Title: Instructions for Completing the Supplier Verification of Purchased Product Package
1Instructions for Completing the Supplier
Verification of Purchased ProductPackage
2What does SVPP consist of?
3When is SVPP Required?
- New Product
- Engineering Change
- New revision level
- Part number change, etc.
- Process Change
- Change of equipment.
- Change of sub-tier supplier.
- Tooling / Die / Mold change.
- Manufacturing Location Change
- As suporting documentation for
- To document relevant MDA (Material Deviation)
information. - To verify the part after an MDA has expired.
- To document Corrective Action results /
information. - Other changes to part or process????
4Submitting the SVPP Report
- Any discrepancies MUST be communicated prior to
sending the SVPP report. - If a discrepant SVPP Report is sent without prior
approval, an MRN will be generated for the lot
and will affect the suppliers quality report. - SVPP reports must be submitted separately to each
Climate Control facility. - Only the Quality Manager (or designated
representative) at the receiving facility may
waive this requirement. If the requirement is
waived, a copy of another facilities SVPP may be
submitted. Please note, this option is for
special cases only and should not be requested
for each submittal.
5How to Complete the PAR Form
- The supplier completes 1 - 7 with the
appropriate information. The grayed areas are
completed by Climate Control upon receipt of SVPP
Package.
6How to Complete the PAR Form
- 8 The Symbol field is used for reference symbols
as appropriate. - It is used to allow the actual dimension to
remain numeric, therefore enabling the automatic
calculations used in other portions of the
document. - Symbols may be used other than those shown.
7How to Complete the PAR Form
- 9 10 Whenever possible, use only numeric
values in these columns. - Under normal conditions, do not add units of
measure (mm, in, etc.) here. Again, this enables
automatic calculations. In the case of
documenting notes, please be as specific and
detailed as possible.
8How to Complete the PAR Form
- 11 Following the numeric format wherever
possible, enter the measured or observed values
for the actual samples. - When completing fields for notes, be as specific
as possible. In most cases OK will not be
accepted.
- Note the Green and Red formatting. This is used
as an aid to identifying out of spec conditions.
However, the supplier remains responsible for
identifying in-spec and out-of-spec conditions. - This is automatic when purely numeric values are
used and when the nominal and tolerance values
are completed correctly. - In the case where non-numeric values are used,
the format defaults back to black. This is OK.
9How to Complete the PAR Form
- 17 The supplier is responsible for completing
these columns with either Y or N. - If numeric data is used properly, this column
should complete automatically. For notes and
other non-numerical data, VALUE! or similar
may appear. If so, manual completion is
necessary. - If the data does not meet the specifications, the
supplier must initiate communication with Climate
Control to determine the next action.on results.
- The extent that these fields are completed are at
the discretion of the receiving plant.
10How to Complete the PAR Form
Questions????
11Examples of Completed FormsSheetmetal Assembly
Example
Example of a top level sheetmetal assembly. (As
Purchased)
12Examples of Completed FormsSheetmetal Assembly
Example
The SVPP requirements would cascade as shown
here.
13Examples of Completed FormsSheetmetal Assembly
Example
14Examples of Completed FormsSheetmetal Assembly
Example
15Examples of Completed FormsCable Assembly Example
16Questions????