Title: Operation TCR
1Operation TCR
2nd of July to 10th of September 2001 More than
20 major events Events grouped by equipment group
and zone affected
- Niels.Schionnemann_at_Cern.ch
2Electrical events
- 19/08 1842 Electrical disturbance of 400 kV EDF
due to storm, main PS magnet tripped. No
electrical equipment switched off. - 1915 PS running again
- 19/08 2108 Compensator 1 BE tripped due to
storm. SPS and PS stopped. - 2121 PS running again
- 2140 Meyrin filters fall out. PS still ok
- 2214 Compensator in BE ok, SPS running
- 2229 Meyrin filters ok
- 20/08 0034 Compensator 1 BE tripped due to
storm. PS and SPS stopped - 130 PS and SPS running again
Niels Schionneman ST/MO/TCR
3Electrical events
- 20/8 0648 Short circuit in transformer EHT3 BE
- Transfo was idling but the short circuit caused
an unbalance in the network and made the
compensators trip. - Demi water off Prevessin and Meyrin
- PS and SPS stopped
- Electrical problem solved at 720
- Cooling PS ok at 920
- Cooling SPS ok at 1020
Niels Schionneman ST/MO/TCR
4Electrical events
- 29/8 1847 Explosion in 18kV breaker sub-station
7 - 7 18kV breakers in the PS loop trip
- The 66kV supply for the transfo SEH1 tripped.
Meyrin off tension - Auto transfer switched to EOS after 5 sec
- The 18kV trips due to malfunction of protection
equipment/selectivity problem - PS and SPS stopped for 24h
Niels Schionneman ST/MO/TCR
5CV events concerning PS
- 3/7 1420 Water leak alarm in PS
- Demanded access but found no leak. Drains were
blocked and condense water from air condition
caused the water level to raise - 1533 PS running again
- 4/7 2143 Cooling problem in 361
- MCR can not switch on main magnet due to high
temperature in 361 - Ventilator in cooling tower not running on max
speed - 2343 PS running again
Niels Schionneman ST/MO/TCR
6CV events concerning PS
- 15/7 901 PS demi water stopped
- A UPS supplying the PLCs for the demi water
stations had tripped due to water infiltration - UPS bypassed and PLCs and water stations started
- 1125 PS running again
- 19/8 243 and 719 Demi water station 359
stopped. PS stopped - Station stopped twice due to heavy storms.
Started station manually - 305 and 739 Cooling ok
Niels Schionneman ST/MO/TCR
7CV events concerning PS
- 20/8 1900 Demi water for TT2 stopped
- No beam for SPS
- No alarms received in TCR
- Magnet in TT2 supplied from TOF line. To be
changed - 2020 Cooling station in 378 started again
- 23/8 2015 Demi water temperature too high in
East area - Pumping station running on max
- Primary water temperature at 25 degrees due to
very warm weather. - Informing MCR. Situation unchanged all night
Niels Schionneman ST/MO/TCR
8CV events concerning PS
- 25/8 1510 Pump in cooling circuit for ISOLDE
exploded - ISOLDE stopped
- No fluid alarms in TCR, only electrical alarm
- Isolated pump and started spare pump
- 1540 Cooling ok
Niels Schionneman ST/MO/TCR
9CV events concerning SPS
- 6/7 1745 Temperature interlock on main magnet in
BA3. SPS stopped - Supply valve closed on primary side of heat
exchanger - 1938 SPS running again
- 9/7 1145 Temperature interlock on septum magnet
in BA6. SPS stopped - Pump stopped by faulty pressure sensor
- 1230 SPS running again
- 27/7 1025 BA6 cooling off. SPS stopped
- CV working on PLC for BA6 cooling. A faulty
Siemens module caused the station to stop - 1055 SPS running again
Niels Schionneman ST/MO/TCR
10CV events concerning SPS
- 2/8 1427 Demi water BA81 stopped due to water
leak. No beam for North area - Access to machine given but leak is not found
- Manages to start pumps and refill continuously
- 1539 North area beam back on
- 5/8 Compensator tripped due to missing cooling in
BA3. SPS Stopped - No alarms in TCR
- Cooling stopped due to problem with the PLC
- 1940 SPS running again
- 10/8 2040 Same problem as above
- 2130 SPS running again
Niels Schionneman ST/MO/TCR
11CV events concerning SPS
- 27/8 420 Cooling for septum magnet BA2 stopped.
SPS stopped - No alarms in the TCR. Pump restarted from TCR
- 422 SPS running again
Niels Schionneman ST/MO/TCR
12CV events concerning SPS
- 2/9 431 3/9 456 Demi water BA3 stopped. No
alarms in TCR - Problem seen when compensator in BB3 tripped
- SPS stopped for 1h each time
- Cooling stopped due to error in PLC
- 3/9 2359 Demi water for CAV2RF1 BB3 stopped
- SPS stopped for 3.5h
- Cooling stopped due to electrical problem on pump
for CAV2 circuit. Pumps started in forced mode. -
Niels Schionneman ST/MO/TCR
13Various events
- 14/7-15/7 RTserver crashes several times
- Different zones at Meyrin without supervision for
various periods. - Fire brigade instructed to do rounds and keep a
close eye on the synoptic. - 16/7 Bugs found and fixed by IN. Situation back
to normal. - 27/8 355 Vacuum sector valve closed TS1 and TS2.
SPS stopped. - 400 Valve in TS1 opened. OK for SPS
- 410 Valve in TS2 closes
- 412 Valve in TS2 opened. OK for SPS
Niels Schionneman ST/MO/TCR