SCT Services Installation
  • Type IV
  • PP3
  • Type II-III and PP1
  • Testing Installation Plan

Workpackage https//edms.cern.ch/document/593278/
SCT Cables Web page http//www-atlas.lbl.gov/cioci
o/SCTcables/
2
Status of Type IV Cables
  • Cables production
  • resumed in February after 3 months stop
  • See ID week February 06
  • Delivery of doubles harnesses completed (April)
  • 2125 double harnesses (4250 cables)
  • Installation
  • All racks in US side 2 USA racks were installed
    last year by TC Russian teams
  • Installation resumed at the end of March with a
    new TC team (French)
  • Very slow startup, safety issues, wrong usage of
    labels, mistakes
  • Completion of USA side was expected by the end of
    May
  • But lt50 done
  • Russian teams will take over 1-2 racks expected
    completion end of June
  • Need to test last 200 cables for acceptance
  • Need to test after installation to be able to cut
    extra length to liberate floor in USA15
  • Connector in situ (CPE)
  • All connectors (2000) in US15 completed on March
    10 (a few were left but they are done now)
  • Many racks are tested before and after plug into
    PS (Petr with Prague team)
  • Very good yield but some rework was necessary
  • One rack needs cables rerouting (cables were cut
    too long by previous company)

Racks on Level 6 US side
3
In USA15 back of racks
4
In USA15 front of racks
5

In USA15
6
PP3
  • Remaining units and parts about to be finished
    and will be sent soon
  • Scott will come back (June 13) for 4-6 weeks
  • Much of the installation done but lots of work to
    complete all racks
  • Most of subracks of 30 units installed
  • Need 7 subracks to complete all installation and
    special subracks
  • Some subracks sitting by racks to be installed
  • Only a small fraction of cables are plugged in
  • Issue with schedule
  • Rework for damages, shorts, bad assembly had to
    happen when needed but only occasional technical
    help was available
  • Problem of not having all the parts in hand,
    hence cant complete racks under installation
    right now (very bad!)

7
PP3
Units sliding off
8
PP3
PP3
  • Sealant silicone instead of silicone glue was
    used at some point
  • Only one spot instead of 5 spot pattern

9
Type II/III PP1 Production
  • INEO/Thurmelec are making type II-III cables in 2
    steps
  • double length harnesses as they receive
    information about the lengths
  • type II cable and type III spliced
  • type II FCI/JST connectors on both ends of double
    harness
  • Single length cables with FCT connector (PP3) are
    produced when length finalized with test cable
    measurement from cryostat to PP3 racks sector by
    sector
  • Delivery rate reached 300 cables/week
  • We are ahead with cable preparation!
  • So far good quality
  • No fatal defect found on some cables (the color
    coat is gone is some section/pattern but kapton
    insulation OK)
  • Fatal defect (but repairable) found on 2-3 cables
  • Only a few cables failed acceptance
  • PPB1 clamps, clips, cable tray covers were
    late, not used yet during installation
  • Clamp mounting started
  • Clip under production
  • PPF1 most parts available
  • Found the best way to crimp group of drain wires
    in a ferrule and catch the ferrule with the grub
    screws into clamps holes

10

Type II/III cables Defects
11
Bad work during preparation!
12
Type II/III cables Installation
13
Type II/III cables Installation
  • 2300 cables installed
  • ½ bundle /day/side/team
  • 48 cables/day but may reach 100
  • Old problems
  • (Details given in April SCTSG)
  • Problem with testing related to the grounding in
    cryostat (OK)
  • Mechanical problems to fit layers of 6 cables
    between cover/clamp holder pins (all cables
    installed have been retrofit)
  • Clamp installation
  • Yield
  • lt1 cables to replace
  • - Mechanical defects
  • - Damage during installation and preparation
  • - Failed electrical test

14
Type II-III by Sector
US PP3 racks
USA PP3 racks
336 Barrel 247 EC
336 Barrel 247 EC
Level 8
Level 7
384 Barrel 494 EC
384 Barrel 494 EC
Level 5 2
Level 6
336 Barrel 247 EC
336 Barrel 247 EC
Level 2
Level 1 2
15
SCT Services Sequence
  • Sector 5 (top) and Sector 13 (bottom)
  • heater cables, and DCS cables (completed)
  • Sector 9 - Installation completed on May 1
  • 878 SCT cables (384 Barrel, 494 EC)
  • 18 Fibre cables (EC)
  • Sector 3 - Installation started May 2
    completed last week
  • 583 SCT cables (336 Barrel, 247 EC)
  • 27 Fibre cables (9 EC,18 Barrel)
  • Sector 1 - started in parallel 2 weeks ago
    will be completed this week
  • 878 SCT cables (384 Barrel, 494 EC)
  • 18 Fibre cables (Barrel)
  • Sector 7 first 300 cables arrived
    installation in parallel just started
  • 583 SCT cables (336 Barrel, 247 EC)
  • 27 Fibre cables (9 EC,18 Barrel)

16
Schedule
  • Type II-III installation should be completed by
    mid-July
  • (according to current schedule from TC)

Our schedule
  • Type II-III installation mid-July (Barrel)
  • Type IV installation end of June(?)
  • Connector in situtesting end of July(?)
  • PS crates end-June (US side) July-Aug (USA
    side)
  • PP3 assembly, installation end of June
  • All cables plugged into PP3 mid-July-August(type
    IV) for type II-III later
  • We need continuous presence of people at CERN at
    least until mid-July
  • (and later in August)
  • Critical area in the type II-III acceptance,
    installation and testing
  • SCT participation very valuable to add to people
    who are resident

17
Installation Testing Activities
Activity Resident Additional
Type IV Acceptance test Test in rack after installation Test of cut cables after connector in situ work Tomas (Prague) 3
Plug-in cables into PS crates Test with feedtrough Petr (Prague) Prague 2
Type II-III Preparation Acceptance test (partial) Visual inspection Folding the shield and cut it the right amount, fix it Organize boxes with right cables to send for installation Jessica (UCSC) Kuo-Ming (Sinica) 4
Type II-III Installation Mount dPPB1 and dPPF1 (Barrel) Squeezing the cables to fit between pin and clamp holder Plug-in of the delicate JST/FCI connectors to dPPB1 Placing the clamp (now), placing the clip (later) (ENDCAP) crimp group of drain wires in a ferrule and catch the ferrule with the grub screws into clamps holes Plug in the dPPF1 Jacek (Crakow) 1
Type II-III Testing Alexandre (Dubna) 3
PP3 Burn-in of units Assembly into subracks Installation into racks of subracks Plug-in the cables to PP3 Scott (Melbourne) 1
Test of whole chain 2
18
Plan
19
Issues
  • PP3
  • Help is coming next week but continues to be
    difficult to keep up with technical problems and
    missing subracks
  • Connector damage
  • In US15 they are left too long on the floor
  • Other cables installation interference
  • Tester
  • Different flavor that work with different
    configuration of cable chain
  • Multiple laptops failure (ok now)
  • Spares installation for type II-III cables
  • We dont have spares of every flavor need
    rework to get the right one in place
  • Defective dPPF1
  • Some faulty cables were actually due to a bad
    channel on dPPF1 still missing some dPPF1
  • Type III installation testing
  • Difficult conditions for testing
  • Extra length to reroute on additional trays
  • Dedicated team (Russian) available to plug-in but
    need assistance (and all cables tested)
  • Type IV installation
  • Very inefficient and need extra interaction with
    new team
  • Interference with type II-III installation and
    blocking connector in situ work

20
To work on cabling
  • http//www.hep.phy.cam.ac.uk/si-bin/sctworkplanner
    .cgi
  • To sign up for shifts (and contact me because of
    unexpected changing in rate delivery/testing
    problems)
  • Safety courses
  • 1) basic safety training course (level 1-2-3
    video in B55)
  • http//safety-commission.web.cern.ch/safety-commi
    ssion/SC-site/sc_pages/training/basic.html
  • 2) Level 4 for working in US15 Oxybox (we have
    them)
  • If you have an AIS LOGIN (used for EDH
    documents), you can follow the course from
    anywhere
  • (even outside CERN) with AIS login by accessing
    http//sir.cern.ch.
  • If you have no AIS LOGIN, you need to register at
    the following address level4.training_at_cern.ch
  • 3) Level 4A mandatory to enter the ATLAS
    underground areas
  • This course is composed of 4 modules Cryogeny,
    Evacuation, Installation and Magnet. Each of
    these modules is followed by a small test which
    you have to take and pass.
  • If you do not yet have an AIS login, please
    contact the ATLAS secretariat and ask
    for this AIS account (they must be registered
    with ATLAS). If this is not possible, we will
    organize special training at CERN.
  • 4) make the access request on EDH
  • 5) get your safety boots helmet (or borrow
    them)
  • TRY TO GET AS MUCH AS POSSIBLE DONE BEFORE COMING
    TO CERN

21
LINKS Summary
  • SCT Cables Web page
  • http//www-atlas.lbl.gov/ciocio/SCTcables/
  • Mapping, technical appendices, cables related
    documents
  • https//edms.cern.ch/document/624679/1
  • Shifts
  • Shift planner (developed by D. Robinson) works
    very well for planning the activities and have
    people to sign up
  • http//www.hep.phy.cam.ac.uk/si-bin/sctworkplan
    ner.cgi
  • Safety courses
  • Level 1-2-3 basic course for access underground
    and point 1
  • http//safety-commission.web.cern.ch/safety-commis
    sion/SC-site/sc_pages/training/basic.html
  • Level 4 with AIS login http//sir.cern.ch.
  • Level 4A AIS login
  • Overall Safety and Health Procedure Document
    PPSPS
  • https//edms.cern.ch/document/593278/
  • Rack Wizard
  • http//atlas.web.cern.ch/Atlas/TCOORD/Activities/I
    nstallation/Database/rack.htm
Write a Comment
User Comments (0)
About PowerShow.com