Transcript and Presenter's Notes

Title: Project Transapex


1
Project Transapex
  • David Stewart
  • March 2006

2
Agenda
  • TransApex Overview
  • Update
  • Conclusions
  • Questions

3
Project TransApex overview
  • Ensure Brisbane has an effective orbital road
    system to move people and goods effectively
  • TransApex
  • provides new river crossings
  • direct access to Port and Airport
  • removes traffic from CBD and inner suburbs
  • directly connects existing motorways and major
    arterial roads and reduces burden on many
    arterial roads
  • provides alternative cross-city routes
  • enhancement opportunities for public transport
    and for urban renewal opportunities
  • 4B investment with around 3B to be raised
    through a user pays system

4
  • What is TransApex?
  • North-South Bypass Tunnel - 2009
  • Airport Link - 2012
  • Hale Street Link - 2010
  • Northern Link -2016
  • East-West Link after 2026

5
Arterial Road reductions with TransApex
  • Lutwyche Rd -30
  • Sandgate Rd -40
  • Milton Rd -40
  • Coronation Drive -50
  • Kingsford Smith Drive -5
  • Captain Cook Bridge -15
  • William Jolly Bridge -35

6
North-South Bypass Tunnel
7
Project Scope
  • Two separate tunnels
  • Approximately 5km long
  • Connections to existing freeways and arterials
  • ME systems including ventilation, lighting, fire
    protection, communications and security
  • Traffic Control Centre
  • Traffic management facilities
  • E-toll facilities

8
(No Transcript)
9
Preferred Proponent
  • RiverCity Motorway
  • Leighton Contractors
  • Baulderstone Hornibrook
  • Bilfinger Berger Concessions
  • ABN AMRO

10
(No Transcript)
11
Airport Link
12
Detailed Feasibility Study
  • Jointly funded by Queensland Government and
    Brisbane City Council Detailed Feasibility Study
  • 12 month Study
  • Three Key Phases

13
Airport Link
Preliminary concept design
  • March 2006
  • Proposed route
  • Possible location and design of connections at
    Kedron and Toombul
  • Bowen Hills connection expected to be ready for
    consultation in May 2006

14
Toombul
15
Kedron
16
Other Studies
  • Northern Busway (Translink)
  • Inner Northern Regeneration Precinct (OUM)

17
The Study Process
18
(No Transcript)
19
Hale Street Bridge
20
Hale Street Bridge
  • The Hale Street Link is an important cross-river
    connection between the suburbs of Milton and
    South Brisbane
  • A cross-river connection that services above
    suburbs
  • Hale Street supports developments planned in
    Montague Road, access to the Cultural precinct,
    Southbank and improves access into the western
    gateway of the City
  • About 300m long
  • Open 2010 - Traffic 35,000 in 2026
  • Capex 200 mill

21
Hale Street 3D Animations
22
(No Transcript)
23
(No Transcript)
24
The way forward
  • Engineering options to resolve pedestrian
    (covered walkway), cycle and traffic movement
    issues
  • Community and key stakeholder consultation
  • IAS and Business Case interim findings in April
    2006.
  • A decision will then be made by Council whether
    to proceed or not.
  • A Draft IAS would likely be issued in mid 2006.
    Following a consultation period the Final IAS
    would then be subject to Councils decision to
    approve.
  • If approved construction commences in 2007.

25
Northern Link
Project TransApex and
26
Northern Link
27
(No Transcript)
28
Conclusions
  • Brisbane is growing rapidly and is constrained by
    its current infrastructure
  • TransApex delivers a regionally significant road
    and freight network that will promote economic
    and social well-being

29
Green Bridge Project
30
Green Bridge
31
Green Bridge
32
Green Bridge
33
Questions?
Questions?
34