Mission from Madrid Forum IV - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Mission from Madrid Forum IV

Description:

The gas industry was invited to present a state-of-play during the next ... Intensification of the Negotiation of bilateral OBA's at each. Cross Border Point ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 15
Provided by: bgt2
Category:

less

Transcript and Presenter's Notes

Title: Mission from Madrid Forum IV


1
Mission from Madrid Forum IV
  • 21. ... The Forum welcomed the proposals by GTE
    to develop new interoperability tools between
    TSOs to ensure non-discriminatory treatment of
    shippers including standardised communications
    protocols, harmonisation of definitions and units
    of measurement, Operational Balancing Agreements
    and the creation of an independent European Gas
    Industry Standards Board. ... The gas industry
    was invited to present a state-of-play during the
    next meeting of the Forum.
  • 22. The Forum stressed the importance of
    removing, as far as possible, barriers to trade
    created by gas quality issues. Efforts must be
    made to further harmonise gas quality
    specifications and to reduce the number of these
    as much as possible in order to facilitate
    cross-border trade.

2
GTE towards the Interoperability Tools
  • GTE committed itself to play a leading Role in
    the EASEE-gas WG more specifically related to
    TSO Matters
  • Preparatory Works have been started in order to
    be ready when EASEE-gas starts its Activities
  • Set up of a GTE Interoperability WG covering
  • OBA's
  • Harmonisation of Units
  • Business Practices (will be launched in March)
  • Beside that, a GTE Gas Specifications WG has been
    launched

3
GTE towards the Interoperability Tools
  • GTE committed itself to play a leading Role in
    the EASEE-gas WG more specifically related to
    TSO Matters
  • Preparatory Works have been started in order to
    be ready when EASEE-gas starts its Activities
  • Set up of a GTE Interoperability WG covering
  • OBA's
  • Harmonisation of Units
  • Business Practices (will be launched in March)
  • Beside that, a GTE Gas Specifications WG has been
    launched

4
OBA's sub-WG
  • Already on-going
  • Inventory of Operability Conditions at
    Interconnection Point (regarding nominations,
    matching, flow control, quantity determination,
    allocation procedures)
  • Intensification of the Negotiation of bilateral
    OBA's at each Cross Border Point

5
OBAs
OBA status Madrid III
6
OBAs
OBA status Madrid V
Operational
Ongoingdiscussions
Under consideration
7
OBA's sub-WG
  • Already on-going
  • Inventory of Operability Conditions at
    Interconnection Point (regarding nominations,
    matching, flow control, quantity determination,
    allocation procedures)
  • Intensification of the Negotiation of bilateral
    OBA's at each Cross Border Point
  • Next Steps
  • Detection of potential Problems
  • Determination of Solutions thanks to Global
    Discussion within EASEE-gas

8
GTE towards the Interoperability Tools
  • GTE committed itself to play a leading Role in
    the EASEE-gas WG more specifically related to
    TSO Matters
  • Preparatory Works have been started in order to
    be ready when EASEE-gas starts its Activities
  • Set up of a GTE Interoperability WG covering
  • OBA's
  • Harmonisation of Units
  • Business Practices (will be launched in March)
  • Beside that, a GTE Gas Specifications WG has been
    launched

9
Harmonisation of Units sub-WG
Today Situation
  • Apparently no problem for the Pressure bar
  • The main issue is to agree on a Common Reference
    Temperature to determine
  • Volume
  • on the Continent m³ at 0C
  • in UK and Ireland m³ at 15C
  • Gross Calorific Value (GCV)
  • in Northern Europe 25C
  • in UK and Ireland 15C
  • in France, Spain and Portugal 0C

10
Harmonisation of Units sub-WG
Further Consideration
  • Agreement on a common Units is a lengthy Process
  • the Feasibility
  • the Legal Aspects
  • the Practical Way to achieve a Convergence
  • the Resulting Costs
  • the Time Schedule

11
GTE towards the Interoperability Tools
  • GTE committed itself to play a leading Role in
    the EASEE-gas WG more specifically related to
    TSO Matters
  • Preparatory Works have been started in order to
    be ready when EASEE-gas starts its Activities
  • Set up of a GTE Interoperability WG covering
  • OBA's
  • Harmonisation of Units
  • Business Practices (will be launched in March)
  • Beside that, a GTE Gas Specifications WG has been
    launched

12
Gas Specifications
  • Already on-going
  • Inventory of National Legislations concerning Gas
    Specifications
  • List of Gas Quality Specifications that affect
    the Interoperability at each Cross-Border point
  • Next Steps
  • For each encountered problem
  • Identify the Reason
  • Determine the Contributors to a potential
    Solution
  • Formulate concrete Proposals with Implications

13
Gas Specifications a concrete Action
Hydrocarbon Dewpoint
  • GTE decided to actively promote the definition of
    a Common Measuring Method and Operational Rules
    on European level, starting with the first
    practical Experience between Transco, IUK
    Fluxys

14
Conclusion
  • The Goals set in last Madrid have been mainly
    achieved and Concrete Steps have been made
  • EASEE-gas will start functioning within a few
    weeks
  • Further concrete Results will be available for
    next Madrid

However
some Interoperability Matters have high
Impacts(financial or organisational)
  • can take, in those cases, some years before
    Agreement and Implementation
Write a Comment
User Comments (0)
About PowerShow.com