Title: PERF TWM Cooperative Project
1PERF TWM Cooperative Project
65th PERF Quarterly Meeting
John B. Wilkinson Meredith B. Gustafsson July
21-22, 2004
2Why Water Management?Global View of Water
Availability vs. Population
Source UN World Water Development Report, 2003
3Why Water Management?Competing Water Consumers
By 2025, industrial water usage will represent 24
percent of all water abstractions.
Source UN World Water Development Report, 2003
4PERF Water Management Cooperative
- Sharing Project Objective
- - To exchange research, technology, and
experience in the area of water usage
minimization, optimization, and reuse at
operating facilities and in exploration and
production. - - Potential areas for sharing may include water
reuse solutions in practice, rejected reuse
solutions, case studies in the area of water
reuse / minimization / optimization, produced
water reclamation, wastewater recovery, or tools
used to develop these solutions. - Participation Requirements
- 2002 Revenues gt 10 Billion US dollars minimum
of 150,000 in-kind research - 2002 Revenues lt 10 Billion US dollars minimum
of 75,000 in-kind research
5PERF Water Management Cooperative
- Current Participants and Research Contributions
- Argonne National Laboratory (250k)
- - Feasibility Evaluation of Downhole Oil/Water
Separator (DOWS) Technology - ConocoPhillips (150k)
- - Handling of Filter Backwash Water in Offshore
Operations - - Solid Phase Extraction as a Sample Preparation
Technique for Analyzing Chemical Additives in
Produced Water, Refinery Waste Water, and Oil - University of North Dakota Energy and
Environmental Research Center (150k) - - Anaerobic Treatment of Dakota Gasification
Company Stripped Gas Liquor
6PERF Water Management Cooperative
- Current Participants and Research Contributions
- Unocal (75k)
- - Arsenic and Mercury Issues Associated with
Produced Water - ExxonMobil (150k)
- - Refinery Wastewater Resuse Case Studies (2)
- - Comparison of Water Balance and Optimization
Software - Total Value of Contributions 775k
7PERF Water Management Cooperative
- Status
- Contracts have been approved and executed by
current participants final details are being
wrapped up - Timeline and Next Steps
- Late Participation Date April 30, 2004
- Document release sharing anticipated 3 - 4Q04
- Review discussion anticipated 4Q04
-
8PERF Water Management Cooperative
- For Additional Information, Contact
- Meredith B. Gustafsson
- ExxonMobil Research Engineering
- 3225 Gallows Rd., Room 3A0613
- Fairfax, VA 22037
- (703) 846 - 4062
-