Title: MPL Of THAI AIRWAYS INTERNATIONAL THAI
1MPLOfTHAI AIRWAYS INTERNATIONAL ( THAI )
- By CAPT. ANIRUTE SANGRIT
- ( Deputy Manager of Airline Initial Training
Department )
2AGENDA
- THAI FLEETS GROWTH
- PRESENT TRAINING
- WHY THAI IS INTERESTED IN MPL ?
- MPL DESIGN WORKSHOPS
- CHALLENGE BENEFIT
- FUTURE PLAN
3AGENDA
4THAI FLEETs (2008) (JUL,30,2008)
THAI FLEETS GROWTH
- AIRCRAFT TYPE NUMBER
- ATR 2
- B737-400 10
- A300-600 17
- A330-300 12
- B777-200/200ER/300 20
- B747-400 18
- A340-500/600 9
- TOTAL 88
-
510 YEAR PLANNING (2008-2017)
THAI FLEETS GROWTH
- NEW DELIVERY NUMBER
- A340-600 1
- A330-300 8
- A380-800 6
- A321 20
- B787-9 14
- Selection Process
- A380-800/B747-8/A340-600/
- B777-300ER/A350-1000/B787-10
- TOTAL 80
- (Phase out 53 A/C)
(30 JUL 2008)
31
6THAI FLEETS GROWTH
- PILOT STATUS
- 2008 1300 PILOTS
- 2017 2000 PILOTS (REQUIRED)
- PILOT RECRUITMENT
- EVERY YEAR, 60-80 OUT OF 1500 APPICANTS
PASS THE FINAL PSYCHOLOGY AND APTITUDE TEST
7AGENDA
8PREVIOUS TRAINING
PRESENT TRAINING
- AB INITIO PILOTS WERE TRAINED TO BE SYSTEM
OPERATORS (S/O) OF 3 MAN CREW AIRCRAFT - AFTER A COUPLE OF YEARS AS S/O, THEY GAINED
EXPERIENCE OF ROUTES, ATC COM, A/C SYSTEMS AND
MONITORED CAPTAIN OR FIRST OFFICER PERFORMING
TAKE OFF LANDING - WHEN THEY DID TYPE RATING COURSE TO BE CO-PILOTS,
MOST OF THEM LEARNED QUICKLY AND SUCCESSFULLY
9PRESENT TRAINING
- WHEN 3 MAN CREW A/C FADED AWAY
- HOW WOULD WE TRAIN AB INITIO PILOTS TO BECOME
FIRST OFFICERS ? - COULD THEY GO DIRECTLY TO RH SEAT ?
- WERE AVIATION KNOWLEDGE FLYING SKILLS OF CPL
SUFFICENT TO DO AIRLINE TYPE RATING COURSE ? - THAI FINALLY SET UP AIRLINE TRANSITION TRAINING
COURSE (ATT) IN 1999
10THAI AIRLINE TRANSITION TRAINING COURSE
PRESENT TRAINING
ATT
- - TO PREPARE NEW PILOTS TO FLY MODERNIZED
- AIRCRAFT IN AIRLINE ENVIRONMENT (COCKPIT
READY) - - A BRIDGE COURSE BETWEEN CPL AND TYPE RATING
- COURSE
- - GROUND SUBJECT KNOWLEDGE TO ATPL LEVEL
- - INTRODUCTION OF MCC/CRM
11AIRLINE TRANSITION TRAINING COURSE
PRESENT TRAINING
- (ATT)
-
- GROUND MODULES
FLIGHT MODULES
AVIATION ENGLISH
FLIGHT OPERATION
AIRCRAFT TECHNICAL SYSTEM
SAFETY EMERGENCY
AIRLINE BUSINESS
ATT SIM TRAINING
OBSERVATION FLIGHTS
4 MONTHS
2MONTHS
12GROUND MODULES
PRESENT TRAINING
- FLIGHT OPERATION
- RULES REGULATIONS
- ROUTE MANUAL (JEPPESEN TO LIDO)
- MCC CRM
- COMMUNICATIONS
- ENERGY MANAGEMENT
13GROUND MODULES
PRESENT TRAINING
- A/C TECHNICAL SYSTEMS
- - ELECTRICAL - FIRE PROTECTION
- HIGH SPEED - - HYDRAULIC - AIR CONDITIONING
AERODYNAMICS - - FLIGHT CONTROLS - PRESSURIZATION
- - LANDINGING GEAR - ICE RAIN PROTECTION
- - FUEL - AVIONICS
- - PNEUMATIC - AUTO FLIGHT
- - POWER PLANT - PERFORMANCE
14GROUND MODULES
PRESENT TRAINING
- SAFETY EMERGENCY
- - DANGEROUS GOODS
- - EMERGENCY EXIT
- - EMERGENCY EQUIPMENTS
- - EMERGENCY PROCEDURES
- - UNRULY PASSENGER HANDLING
- - WET DRILL FIRE DRILL
15GROUND MODULESAVIATION ENGLISH
AIRLINE BUSINESS
PRESENT TRAINING
- GENERAL ENGLISH - RESERVATIONS
- AVIATION ENGLISH - PASSENGER
TICKETING - - ICAO STANDARD PHASEOLOGY - PASSENGER
HANDLING - - ICAO VS FAA - BAGGAGE PROCESSING
- - LISTEN PRACTICE - DANGEROUS GOODS HANDLING
- VOLMET, ATIS
- ATC COM
- ATC ACCENTS IN DIFFERENT
- PARTS OF THE WORLD
16FLIGHT MODULESATT SIMUALOR TRAINING (
FTD/FFS )
INITIAL TRAINING
- JET FAMILIARIZATION MCC ROUTE
NAVIGATION LOFT -
(RN) -
17FLIGHT MODULES
PRESENT TRAINING
- 10 SESSIONS ( 40 HRS ) BY FFS OF B734 OR A306
- 3 JET FAM , 3 MCC , 3 RN , 1 LOFT
- INTRODUCTION OF MCC / CRM ( PF / PNF, TASK
- SHARING, CALLOUTS, ETC )
- AIRLINE SOP ( NORMAL ABNORMAL )
- OBSERVATION FLIGHTS IN LINE OPERATION
18TYPE RATING COURSE
PRESENT TRAINING
- TODAY B734, A306
- 1 MONTH 2 MONTHS
3 MONTHS -
(MIN 50 SECTORS) - FUTURE A321
- TOTAL TIME CPL (1YR)ATT (6M)TYPE (6M)
2YR -
-
GROUND CONVERSION
SIM CONVERSION SCHOOL FLIGHT DCA CHECK
FINAL CHECK CO-PILOT
ROUTE INTRODUCTION ROUTE TRAINING (I O E)
19AGENDA
- WHY THAI IS INTERESTED IN MPL PROGRAM ?
20WHY MPL PROGRAM ?
WHY THAI IS INTERESED IN MPL ?
- MPL HAS THE SAME CONCEPT OF TRAINING AS
THAI DOES - ATOs SHOULD HAVE A TRAINING PROGRAM TO
DIRECTLY - SERVE AIRLINESNEEDS ( CPL IS A SINGLE
PILOT OPERATION ) - PILOT TRAINEES SHOULD BE PREPARED TO WORK
AS A CO-PILOT IN MULTI-CREW
OPERATION - AFTER ATTENDING MPL SYMPOSIUMS AND
STUDYING MPL - PROGRAM THOROUGHLY, THAI BELIEVES MPL
PROGRAM IS AN EFFECTIVE WAY TO TRAIN FIRST
OFFICERS FOR TODAY S MODERNIZED AIRCRAFT -
21AGENDA
22MPL DESIGN WORKSHOP
- IN MARCH 2008, THAI INTRODUCED MPL PROGRAM
TO 3 FLYING SCHOOLS ( CATC, BAC, IAC NPU )
AND INVITED THEM TO SET UP MPL PROGRAM IN
THAILAND - THAI MPL WORKING GROUP CONSISTS OF
- 1. GROUND INSTRUCTORS FROM BOTH THAI
ATOs - 2. FLIGHT INSTRUCTORS FROM BOTH THAI
ATOs - 3. A REPRESENTATIVE OF THAI FLIGHT
SAFETY DEPARTMENT - 4. A DOCTOR FROM THAI PILOTS HELATH
FOLLOW UP DIVISION - 5. A REPRESENTATIVE OF THAI PILOTS
ASSOCIATION (THAIPA) - 6. DCA AS AN OBSERVOR / ADVISOR
23MPL DESIGN WORKSHOP
- 1ST MPL WORKSHOP WAS HELD IN PATTAYA
IN MAY 2008 - THE TASK OF THIS WORKSHOP WAS TO
DESIGN MPL PROGRAM - ACCORDING TO ICAO SCHEME AND GUIDELINES
AND BASED ON AVAILABLE RESOURCES OF EACH ATO - 2 nd MPL WORKSHOP WAS HELD IN BANGKOK IN
AUG 2008 - THE TASK OF THIS WORKSHOP WAS TO MAKE
MPL SYLLABUS - WITH COMPETENCY BASED APPROACH AND TEM
24Multi-Crew Pilot License Program (THAI)
25- Total 160 hr. of Training
- 110 hr. in aircraft
- - 45 hr. SE aircraft ( PPL )
- - 65 hr. SE ME aircraft
- ( Min. ME 25 hr. )
- 50 hr. in simulator
- -10 hr. FSTD Type I
- -40 hr. FSTD Type II
26Multi-Crew Pilot License Program (THAI)
27 Phase 3 of THAI MPL Program
- CONTENTS
- CRM ,TEM,LOFT
- NORMAL PROCEDURES
- ABNORMAL PROCEDURES
- MULTI- CREW COPERATION
- INSTRUMENT FLIGHTS
28THAI MPL INTERMEDIATE PHASE
MPL DESIGN WORKSHOP
CPT
FFS
FFS
FFS
FFS
-
- 6 JET FAM 6 MCC
6 ROUTE NAV 2 LOFT -
TOTAL 80 hrs
29LOFT
308) TG1232 HDY DMK
W/X DEVIATION
INTERMEDIATE LEVEL-OFF
HOLD AT PAULA FOR 15 MIN DUE TRAFFIC
A/P FAIL DURING RADAR
LOC 21R
ILS21R MAN
TCAS
DURING HOLD PASSENGER SERIOUSLY ILL REQ PRIORITY
LANDING
G/A DUE TO WIND SHEAR
T/O RWY O8
31Multi-Crew Pilot License Program (THAI)
32THAI MPL SYLLABUS PHASE 4
33(No Transcript)
34FFS-SYSTEM TRAINING
35FFS-SPECIAL OPERATIONS CHECK
36THAI MPL Scheme 1
29 May 08 TOTAL 112
hrs Actual Aircraft 190 - Synthetic
SIM 302 - PFPNF
37THAI MPL Scheme 2
29 May 08 TOTAL 112
hrs Actual Aircraft 190 - Synthetic
SIM 302 - PFPNF
38AGENDA
39FSTD
CHALLENGE BENEFIT
- SOME ATO DOES NOT EQUIP WITH FSTD TYPE
2 - THAI FFS LEVEL D NEED TO INSTALL ATC
SIMULATION - VISUALIZATION OF FSTD TYPE 3 IN DOC 9625
NOT YET APPROVED (180 DEG OR 200DEG ? )
40INSTRUCTOR QUALIFICATION
- DOC 9868 DOES NOT GIVE DETAILS OF MPL
INSTRUCTOR QUALIFICATION - ATOs CURRENTLY DO NOT HAVE INSTRUCTORS
WITH MCC EXPERIENCE
41COST
CHALLENGE BENEFIT
- EVEN IATA SUGGESTS MPL PROGRAM NOT
DESIGNED - TO SAVE COST OR TIME BUT AIRLINE
MANAGEMENT - HAS TO CONSIDER THE RESULT COMPARED
WITH - COST
- ATO HAS TO CONSIDER NUMBER OF CADETS IN
MPL - PROGRAM BEFORE THE PURCHASE OF FSTD
-
42COST
CHALLENGE BENEFIT
- CURRENTLY, TYPE RATING COURSE DOES 1
SCHOOL - FLIGHT(SF) IN FFS LEVEL D (ZERO FLIGHT
TIME) - AND 1 SF IN A/C FOR AB INITIO PILOTS
WHILE MPL - PROGRAM REQUIRES 12 AIRCRAFT T/O L/D
WHICH - HAS TO BE 2 SF
- 1 SF OF A330 COSTS US 13000
43 - BENEFITS OF MPL WORKSHOPS
- ATOs UPGRADE THEMSELVES TO DO ATPL
SUBJECTS - THAI AND ATOs ARE CONCERNED WITH
IMPROVEMENT OF FSTD AND PREPARED FOR MCC
INSTRUCTORS - CLOSE TIES AND GOOD RELATIONSHIP AMONG
THAI AND ALL ATOs (1 st TIME IN HISTORY
OF THAI CIVIL AVIATION ) - THE MOST DIFFICULT PART IS THE BEGINNING ,
THAI AND ATOs HAVE ALREADY OVERCOME THIS
PART.
44AGENDA
45FUTURE PLAN
- END OF 2008 , FINISH MPL SYLLABUS AND SUBMIT TO
DCA - 2009-2010 , UPGRADE FSTDs AND PREPARE MPL
INSTRUCTORs AND VISIT ATOs WHO HAVE ALREADY
TRAINED CADETS WITH THIS PROGRAM - MID 2010 , LAUNCH 1st THAI MPL PROGRAM AND SET UP
THAI MPL ADVISORY BOARD
46THAI AND ALL ATOs DURING WORKSHOP
47FIRST TIME IN THAI CIVIL AVIATION
48THANK YOU