Status of Network Distribution Center NDC Activations - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Status of Network Distribution Center NDC Activations

Description:

... Detroit, Cincinnati, Chicago, St. Louis, St. Paul, Kansas City, San Francisco) ... outgoing / incoming Priority, First Class, Periodicals, Standard Mail ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 13
Provided by: DDP7
Category:

less

Transcript and Presenter's Notes

Title: Status of Network Distribution Center NDC Activations


1
Status of Network Distribution Center (NDC)
Activations
  • July 09, 2009

2
Agenda
  • Overview of Network Reengineering
  • Status of Phase 1 Activation
  • Accelerated Phase 2-4 Schedule
  • Customer Impacts
  • Summary

3
Overview Network Reengineering
  • Transformation of Bulk Mail Centers (BMC) to
    Network Distribution Centers (NDC)
  • Enhanced mail preparation
  • Consolidate package distribution
  • Combine BMC Surface Transfer Center (STC)
    containerization and dispatch plans
  • Leverage multiple trailer loading and dispatching
    techniques

Transformation
BMC
NDC
4
NDC Responsibilities
  • 11 - Tier 1 NDC (Springfield, Philadelphia,
    Washington, Atlanta, Detroit, Cincinnati,
    Chicago, St. Louis, St. Paul, Kansas City, San
    Francisco)
  • Distribution of local (turnaround) and
    destination Standard Mail, Periodicals, and
    Package Services
  • 6 - Tier 2 NDC (New Jersey, Greensboro,
    Jacksonville, Dallas, Seattle, Los Angeles)
  • Tier 1 responsibilities
  • Distribution of outgoing Standard Mail,
    Periodicals, and Package Services to the network
  • Including, MXD States Outgoing single piece sort
  • STC containerization dispatch operations
    outgoing / incoming Priority, First Class,
    Periodicals, Standard Mail
  • 4 - Tier 3 NDC (Pittsburgh, Memphis, Des Moines,
    Denver)
  • Tier 1 and Tier 2 responsibilities
  • Consolidation points for less than truck load
    volumes from Tier 2 sites

5
Tiers 1, 2, and 3
  • Directional dispatch for 4 NDCs (noted by )
  • Reduces backtracking
  • Improves service
  • Highlighted indicates Phase I sites
  • ASFs will be Tier 1 NDC for package processing

6
Impacts
  • Operational Impacts
  • NDCs operate like PDCs
  • Live loads and unloads at all NDCs
  • Operating plan changes required to coincide with
    STC containerization dispatch plan
  • NDC sort to ADCs, AADCs and NDCs
  • Transportation Impacts
  • Streamline network
  • Increase utilization of assets
  • Improve transit time

7
Status of NDC Phase I Activation
  • Activation began on May 18 in New Jersey,
    Philadelphia, and Springfield NDCs
  • Phase I was originally scheduled to be completed
    8/07
  • Accelerated completion date 7/17
  • Redesign is yielding anticipated benefits
  • Package Service Performance is up 20.0
  • Successful integration of STC NDC
    transportation
  • Beginning to eliminate transportation and reduce
    workhours

8
Origin Package Service Improvement from NJ NDC
9
Accelerated Phase 2 4 Schedule
  • Network fully activated by 11/14

10
Customer Impacts
  • Improved Service
  • No expansion to the number of entry points
  • No required changes to FAST or Critical Entry
    Times (CETs)
  • Minimal changes to origin induction preparation

11
Mail Preparation
  • Separation requirements
  • Local NDC service area
  • Network NDC split(s)
  • Multiple splits required for directional dispatch
    sites
  • Integration of Origin mail preparation
  • USPS Retail and BMEU separation enabled through
    the use of Retail Distribution Codes
  • Establish customer supplier agreements (CSA) to
    mirror required make-up during implementation

12
Summary
  • Objective Create a flexible distribution and
    logistics network to reduce cost and improve the
    consistency of service
  • Manage cost consolidation of outgoing
    operations (match workhours to workload)
  • Improve service reduce cycle time by
    eliminating some destinating BMC handlings and
    shared product transportation
  • Need your help origin separations to move mail
    on right network as quickly as possible
  • Change is needed to keep the network viable for
    years to come
Write a Comment
User Comments (0)
About PowerShow.com