Long distances between pre-heater and mill, Dust in duct needs manual cleaning out. ... For cleaning hot gases before Slag Grinding, St. Lawrence Cement ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 19
Provided by: andreateic
Category:

less

Transcript and Presenter's Notes

Title: PowerPointPrsentation


1
Dedusting of Exhaust Gases to Optimize Fuel Use
By A TEC AMERICA Ing. Jonathan Forinton At
FICEM/APCAC XV Technical Conference 2008 in
Panama
2
Content
  • Situation - what plants have today?
  • Aim of the Project A TECs investigation
  • Issues Testing overview and results
  • Solutions A TECs proposed configuration
  • Results from some reference plants
  • Next steps

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
3
Situation Requirement in plants
  • Requirement for hot gas to dry coal best served
    by kiln exhaust gas
  • Exhaust gas contains dust due to imperfect
    separation in top stage cyclones
  • Raw meal dust in exhaust causes higher operating
    costs

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
How much dust? 3000 t/d CF 1.6 Cyclone ?
93 ? Feed 200 t/h Dust 14 t/h (60
g/Nm3)
NEXT STEPS
4
Situation Extra operating costs
  • Transporting the dust to the mill
  • Pressure loss is directly proportional to dust
    load
  • ? Kiln ID fan energy increase approx 35
  • Long distances between pre-heater and mill, Dust
    in duct needs manual cleaning out.
  • ? Extended shut-down activities time

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
5
Situation Extra operating costs
  • Milling the dust
  • Since raw meal is generally finer than coal,
    costs in milling appear negligible, however
  • ? Separator energy increase approx 10
  • Coal Transport air
  • Transport air
  • Coal 0.2 m3/kg Anthracite 0.5 m3/kg
  • ? Transport energy increase by approx10
  • ? Heat up extra cold air (small effect only)

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
6
Situation Effect on operation
  • Operating
  • Raw meal in burner fuel supply does not mix with
    coal (pulsing of meal coal)
  • ? Upsets fuel control, emissions
  • Silica in raw meal can affect clinker quality
  • ? Upsets customers
  • Maintenance problems on burner tip
  • ? Lower availability of kiln

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
7
Aim of the project
  • Investigate how to reduce dust content as far as
    possible
  • Investigate which cyclone type is best?
  • Refine plant GA configurations

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
A TEC Technical Centre Austria
8
Issues - Testing
  • Any option has to consider balance between
    pressure drop and separating efficiency
  • ? A TEC investigated 4 cyclone types

SITUATION
AIM OF THE PROJECT
ISSUES
  • HURRICLON 3 ST
  • HURRICLON, special design to get the best
    possible separation, even a pressure drop up to
    2000 Pa is acceptable.
  • C1 Normal cyclone elongated cylinder
  • C2 Normal cyclone

SOLUTIONS
RESULTS
NEXT STEPS
9
Issues Summary of Test
HU HURRICLON Cyclone
C Normal Cyclone
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
  • Results of Test

NEXT STEPS
Cyclone HU HU Special C1 C2 Efficiency
64 71 49 59 Pressure loss
Pa 950 1800 950 1900
10
A TEC PROCESS CENTER FLOW SHEET
11
Solutions Testing Final Result
  • CONCLUSIONS OF TESTING
  • For coal mill application relatively low dust
    load and fine grain size separation efficiency
    of centrifugal separators is 30 to 70
  • A separation efficiency of more than 60 was
    clearly reached with HURRICLON 3 dedusting.
  • The best separation efficiency can be achieved
    with a special cyclone but at too high pressure
    loss!
  • A Cyclone with the same pressure loss as a
    HURRICLON3 has a lower separation efficiency.

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
12
Solutions Keeping good results
  • Separation efficiency varies with inlet gas
    quantity
  • In case of varying coal humidity (eg. seasons)
  • Hot gas shared with other mills (eg. 2 mills)

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
With return cycle there is clearly a positive
influence on the separation efficiency.
13
Solutions Final Proposal
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
  • Flowsheet OPTICOAL
  • Installation

NEXT STEPS
14
Results Cemex-Saraburi 1
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
  • This project was then copied to Line2

15
Results Lafarge FR Cement
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
16
Results Lafarge Fortune Cement
SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
17
Next Steps for A TEC
  • The OPTICOAL idea has been applied successfully
    to some other applications,
  • eg.
  • For cleaning hot gases before Slag Grinding,
    St. Lawrence Cement Mississauga plant 2008.
  • A TEC are looking for further applications in
    cement, mining or waste industries.

SITUATION
AIM OF THE PROJECT
ISSUES
SOLUTIONS
RESULTS
NEXT STEPS
18
Thank you for your attention!