Positive Train Control The impact of legislative changes - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Positive Train Control The impact of legislative changes

Description:

Enables a train to know it's movement authority and take action to remain within it ... Human error remains one of the most significant factors ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 21
Provided by: Inter66
Category:

less

Transcript and Presenter's Notes

Title: Positive Train Control The impact of legislative changes


1
(No Transcript)
2
Positive Train ControlThe impact of legislative
changes
  • SCORT
  • Chris Heald
  • September 22, 2009

3
What is Positive Train Control
  • PTC is a system that has been mandated in Federal
    law that is required to
  • Reduce the risk of train to train collisions
  • Reduce the risk of overspeed derailments
  • Provide additional work zone protection
  • PTC is infrastructure / locomotive / office based
    system
  • Enables a train to know its movement authority
    and take action to remain within it

4
Why PTC, Why Now?
  • Current position
  • Safe transportation of freight and passengers
  • Occasional accidents
  • Human error remains one of the most significant
    factors
  • PTC provides oversight of human actions to reduce
    risk
  • Technology is available
  • Cost benefit will never be positive on safety
    alone

5
When is PTC needed?
  • RSIA 2008 requires
  • PTC in place by December 31, 2015
  • PTC Implementation Plan (PTCIP) submitted to FRA
    by April 16, 2010

6
Where is PTC needed?
  • In general (with some exceptions)
  • Commuter or Intercity passenger rail routes
  • High volume, high risk (PIH TIH) freight

7
How it works
  • Train is intelligent
  • Movement authority advised by wayside
  • Speed Tachometer, GPS
  • Track topography on board database
  • Cab Location - GPS or Transponder
  • Train length manual input
  • Direction GPS or Transponder
  • Civil and temporary speed limits database and
    manual data update via radio
  • Braking capability braking algorithm (verified
    through testing), train consist (manual), train
    weight (manual)

8
How it works
9
How - Technology?
  • 2 main technologies
  • GPS and radio based
  • Track based transponder and radio based

10
How - Technology?
  • GPS and radio based
  • V/ETMS, ITCS
  • GPS location within 10 feet
  • Could be effected by mountains, buildings,
    tunnels.
  • Data rate limit may mean train speed lt125mph
  • Class 1s working on Wabtec V/ETMS solution with
    interoperability

11
How - Technology?
  • Track based transponder and radio based
  • ACSES
  • Location verification by transponder with
    tachometer based intermediate positioning
  • Suitable for use for high speeds
  • Suitable for use in tunnels
  • Transponders installation and maintenance
    intensive
  • North East Corridor (Amtrak Acela NJT / SEPTA /
    MBTA / MNR / LIRR) will remain ACSES

12
How - Technology Selection Factors
  • Technology choice of other shared users
  • PTC Type Approval status
  • Suitability
  • Cost
  • Availability

13
How?
  • System-wide areas impacted
  • Locomotives / Cab Cars
  • Wayside
  • Signals
  • Central Control
  • IT

14
Implications for the States
  • Inputs
  • Project Funding tax mechanisms, investment
    deferment, loans
  • Project Resources
  • Outputs
  • Improved safety
  • Improved infrastructure use
  • Improved energy use
  • Opportunities for future rail services

PTC
15
Cost
  • 10bn to 17bn over next 20 years

Back Office
Wayside
Vehicles
16
Benefit
  • FRA identify 1Bn in safety benefits
  • Business benefits intentionally not identified
  • Fuel savings from train pacing
  • Cost and Emission reduction
  • Reduced Risk
  • reduced liability exposure

17
Way Forward
  • Freight Railroads, Passenger Railroads, and
    Infrastructure owners need to work together
  • Identify lead for PTCIP joint submissions
    illustrate better system coordination between
    stakeholders

18
Conclusions
  • April 16, 2010 is less than 7 months away
  • All passenger railroads need an implementation
    plan
  • PTC is a wayside, office, and vehicle system
  • Take action now

19
Thank you
P
C
T
P
T
C
  • PARTNERING TO ACHIEVE THE VISION

20
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com