1REVIVAL Assessment for the year 2004 report
Chevrollier (WP1)
TREN Transport / Energy
2Plan of the presentation
- Presentation of Chevrollier refurbishment
- Presentation of work realized over
- Building C
- Building K
- Building J
- Divers
- Conclusion
3Presentation of Chevrollier refurbishment
Achieved in April 30th 2005
Not concerned by refurbishment
N/A
Concerned to refurbishment until April 2005
May 2005 to September 2006
Achieved in September 2004
Achieved in April 30th 2005
Atrium Achieved in July 30th 2005
4Presentation of Chevrollier refurbishment
- End of retroffiting (building J) September 2004
- End of retroffiting (building K) April 2005
- End of new building erection (building C) April
2005 - NEXT WORKS
- Atrium with natural ventilation
- Building G,F and E retrofitting May 2005 July
2005 - BEMS will be installed in May 2005, beginning of
the monitoring June 2005
5Building C SOUTH FAÇADE
Principal south facade ( concrete aluminium)
shading glazing windows
Angle of the building C and its shading
6Building C NORTH FAÇADE
Sight in the future atrium (between C and G) The
atrium (ventilated naturally), will be completed
in July 30, 2005 Insulation on outside enveloppe
Insulation on outside enveloppe (in the atrium)
7Building C ROOF
Fall of membrane of etancheïty (100 natural,
100 which can be recycled)
The photovoltaic cells will be exposed in south
orientation on this terrace
8Building C CLASSROOMS
Sight in an interior room (laboratory). This
room will be in function in May 2, 2005
Future room of multi-media teaching
9Building C CLASSROOMS
Traditional classroom
10Building C DIVERS
Corridor
Resumption of air
11Building C DIVERS
Illumination under control (detecting of
presence, level of illumination probes)
Innovative air inlet grill by RENSON
12Building C DIVERS
Double flow ventilation with rotate air exchange
13Buildings J and K
K
J
Presentation of the buildings
14Building K SLEEPING ROOMS
Detail of a room
Detail of a bathroom
15Buiding K SLEEPING ROOMS
Corridor
16Building J CLASSROOMS
1
2
3
Classroom (in function since October 1, 2004) We
see the management of the illumination (1), the
special innovative air inlet (2) and shading
components on outside enveloppe (3)
Corridor
17Connection between building J and G (brought into
service in September 2004)
18ANOTHER DETAILS
Courtyard with natural ventilation for Atrium
(will be achieved in July 2005)
Building site engines
19ANOTHER DETAILS
Enterprises vehicules ( More informations in the
WP10 concerning to CO2 building stock budgeting )
20CONCLUSION
- Works progress in accordance
- with the previous technology
- With the previous planning
-
21THANKS FOR ATTENTION