SLS AREA REPORT November 2004
2
SLS AREA REPORT
CONTENTS
  1. CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA
  2. SUMMARY TECHNICAL STATUS OF EACH WG BOF
  3. CROSS-AREA TECHNICAL ISSUES
  4. OTHER ISSUE AND CONCERNS
  5. PROPOSED AREA RESOLUTIONS/ACTION ITEMS

3
SLS AREA REPORT
  1. LIST OF CURRENT WGs AND BOFs WITHIN AREA
  • SLS-RFM - RF Modulation WG
  • SLS-CS Coding Synchronisation WG
  • SLS-DC Data Compression WG
  • SLS-SLP Space Link Protocols WG
  • SLS-TCC Telecommand Channel Coding WG
  • SLS-RNG Ranging WG
  • SLS-Prox-1 Build-2 WG
  • SLS-LEC - Long Erasure Codes BOF
  • SLS-LDPC - New Codes BOF

4
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-RFM WG
  • Goal align 401.0-B with WRC-03, SFCG-23 and
    SFCG-24
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • 13 revised recs 2 editorial recs generated in
    October
  • Agency review on 24 recommendations completed 1st
    Dec
  • Agreed way forward to resolve deadlock on
    recommendation 2.4.18 found. White 2.4.18 drafted
    in accordance with SFCG 14-3R6 to remain white
    until after SFCG-25 meeting in October 2005

status OK CAUTION PROBLEM
comment Good progress
5
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-RFM WG
  • Working Group Summary progress
  • small number of revised recommendations expected
    in Spring 2005, following on-going simulation
    results and joint RFM-CS WGs meeting.
  • Problems and Issues
  • Requirement to await SFCG-25 completion before
    finalizing white 2.4.18 to avoid same problems of
    current 2.4.18 ? need to delay WG termination
    date from August 2005 to end of November 2005.
  • Green Book containing Earth station
    characteristics (411.0-G-3) dated May 1997 does
    not reflect current capabilities and may mislead
    users. Updating it is a difficult and
    time-consuming job requiring a senior person with
    intimate technical knowledge of Earth station
    equipment design. NASA/JPL maintained it in the
    past.

6
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-CS Coding Synchronization WG (1)
  • Goal - Issue TM Channel Coding GB - Review
    and issue an Orange Book on NASA experience with
    Low Density Parity Check Codes ASIC
    Development.
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • Draft Book delivered by NASA/GSFC.

status OK CAUTION PROBLEM
comment Scope of the Orange Book undefined
7
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-CS Coding Synchronization WG (2)
  • Problems and Issues
  • Telemetry Channel Coding Green Book could not be
    published for reasons of formating problems (see
    D. Other Issues Concerns, Issue 1)
  • Scope of the Orange Book
  • WG mainly discussed the Orange Book as per MoMs
    held at University of Maryland.
  • WG is awaiting NASAs reply to CMC-S04-A25 to
    proceed (or not) with the Orange Book .

8
SLS AREA REPORT
  • 3. Data compression WG
  • Goal
  • Specify an image compression algorithm fulfilling
    identified space mission requirements
  • Develop a subsequent recommendation together with
    the supporting information (performances, usage,
    reference software, etc ).
  • Working Group Status Active
  • Working Group Summary Situation

status OK CAUTION PROBLEM
comment Red-1 under review, green book work in progress
9
SLS AREA REPORT
  • Data compression WG (cntd)
  • Working Group Summary progress
  • Red book issue 1 has been finalized all
    pending algorithmic details have been decided
    upon
  • Red-1 under review till dec. 1st, first RIDs
    received were disposed of at this meeting
  • Green book is being assembled editing
    leadership has been splitted among WG members
    target BB GB available at the same date (cf.
    planning)
  • Cross verification of recommendation being done
    through 4 independent SW implementations 1 HW
    implementation
  • One of these will be chosen as reference
    software, needed for
  • - compliance testing, performance evaluation.

10
SLS AREA REPORT
  • Data compression WG (cntd)
  • Problems and Issues
  • WG decides to strictly separate compression and
    data transport issues. Synchronization markers
    will not be provided by the compression rec.
    for bitstream oriented services, it will be up to
    the users to insert synchronization marker
    aligned with each compressed segment.
  • reference software should be part of the final
    recommendation, therefore it is desirable that it
    is available from the CCSDS website together with
    the BB, as an open source software with
    appropriate S/W license.

11
SLS AREA REPORT
  • Data compression WG (cntd)
  • Revised planning
  • Complete GREEN BOOK draft March, 2005
  • Complete S/W cross-verification March, 2005
  • Dispose RED BOOK-1 RIDS, Apr, 2005
  • Issue RED BOOK-2, July, 2005
  • Release reference S/W, October, 2005
  • Issue GREEN BOOK, October, 2005
  • Issue BLUE BOOK, October, 2005

12
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 4. SLS-SLP WG
  • Goal - Adapt, Adopt, and Create link layer
    Protocols for space data systems - Develop
    Link Layer Green Books for CCSDS Link Layer
    Protocols
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • Produced Pink Sheet to Space Link Identifiers
    Blue Book to add Prox-1 Port ID Values
  • Reviewing the Draft Proximity-1 Space Link
    Protocol GB.
  • Recommend that the Secretariat publish the Space
    Link Protocols GB and the Space Data Link
    Protocol GB

status OK CAUTION PROBLEM
comment Work in progress
13
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 4. SLS-SLP WG
  • Problems and Issues
  • Pink sheets for AOS Link Layer Protocol (increase
    in AOS frame sequence count) approved for release
    by CMC (Spring04) but still not published for
    agency review.
  • RED-2 Version of Encapsulation Packet Service
    approved by CESG (Spring04) but no CMC decision.

14
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-TCC Telecommand Channel Coding WG
  • Goal Development of a Telecommand Channel Coding
    Green Book.
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • First Draft Book delivered by ESA Editor for
    commenting within the WG.

status OK CAUTION PROBLEM
comment WG restarted with ESA resources NASA contribution.
15
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • RNG WG
  • Goal issue blue book on novel ranging techniques
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • Agency review on delta-DOR recommendation
    completed
  • Independent theoretical analysis and simulation
    results on most regenerative PN ranging specs
    available from two Agencies
  • Four (one) different ranging schemes identified
    as possible candidates for regeneration

status OK CAUTION PROBLEM
comment Good progress
16
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 6. RNG WG
  • Working Group Summary progress (cont.)
  • Preliminary hardware results on a subset of the
    four options available from one Agency
  • White book (Issue 1) to be issued by July 2005 is
    being written with focus on regenerative PN
    codes
  • Transparent PN codes will be addressed after WB
    issue 1 is out.
  • Problems and Issues
  • None so far.

17
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 7. Prox-1-Build-2 WG
  • Goal Update the Proximity-1 Space Link (3) books
    to be in sync with the first generation of Prox-1
    spacecraft
  • Working Group Status Active
  • Working Group Summary Situation
  • The only remaining item in this WG, is to resolve
    the following physical layer requirements 1)
    data rate offset, 2) short term data rate
    stability, 3) long term data rate stability.
  • Working Group Summary progress
  • Pink Sheets created for Prox-1 Physical Layer BB
    to cover those three requirements above.
  • Problems and Issues
  • None

status OK CAUTION PROBLEM
comment Work in progress
18
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS-LEC Long Erasure Codes (tornado codes) BOF
  • Goal Make, if conclusive, a proposal for the
    creation of a WG on application of long
    erasure-correction codes.
  • Working Group Status Active
  • Working Group Summary Situation
  • Working Group Summary progress
  • Input provided by ESA/ESOC/UniBO.
  • Problems and Issues
  • NASA/JPL did not contribute to this meeting
    (because of now solved- funding issues) but
    report readiness to collaborate for Spring 2005
    Meeting.

status OK CAUTION PROBLEM
comment ESA/UniBO work in progress NASA/JPL contribution on hold
19
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • SLS- LDPCC New Codes BOF (part 1)
  • Goal Identify Requirements for future codes and
    possibly select a family of Codes according to
    identified requirements.
  • Working Group Status Active
  • Working Group Summary Situation

status OK CAUTION PROBLEM
comment Identification agreement on requirements still slow and difficult Proposals still diverging in approach wrt to tentative requirements from Spring04
20
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 9. SLS- LDPCC New Codes BOF (part 2)
  • Working Group Summary progress
  • Valuable input on requirements provided at this
    meeting.
  • New input on possible candidate codes provided at
    this meeting.
  • Problems and Issues
  • Extremely limited interaction between meetings
    likely to delay convergence of the work.
  • Identification of requirements and evaluation
    criteria still variegated and needing
    harmonization in single document to be possibly
    approved by all members.
  • Possible debate on some requirements can be
    anticipated.
  • Codes proposed by members for standardization
    and/or reference still missing an harmonized
    approach.

21
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 9. SLS- LDPCC New Codes BOF (part 3)
  • Plan of Action Decided at SLS Plenary (1)
  • The discussion highlighted the need of
    identifying and approving requirements in
    stronger and more formal way.
  • ESA/ESOC/UniBO is leading the Editing work for a
    Requirements and Evaluation Criteria Document
    (RECD) (with weighting factor) for approval by
    Agencies. RECD will include rationale for each
    requirement.
  • 1st issue RECD shall be distributed by 10 January
    2005. It shall provide a preliminary list of
    requirements/rationale and evaluation criteria
    for at least 3 application profiles High rate
    EES TM, Deep space TM and Near Earth science TM.
  • Comments to 1st issue RECD by email by 31 January
    2005. Telecon if necessary.
  • 2nd issue RECD distributed 15 Feb
  • Comments to 2nd issue RECD 15 March any later
    comment will be discarded. (Agencies will be
    asked to sign up or deny individual items by
    e-mail revision/discussion by 15 March 2005).
  • 3rd (tentative final) issue RECD distributed 25
    March

22
SLS AREA REPORT
  1. SUMMARY TECHNICAL STATUS
  • 9. SLS- LDPCC New Codes Codes BOF (part 4)
  • Plan of Action Decided at SLS Plenary (2)
  • SLS-LDPCC Spring 2005 Meeting (11..15 April 2005)
    will be dedicated to addressing not closed
    comments to 2nd issue and finalising the RECD.
  • Approval of RECD by agencies subsequent to
    Spring05 meeting.
  • Upon approval of RECD, agencies will be invited
    to submit proposals (codes) together with
    compliance matrix to RECD.
  • Codes proposals to be discussed at Fall05 meeting

23
SLS AREA REPORT
  1. CROSS-AREA TECHNICAL ISSUES
  • Issue 1 Secure CommunicationsJoint SLS Area
    Security WG held 18 November
  • SLS Area work in the domain of security to start
    once needs are established
  • Careful security analysis is needed prior to
    adopting recommendations with high cost impact
  • Two resolutions
  • Res Need for agencies interoperability needs on
    security measures to be confirmed
  • Res Need for regular SLS Security WG meetings

24
SLS AREA REPORT
  1. OTHER ISSUES AND CONCERNS
  1. Issue 1 Secretarial Support SLS-DCEditorial
    support for producing books could be improved.
    Data Compression Red Book did not get any support
    for edition of technical material (e.g. graphics,
    equations, italicised symbols, numbering of
    paragraphs, )SLS-RFMPink sheets were not
    posted but mailed in corrupted file. Review
    closing date had to be extended.SLS-CSBTAS
    having problems with exotic formats used by
    Coding people (i.e. Latex editor, eps pictures,
    etc.). TM Channel Coding GB could not be
    published.SLS-SLPPink sheets for AOS Link Layer
    Protocol approved for agency review by CMC at
    Spring04 meeting still not published

25
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 1 SLS-RFM-R-0410-001
  • Considering that
  • The following 23 editorially revised
    recommendations were subject to Agency review
    2.1.8B, 2.2.4, 2.2.6, 2.3.3A, 2.4.6, 2.4.7,
    2.4.9, 2.4.14A, 2.4.14B, 2.4.15A. 2.4.15B,
    2.4.16, 3.1.1, 3.1.6B, 3.2.1A, 3.3.1, 3.3.2A,
    3.6.2A, 4.1.5, 4.2.1, 4.2.2, 4.2.3 and 5.1.
  • And recognizing that
  • No RIDs were received during the first review
    period
  • Review was extended until 1st Dec upon request
    from one agency
  • The SLS Area resolves that
  • Upon closure of review and disposition of Rids,
    these 23 recommendations be raised to blue status
    and inserted in 401-0
  • ACTION ITEM 1 SLS-RFM-A-0410-001
  • Upon closure of review and disposition of Rids,
    SLS AD to request CESG/CMC to approve insertion
    of the 23 above mentioned editorially revised
    recommendations in blue book 401-0 January 2005

26
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 2 SLS-RFM-R-0410-002
  • Considering that
  • Revised recommendation 2.4.10 was subject to
    Agency review
  • And recognizing that
  • One RID was received during the review period,
    discussed during the Fall 2004 meeting, and
    disposed of
  • Review was extended until 1st Dec upon request of
    one agency
  • The SLS Area resolves that
  • Upon closure of review and disposition of Rids,
    revised recommendation 2.4.10 be raised to blue
    status and inserted in 401-0
  • ACTION ITEM 2 SLS-RFM-A-0410-002
  • Upon closure of review and disposition of Rids,
    SLS AD to request CESG/CMC to approve insertion
    of revised recommendation 2.4.10 into blue book
    401-0. January 2005

27
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 3 SLS-RFM-R-0410-003
  • Considering that
  • The following 13 revised recommendations were
    agreed upon during the Fall 2004 meeting 2.1.3B,
    2.1.4B, 2.1.7B, 2.3.2, 2.3.3A, 2.3.3B, 2.3.4A,
    2.3.4B, 2.4.6, 2.4.14B, 2.4.17B, 3.1.2B, 3.3.3A.
  • And recognizing that
  • Proposed revisions are to bring such old
    recommendations in line with current CCSDS
    agencies practice
  • The SLS Area resolves that
  • these 13 recommendations be raised to pink
    status and be submitted for Agency review
  • ACTION ITEM 3 SLS-RFM-A-0410-003
  • CESG/CMC to approve initiation of Agency review
    for the above mentioned 13 revised
    recommendations Dec 2004
  • ACTION ITEM 4 SLS-RFM-A-0410-004
  • CCSDS secretariat to issue the 13 pink sheets for
    agency review 15 Jan 2005

28
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 4 SLS-RFM-R-0410-004
  • Considering that
  • Minor editorial changes to recommendations 2.4.2
    and 2.3.5 were agreed upon during the Fall 2004
    meeting.
  • And recognizing that
  • Submitting editorial changes to Agency review is
    an unnecessary waste of already constrained
    Agency resources
  • The SLS Area resolves that
  • editorially revised recommendations 2.4.2 and
    2.3.5 be raised to blue status and inserted in
    401-0
  • ACTION ITEM 5 SLS-RFM-A-0410-005
  • CESG/CMC to approve direct insertion of the 2
    above mentioned editorially revised
    recommendations in blue book 401-0 Dec 2004
  • ACTION ITEM 6 SLS-RFM-A-0410-006
  • CCSDS secretariat to insert recs 2.4.2 and 2.3.5
    into book 401-0 15 Jan 2005

29
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 5 SLS-RFM-R-0410-005
  • Considering that
  • The Green Book containing Earth station
    characteristics (411.0-G-3) dated May 1997 does
    not reflect current capabilities and may mislead
    users.
  • The document represents a resource used by many
    organizations planning new missions. In the
    past, NASA/JPL provided the book captain function
    and would consider doing so again, provided that
    the necessary funds were made available.
  • The SLS Area resolves that
  • CESG/CMC be alerted about status of 411.0-G-3
    so that necessary resources are made available
    within an organization to update it.
  • ACTION ITEM 7 SLS-RFM-A-0410-007
  • CESG/CMC to consider obtaining necessary
    resources within an appropriate organization to
    update 411.0-G. Dec 2004

30
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 6 SLS-RFM-R-0410-006
  • Considering that
  • A very difficult situation with recommendation
    2.4.18 is being solved by a white 2.4.18 written
    along the lines of SFCG recommendation 14-3R6
  • Such SFCG rec is up for final approval at SFCG-25
    (October 2005)
  • The activities of the RFM WG are due by August
    2005
  • And recognizing that
  • Present problems with current 2.4.18 are in the
    inconsistencies with SFCG which could be again
    the case with new white version
  • The SLS Area resolves that
  • the RFM WG schedule be extended until end of
    November 2005.
  • ACTION ITEM 8 SLS-RFM-A-0410-008
  • CESG/CMC to agree on RFM WG 3-months schedule
    extension.

31
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 7 SLS-DC-R-0411-001
  • Considering that
  • Reference software is essential to
  • Enable prospect missions teams to evaluate
    CCSDS algorithm performances for real mission
    data
  • Later, to enable implementation compliance with
    published recommendation
  • And recognizing that
  • Caution should be taken w.r.t. hosting on the
    CCSDS site software which are subject to IPR from
    a company
  • The AREA resolves that
  • Open source reference software be made available
    to users
  • ACTION ITEM 9 SLS-DC-A-0411-001
  • CESG to investigate hosting open-source reference
    software at CCSDS website but with license
    agreement with the software originator

32
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 8 SLS-DC-R-0411-002
  • Considering that
  • Data Compression Red Book is currently under
    review and Green Book under preparation
  • And recognizing that
  • Current charter foresees BB GB issued July 2004
  • Reference software should be made available at
    the same time as BB and GB
  • The AREA resolves that
  • Data Compression WG charter be updated to
    reflect the actual plan
  • ACTION ITEM 10 SLS-DC-A-0411-002
  • CESG to update Data Compression WG operating plan
    based on the new schedule (plans) envisioned for
    completing RED-2, GREEN BOOK, BLUE BOOK and
    reference software.

33
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 9 SLS-RNG-R-0410-001
  • Considering that
  • Revised recommendation 2.5.6B was subject to
    Agency review
  • No RIDs were received during the review period
  • Revisions to 2.5.6B stem from current and future
    delta-DOR practices by ESA and NASA
  • And recognizing that
  • No other CCSDS Agencies are currently supporting
    delta-DOR activities
  • The SLS Area resolves that
  • revised rec 2.5.6B be raised to blue status and
    inserted in 401-0.
  • ACTION ITEM 11 SLS-RNG-A-0410-001
  • CESG/CMC to approve insertion of revised
    recommendation 2.5.6B in blue book 401-0 Dec
    2004.
  • ACTION ITEM 12 SLS-RNG-A-0410-001
  • CCSDS secretariat to insert rec 2.5.6B into book
    401-0 15 Jan 2005

34
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 10 SLS-SLP-R-0411-001
  • Considering that
  • HW commands, Packets, and user defined data will
    be interchanged between inter-agency spacecraft
    in proximity
  • And recognizing that
  • There is a need for a standardized way to route
    these data types between inter-agency spacecraft
    in proximity
  • The SLS Area resolves that
  • Pink Sheets to Space Link Identifiers BB be
    provided to add Prox-1 Port ID values for
    interoperability
  • ACTION ITEM 13 SLS-SLP-A-0411-001
  • CESG/CMC to approve the release of Pink Sheets
    for agency review Dec 2004
  • ACTION ITEM 14 SLS-SLP-A-0411-002
  • CCSDS Secretariat to issue Pink Sheets for agency
    review 31 Jan 2005

35
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 11 SLS-Prox-1 Build2-R-0411-002
  • Considering that
  • Prox-1 Data Rate offset and short and long term
    rate stability requirements need to be addressed
    in the spec.
  • And recognizing that
  • Without such requirements, implementations may
    not be able to acquire at the specified Prox-1
    data rates
  • The AREA resolves that
  • Pink Sheets to Prox-1 Physical Layer BB be
    provided for Agency Review to address data rate
    offset and stability requirements.
  • ACTION ITEM 15 SLS-Prox-1 Build2-A-0411-001
  • CESG/CMC to approve the release of Pink Sheets
    for agency review Dec 2004
  • ACTION ITEM 16 SLS-Prox-1 Build2-A-0411-002
  • CCSDS Secretariat to issue Pink Sheets for agency
    review 31 Jan 2005

36
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 12 SLS-SLP-R-0411-003
  • Considering that
  • Both the Space Link Protocols GB and the Space
    Data Link Protocols GB have completed an informal
    Agency Review (been on the CCSDS web site for
    months)
  • And recognizing that
  • There are no constraints against their
    publication
  • The AREA resolves that
  • Final Green books be provided to the CCSDS
    Secretariat for inclusion onto the CCSDS Web
    Site.
  • ACTION ITEM 17 SLS-SLP-A-0411-002
  • Takahiro Yamada to provide both GBs to SLS-SLP WG
    chair by Dec. 15, 2004
  • ACTION ITEM 18 SLS-SLP-A-0411-003 CESG to
    approve the release of the 2 GBs Dec 2004
  • ACTION ITEM 19 SLS-SLP-A-0411-004 CCSDS
    Secretariat to publish the GBs 31 Jan 2005

37
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 13 SLS-R-0410-001
  • Considering that
  • Agencies are currently working on security
    measures for implementation in future space coms
    systems
  • The Security WG is developing a GB on security
    measures and prepares to produce recommendations
  • And recognizing that
  • Not all measures may need to be the object of
    interoperability
  • The SLS Area resolves that
  • interoperability needs on security measures
    (encryption, authentication, key management) be
    confirmed
  • ACTION ITEM 20 SLS-A-0410-001
  • CESG/CMC to establish a policy on whether a
    common set of security measures should be
    included in the CCSDS interoperability work Dec
    2004

38
SLS AREA REPORT
  1. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC
    APPROVAL
  • RESOLUTION 14 SLS-R-0410-002
  • Considering that
  • The Security WG is developing a GB on security
    measures and prepares to produce recommendations
  • Security measures may affect all layers of the
    stack
  • And recognizing that
  • The Security WG needs the expert support from the
    SLS Area
  • The SLS Area resolves that
  • joint SLS Area Security WG meetings be held
    on a regular basis
  • ACTION ITEM 21 SLS-A-0410-002
  • SLS AD and SE AD to agree on regular SLS
    Security meetings Nov 2004
Write a Comment
User Comments (0)
About PowerShow.com