Z-06-07 (Nye/Neal) - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Z-06-07 (Nye/Neal)

Description:

One application to rezone approximately 44 acres from RU-4 to TR-36 for purposes ... access improvements that result in safe ingress off of and egress onto Highway 90. ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 14
Provided by: SMon
Category:
Tags: ingress | neal | nye

less

Transcript and Presenter's Notes

Title: Z-06-07 (Nye/Neal)


1
Z-06-07 (Nye/Neal)
  • One application to rezone approximately 44 acres
    from RU-4 to TR-36 for purposes of establishing
    two residential subdivisions with a total of 44
    proposed dwelling units in the Babocomari Plan
    Area.

2
Summary of Requests
Z-06-06 Z-06-06
Parcel 106-15-021D (Nye) 106-15-021P (Neal)
Parcel Size 36 acres 8 acres
Existing Zoning RU-4 RU-4
Proposed Zoning TR-36 TR-36
Growth Category B B
Plan Designation LDR-1 LDR-1
Number of Units 36 8
3
(No Transcript)
4
(No Transcript)
5
106-15-021P (Neal) / Southward View
6
106-15-021D (Nye) / Southwestward View
7
Water Budget
  • RU-4 projected consumption (11 lots) 10
    ac-ft/yr
  • TR-36 projected consumption (44
    lots)10ac-ft/yr???
  • ADWR urban standard of 110 gpcd vs. 312 gpcd for
    RU-4
  • Building Envelopes 15,000 sq. ft.
  • Turf Limits
  • Drought-Tolerant Landscaping
  • Hot Water Recirculation
  • Storm Water Recharge
  • Septic System Recharge
  • Mesquite Removal nixed
  • Northern Sunrise Water Company

8
  • Protests and Support
  • None to date

9
Factors Favoring Approval
  • 1. Rezoning to TR-36 in areas designated as LDR-1
    achieves a gross density no greater than one
    house per acre and is in substantial conformance
    with the Babocomari Area Plan.
  • 2. The housing stock in the county would increase
    through subdivision rather than lot-splitting.
  • 3. The TR-36 district is a logical transition
    from the GB to the west and TR-18 to the north to
    the RU-4 to the east.
  • 4. As a part of the Countys subdivision process
    and as required by ADOT, the developers of the
    subject parcels must collaborate with other
    developers in providing access improvements that
    result in safe ingress off of and egress onto
    Highway 90.
  • 5. The proposed subdivisions would be served by a
    water company (rather than individual wells),
    would be subject to water conservation CCRs, and
    would be required to consume no more water than
    if the zoning remained RU-4..

10
Factors Favoring Denial
  • 1. Road improvements to accommodate the
    additional traffic generated by the proposed
    subdivisions would be necessary.
  • 2. Overall density would increase four times over
    that which would occur under existing zoning.

11
Planning Zoning Commission Recommendation
  • On June 14, 2006, the Planning Zoning
    Commission voted 4-2 (Guy and Walters opposed) in
    favor of forwarding a recommendation of approval
    of these rezoning requests with the
    aforementioned conditions to the Board of
    Supervisors.

12
Staff Recommendation
  • The Planning Department recommends approval of
    these rezoning requests, subject to the following
    conditions
  • 1. A subdivision review process will be required,
    all development shall be in substantial
    conformance with the rezoning application, and
    the maximum number of dwelling units will be 44
    (36 Nye, 8 Neal).
  • 2. Prior to any subdivision plat approval, the
    applicants shall commit to a development
    agreement or other acceptable mechanism
    specifying the funding, timing, and
    responsibility for improvements stipulated in the
    TIA.
  • 3. Prior to any subdivision plat approval, the
    applicants shall participate in a comprehensive
    hydrology report to address the areas drainage
    and floodplain issues.

13
Staff Recommendation
4. Prior to any subdivision plat approval, the
applicants shall adequately demonstrate in a
revised water budget that, through additional
conservation measures such as storm water capture
and recharge, projected water consumption will
not exceed 10 acre-feet per year. A reduction in
the number of dwelling units may be necessary to
achieve this goal. 5. All future subdivisions
shall include specific disclosure language in the
general notes and CCRs regarding military
activities in the area as drafted and approved by
Fort Huachuca.
Write a Comment
User Comments (0)
About PowerShow.com