV line
  • Podunajské Biskupice (SK) - Wien SO (AT) T 2 x
    400 kV line
  • Interconnection with Ukraine
  • Velké Kapuany (SK) - UA border T 400 kV line
    strengthening

24
Current and envisaged projects - infrastructure
Domestic lines Lemeany - Moldava T
reconstruction from 220 kV to 2 x 400 kV
Lemeany - Vola - V. Kapuany T strengthening to
2 x 400 kV Medzibrod T loop from 2 x 400 kV
line Gabcíkovo - Velký Dur T 2 x 400 kV new
line Horná dana - Bystricany - Boáca T 2 x 400
kV new line Electric stations refurbishment
and enlargement Kriovany T 400 kV station
refurbishment Medzibrod T station refurbishment
from 220 kV level to 400 kV Varín T 400 kV
station enlargement Medzibrod T station
refurbishment from 220 kV level to 400 kV
25
Map of SR transmission system envisaged
development projects
26
Priorities of electricity supply safety strategy
  • Risk factors
  • Unequalled balance between consumption and
    sources of their supply
  • Lack of support services
  • Uncontrolled construction of wind power stations
  • Obstacles in international profiles and foreign
  • transmission routes

27
Priorities of electricity supply safety strategy
  • Long-term development of electrical energy
    industry to be directed in order
  • to ensure clean, competitive, and
    permanently sustainable energy
  • Maintain the current optimal structure of the
    production base, with equalized
  • distribution of power output among nuclear
    power plants, thermal power plants,
  • and RES including hydro power stations with
    large power output
  • The strategic target for the development until
    2013 is focused on a substitution of removed
    power output sources by construction of domestic
    sources, with a concurrent adoption of the
    following measures
  • - savings in electricity consumption
  • - construction completion of 3rd and 4th
    unit in NPP Mochovce
  • - power output increase in NPP V2
    Bohunice and
  • NPP Mochovce 1,2
  • - realization of electricity sources in
    accordance with the programme
  • of renewable energy sources
  • - gradual realization of cogeneration and
    heat power capacity

28
Priorities of electricity supply safety strategy
  • Until 2030, to ensure approximately 6 600 MW of
    new production facilities
  • Create conditions for an enlargement of
    capacities for international electricity
    exchange.
  • As a priority, to ensure new international
    interconnections across the south border
  • Ensuring the development of Slovakia 400 kV
    electricity transmission system,
  • so that the system meets UCTE criteria of
    reliability and quality
  • Complete the subtitution of 220 kV transmission
    system by 400 kV system
  • Ensure the remote controlling of transmission
    system electrical stations
  • Requirements for investments in the electrical
    energy industry until 2030
  • are estimated to exceed Sk 560 bill.
  • The SR legislation harmonization with Directive
    no. 2005/89/ES concerning measures
  • to safeguard security of electricity supply
    and infrastructure investments
  • To implement a stable regulatory framework