Title: SPACE : AN EXPENSIVE AND LIMITED RESOURCE


1
SPACE AN EXPENSIVE AND LIMITED RESOURCE
  • MARIO BOUCHARD
  • DIRECTOR
  • PHYSICAL RESOURCES SERVICE

2
INTRODUCTION
  • Presentation of the Universitys campus
  • Cost of space
  • Hybrid model of management
  • Results and conclusion

3
UNIVERSITY OF OTTAWAS 3 MAJOR CAMPUSES
4
UNIVERSITY OF OTTAWA
  • 33,000 FTE (since 2001 50 increase)
  • 500,000m2 space
  • 3,000 parking space
  • 3,000 residents
  • 15 m2 / student FTE

5
TO CHARGE OR NOT TO CHARGE
  • Pros Ultimate accountability measure
  • Clear relationship
  • Cons
  • Cost and complexity
  • Lost of control
  • Hybrid model selected - Why?

6
WHAT IS THE COST OF SPACE?
  • Operation
  • 80 100 / m2 x 500,000 m2 ? 50M / year
  • (close to 10 operational budget)
  • Construction Current replacement value
  • 3,000 / m2
  • X 500,000 m2
  • 1,500M (1.5B)

7
SPACE MANAGEMENT
  • HYBRID MODEL DEVELOPMENT
  • -15 years ago - Good management of physical
    resources service
  • / m2 operation
  • / m2 construction
  • Not involved in space Management
  • 1. Restructuration space management transfer to
    our service
  • 2. Strategic planning good opportunity-
    potential
  • 3. Sustainability (reduce the waste) instead of
    building

8
HYBRID MODEL DEVELOPMENT
  • Measure and understand who is using what (good
    software)
  • Assessment of needs
  • Develop internal expertise
  • Establish clear and strong policies and standards
  • Managed classrooms and computer lab ? centrally
  • Local management supported centrally

9
Hybrid model- finance
  • Capital project financing (50/50)
  • Space optimisation project (Incentive 3M)
    Strategic plan Evaluation process Typical
    50/50
  • Refurbishing faculties and services 100
  • Base building and O/M -central
  • Note Similarities with Energy conservation

10
RESULTS
  • Moving away from fighting
  • Getting collaborative
  • incentive
  • part of the solution
  • Reinvestment into existing space
  • 150M in the next 5 years
  • Annual facility renewal from 3M to 5M /yearFCI
    reduction from 0.15 to 0.11
  • Reducing our environmental footprint
  • 1.15 ton of CO2 / FTE Targeting 1.0 ton in 2
    years

11
CONCLUSION
  • TO CHARGE OR NOT TO CHARGE
  • Space is expensive
  • Not required to charge
  • Hybrid model good results

12
CONCLUSION (contd)
  • Training tips ?SCUP
  • ? Specialized consultant
  • ? Space mining shop
  • (Algonquin College)

13