1Dedusting of Exhaust Gases to Optimize Fuel Use
By A TEC AMERICA Ing. Jonathan Forinton At
FICEM/APCAC XV Technical Conference 2008 in
Panama
2Content
- Situation - what plants have today?
- Aim of the Project A TECs investigation
- Issues Testing overview and results
- Solutions A TECs proposed configuration
- Results from some reference plants
- Next steps
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
3Situation Requirement in plants
- Requirement for hot gas to dry coal best served
by kiln exhaust gas - Exhaust gas contains dust due to imperfect
separation in top stage cyclones - Raw meal dust in exhaust causes higher operating
costs
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
How much dust? 3000 t/d CF 1.6 Cyclone ?
93 ? Feed 200 t/h Dust 14 t/h (60
g/Nm3)
NEXT STEPS
4Situation Extra operating costs
- Transporting the dust to the mill
- Pressure loss is directly proportional to dust
load - ? Kiln ID fan energy increase approx 35
- Long distances between pre-heater and mill, Dust
in duct needs manual cleaning out. - ? Extended shut-down activities time
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
5Situation Extra operating costs
- Milling the dust
- Since raw meal is generally finer than coal,
costs in milling appear negligible, however - ? Separator energy increase approx 10
- Coal Transport air
- Transport air
- Coal 0.2 m3/kg Anthracite 0.5 m3/kg
- ? Transport energy increase by approx10
- ? Heat up extra cold air (small effect only)
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
6Situation Effect on operation
- Operating
- Raw meal in burner fuel supply does not mix with
coal (pulsing of meal coal) - ? Upsets fuel control, emissions
- Silica in raw meal can affect clinker quality
- ? Upsets customers
- Maintenance problems on burner tip
- ? Lower availability of kiln
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
7Aim of the project
- Investigate how to reduce dust content as far as
possible - Investigate which cyclone type is best?
- Refine plant GA configurations
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
A TEC Technical Centre Austria
8Issues - Testing
- Any option has to consider balance between
pressure drop and separating efficiency - ? A TEC investigated 4 cyclone types
SITUATION
AIM OF THE PROJECT
ISSUES
- HURRICLON 3 ST
- HURRICLON, special design to get the best
possible separation, even a pressure drop up to
2000 Pa is acceptable. - C1 Normal cyclone elongated cylinder
- C2 Normal cyclone
SOLUTIONS
RESULTS
NEXT STEPS
9Issues Summary of Test
HU HURRICLON Cyclone
C Normal Cyclone
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
Cyclone HU HU Special C1 C2 Efficiency
64 71 49 59 Pressure loss
Pa 950 1800 950 1900
10A TEC PROCESS CENTER FLOW SHEET
11Solutions Testing Final Result
- CONCLUSIONS OF TESTING
- For coal mill application relatively low dust
load and fine grain size separation efficiency
of centrifugal separators is 30 to 70 - A separation efficiency of more than 60 was
clearly reached with HURRICLON 3 dedusting. - The best separation efficiency can be achieved
with a special cyclone but at too high pressure
loss! - A Cyclone with the same pressure loss as a
HURRICLON3 has a lower separation efficiency.
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
12Solutions Keeping good results
- Separation efficiency varies with inlet gas
quantity - In case of varying coal humidity (eg. seasons)
- Hot gas shared with other mills (eg. 2 mills)
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
With return cycle there is clearly a positive
influence on the separation efficiency.
13Solutions Final Proposal
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
- Flowsheet OPTICOAL
- Installation
NEXT STEPS
14Results Cemex-Saraburi 1
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
- This project was then copied to Line2
15Results Lafarge FR Cement
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
16Results Lafarge Fortune Cement
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
17Next Steps for A TEC
-
- The OPTICOAL idea has been applied successfully
to some other applications, - eg.
- For cleaning hot gases before Slag Grinding,
St. Lawrence Cement Mississauga plant 2008. - A TEC are looking for further applications in
cement, mining or waste industries.
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
18Thank you for your attention!
www.atec-ltd.com