Forestry Fuel Switch Pilot Project Replication

December 14, 2005 h. Anel, Sofia
Yeni Katsarska FSPP Coordinator
2
Project description (1)
  • Location South from Stara Planina
  • Towns of Smolyan, Chepelare, Bansko, Karlovo,
    Municipalities of Ardino, Suedinenie, Dryanovo,
    Malko Turnovo
  • Close location to high density of forest
    resources and wood processing industries
  • Existing situation
  • Municipal buildings with light fuel oil (LFO)
    fired heating installations from early 60s to 80s
  • high emissions of CO2 and SO2
  • high energy loses and related high expenses
  • poor working and education conditions

3
Project description (2)
  • Project type and objectives
  • 28.3 MW installed capacity fuel switch from
    light fuel oil (LFO) to woody biomass
  • reduction of GHG and stimulation of
    silvicultural activities
  • Project size
  • - Small scale scenario, opportunities to double
    replaced capacities twice
  • Project stakeholders
  • - Municipalities
  • - National Forestry Board
  • - Ministry of Economy and Energy and Ministry of
    Environment and Water

4
Project description (3)
  • Sector background
  • - high GHG emissions
  • high fuel prices, incl. coal, LFO and gas
  • available, but insufficient utilization of wood
    residue from thinnings and other silvicultural
    activities
  • Framework Convention on Climate Change
  • - ratified the UNFCCC
  • - ratified the Kyoto Protocol
  • - possible implementation of KP mechanisms
  • - possible implementation of Green Investment
    Scheme

5
Project sites (1)
  • Smolyan
  • Municipal buildings, schools and private
    consumers
  • - total installed capacity 2x4MW8MW
  • - necessary investment appr. 5 mln. Leva
  • - feasibility study, energy audit
  • Chepelare
  • Municipal buildings and schools
  • - total installed capacity 4x0.3kW1.2MW
  • - necessary investment appr. 0.72 mln. Leva
  • - feasibility study, energy audit

6
Project sites (2)
  • Bansko
  • Municipal buildings (12), 5 schools, 14 hotels
    and private consumers
  • - total installed capacity 2x5MW10MW
  • - necessary investment appr. 10 mln. Leva
  • - design
  • Municipal buildings and schools,
  • - total installed capacity 6x0.5kW4x0.3kW4.2MW
  • - necessary investment appr. 2.37 mln. Leva
  • - feasibility study, energy audit
  • Karlovo

7
Project sites (3)
  • Suedinenie
  • Municipal buildings and schools,
  • - total installed capacity 1x0.5kW5x0.3kW2MW
  • - necessary investment appr. 1.2 mln. Leva
  • - feasibility study, energy audit
  • Dryanovo
  • Municipal buildings and schools,
  • - total installed capacity 6x0.3kW1.8MW
  • - necessary investment appr. 1.07 mln. Leva
  • - feasibility study, energy audit

8
Project sites (4)
  • Malko Turnovo
  • Schools
  • - total installed capacity 2x0.25kW0.5MW
  • - necessary investment appr. 0.3 mln. Leva
  • - feasibility study
  • Municipal buildings and schools,
  • - total installed capacity 2x0.3kW0.6MW
  • - necessary investment appr. 1.07 mln. Leva
  • - feasibility study
  • Gorno Prahovo
  • And Mlechino

9
Project baseline
  • Baseline scenarios
  • - switching from LFO to natural gas
  • High costs, limited opportunities for
    gasification
  • business as usual, i.e. continuing to use of LFO
  • High costs, exhausted technical equipment,
    environmental pollution, poor working conditions
  • Emissions reductions through fuel switch
  • 28 000 tCO2e annually
  • Not included reductions of methane from
    decomposing of stored wood residue (global
    warming factor 21)

10
Project financing
  • Total investment costs approx. 21.73 mln. Leva
  • Depending on technical equipments country of
    origin necessary investment could increase up to
    40
  • Municipalities from 20 to 30
  • -less developed municipalities up to 20
  • National Funds up to 30
  • Environmental and energy efficiency soft loans
    (substations and heat distribution network)
  • National and/or international investors 40

11
Benefits
  • Environmental
  • - greenhouse gases emissions, sulfur dioxides
    and nitrous oxides reduced
  • Forestry
  • - establishment of a market for shedding from
    forestry activities
  • - increased forests sustainability and minimized
    fire risks
  • - reinvestment of additional financial income
  • Economical
  • - high return of investments, 25-30 reduction of
    heat energy expenses
  • Social
  • - ensured permanent heat supply and comfort
  • - additional permanent and temporary employment

12
Contacts (web-page will be accessible until
January 2007)
FSPP www.fdpbg.org forestrybg_at_fdp-bg.org y.kats
arska_at_fdp-bg.org tel./fax 989 0865
Write a Comment
User Comments (0)
About PowerShow.com