1
SCB1 Vault Test
Diagnostic box
ISAC-II Vault
SCB1
Level 0 refrigerator room
PS Rack
Buncher
Level 1 power supply room
Helium Dewar
Test Configuration
ISAC Beam
2
Goals
  • S-bend commissioning
  • First operation of refrigerator by TRIUMF
    personnel
  • Test services/cabling performance from final
    location
  • Identify cross-talk or environmental problems
  • Test rf performance with refrigerator in
    continuous delivery
  • accelerate some beam

3
Transfer Beamline
  • 26Mg6 at 1.5MeV/u from OLIS RFQ DTL
  • 35MHz buncher in beamline for matching to SCB1

Buncher
Straight Section
Vault Section
4
Diagnostic box
ISAC-II Vault
SCB1
Fast Faraday Cup Signal
Buncher
Test Configuration
1ns
ISAC Beam
Buncher on
5
Diagnostic box
ISAC-II Vault
SCB1
Profile Monitor Signal
Si Detector TDC Signal
Buncher
Solenoid on
Buncher on
ISAC Beam
6
ISAC-II Cryogenics
Cold Box
LHe Dewar
Compressor Room
7
Vault Test Plumbing
Cryomodule
LHe Supply (Transfer line)
VJ Flexiline He Exhaust
Vaporizor
He Warm Return
He Fixed Warm Return
LHe Dewar
8
Vault Test - LN2 Plumbing
Cryomodule
LN2 Supply (VJ line)
Vault Supply
VJ Flexiline N2 Exhaust
VJ Flexiline LN2 supply
Gas Meter
LN2 Phase Separator
N2 Fixed Exhaust
LHe Dewar
Continuously feed 4-5 ltr/hr LN2 to cool thermal
shield.
9
Helium Flow Schematic
Level SCB1HELVL2A
Vaporizer
To/From Compressor
SCB1 Cryomodule
Heater SCB1HTR32
LHe Dewar
Linde Coldbox
Heater SRSHEHTR
Level SRSHELVL1
10
Refrigerator Operation
  • Refrigerator operated in 24 hour continuous mode
    after an initial startup period.
  • ISAC-OPS monitors operation
  • LHe level in cryomodule and supply dewar
    regulated manually by heaters in each volume

SCB1 Level
Dewar Level
11
Medium Beta Cryomodule
  • SCB3 cold tests completed successfully
  • SCB1 assembled and cold tested
  • Goal Five modules completed by Dec. 2005

12
RF Operation
  • Three cavities locked at ISAC-II specification
  • 6MV/m, 106.08MHz, Pfor200W
  • Cavity 1 has an in-vacuum open circuit in the rf
    power feed
  • 24 hour test at ISAC-II specifications completed
    successfully
  • Refrigerator run in continuous feed cycle
  • Frequency tuners effectively track rf frequency
    to maintain lock over a large pressure variation
    in the helium space
  • Some noise problems with two of four rf amplifiers

24 hour
pressure
Tuner signals
13
Cavity Performance
  • All cavities met specification
  • Cavity 4 received a moderate rf conditioning
  • X-ray levels similar to Nov. 2004 cold test
  • Qo did not degrade during inactive period

14
Acceleration July 7
  • Injected 26Mg6 from ISAC at 1.5MeV/u into SCB1
  • Measured final energy with Si detector
  • Achieved 3.5MV acceleration from three cavities
  • Corresponds to average values of Ea7.4MV/m and
    Ep37MV/m
  • One cavity not operational

15
Cavity Calibration
  • Assume phi-25deg
  • Three different gradient set-points used

VeffEaLTTF/TT0cos(phi)