REVIVAL Assessment for the year 2004 report
Chevrollier  (WP1)
 TREN   Transport / Energy 
2
Plan of the presentation
  • Presentation of Chevrollier refurbishment
  • Presentation of work realized over
  • Building C
  • Building K
  • Building J
  • Divers
  • Conclusion

3
Presentation of Chevrollier refurbishment
Achieved in April 30th 2005
Not concerned by refurbishment
N/A
Concerned to refurbishment until April 2005
May 2005 to September 2006
Achieved in September 2004
Achieved in April 30th 2005
Atrium Achieved in July 30th 2005
4
Presentation of Chevrollier refurbishment
  • End of retroffiting (building J) September 2004
  • End of retroffiting (building K) April 2005
  • End of new building erection (building C) April
    2005
  • NEXT WORKS
  • Atrium with natural ventilation
  • Building G,F and E retrofitting May 2005 July
    2005
  • BEMS will be installed in May 2005, beginning of
    the monitoring June 2005

5
Building C SOUTH FAÇADE
Principal south facade ( concrete aluminium)
shading glazing windows
Angle of the building C and its shading
6
Building C NORTH FAÇADE
Sight in the future atrium (between C and G) The
atrium (ventilated naturally), will be completed
in July 30, 2005 Insulation on outside enveloppe
Insulation on outside enveloppe (in the atrium)
7
Building C ROOF
Fall of membrane of etancheïty (100 natural,
100 which can be recycled)
The photovoltaic cells will be exposed in south
orientation on this terrace
8
Building C CLASSROOMS
Sight in an interior room (laboratory). This
room will be in function in May 2, 2005
Future room of multi-media teaching    
9
Building C CLASSROOMS
Traditional classroom
10
Building C DIVERS
Corridor
Resumption of air
11
Building C DIVERS
Illumination under control (detecting of
presence, level of illumination probes)
Innovative air inlet grill by RENSON
12
Building C DIVERS
Double flow ventilation with rotate air exchange
13
Buildings J and K
K
J
Presentation of the buildings
14
Building K SLEEPING ROOMS
Detail of a room
Detail of a bathroom
15
Buiding K SLEEPING ROOMS
Corridor
16
Building J CLASSROOMS
1
2
3
Classroom (in function since October 1, 2004) We
see the management of the illumination (1), the
special innovative air inlet (2) and shading
components on outside enveloppe (3)
Corridor
17
Connection between building J and G (brought into
service in September 2004)
18
ANOTHER DETAILS
Courtyard with natural ventilation for Atrium
(will be achieved in July 2005)
Building site engines
19
ANOTHER DETAILS
Enterprises vehicules ( More informations in the
WP10 concerning to CO2 building stock budgeting )
20
CONCLUSION
  • Works progress in accordance
  • with the previous technology
  • With the previous planning









21
THANKS FOR ATTENTION