Title: EVAPOTRANSPIRATION BED
1EVAPOTRANSPIRATION BED
- Bruce Lesikar
- Associate Professor
- Texas Cooperative Extension
2Evapotranspiration Bed System
3Evapotranspiration Bed
4Evapotranspiration Bed-Materials
- Two beds for alternate loading
- Lined beds in permeable soils
- 20 mil plastic
- Concrete
- Gunite
- Clay with conductivity of 10-7 cm/sec
- Unlined beds in clay soils
- Bottom depth at least 12 below tank outlet
- Wicks between trenches for water removal
5Evapotranspiration Bed- Materials / Trench
- Trench for water storage
- Rock 3/4 to 2 diameter
- Chipped tires 2 diameter
- Gravel-less pipe
- Leaching chambers
- Other materials, does not dissolve
6Evapotranspiration Bed- Materials
- Perforated Rigid pipe
- 3 to 4 in diameter
- Drain holes for wastewater to exit pipe
- Distribution at top of media
- Geotextile fabric covering media
7Evapotranspiration Bed- Materials/ Fill
- Back fill with Class II soil
8Evapotranspiration Bed- Depth of Installation
- 18 minimum depth
- 36 maximum depth
9Evapotranspiration Bed- Treatment Method
- Pipe distributes wastewater to trench.
- Pores in media stores wastewater until
percolation into the soil. - Geotextile fabric keeps soil out of media trench
of gravel-less pipe. - Leaching chamber is not covered with fabric
- Unlined Soil provides treatment of some
wastewater. - Lined All water removed by evapotranspiration.
10Evapotranspiration Bed- Pretreatment Required
11Evapotranspiration Bed- Separation Distances
- Restrictive Horizons
- Groundwater Lined system
12Evapotranspiration Bed- System Sizing
Requirements/ General Description
- Evaporative surface is the top surface of beds.
13Evapotranspiration Bed-System Sizing
Requirements/ Surface Area Required
- Based on evapotranspiration rate.
- Area Daily Wastewater Flow / Loading Rate
- A 1.6Q / Ret
14Evapotranspiration Bed-Determine Configuration
of Beds
- Evaluate site dimensions.
- Evaluate required setback distances.
- Evaluate slope of site.
- Select be dimensions which fit site.