ATMS1'1 Concept Finalization Meeting - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

ATMS1'1 Concept Finalization Meeting

Description:

Bo Qian. Henk Koornstra. Bob Blount. Michael Cleary. Lorin Swirsky. Roberto ... Transition from manual data collection and reactive operations to real-time ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 15
Provided by: To46
Category:

less

Transcript and Presenter's Notes

Title: ATMS1'1 Concept Finalization Meeting


1
ATMS1.1 Concept Finalization Meeting
  • 11/19/2009

2
Agenda
3
Introduction- Project History
4
Project Modifications
  • ATMS DG1 and DG2 to be repackaged into new LAP
    agreement between FDOT and BCTED
  • LAP agreement will be for a Design Build (D/B)
    project that will install ATMS infrastructure
    within the TSMO Network limits
  • TSMO Consultant will work with BCTED, BCT and
    FDOT to create RFP for D/B project

5
ATMS1.1 Development and Construction Schedule
6
ATMS1.1 Implementation Team
7
TSMO
  • TSMO is an organizational shift from
    transportation system outputs (ex. Lane miles
    resurfaced) to mobility outcomes (ex. Travel time
    reliability) that maximize the efficiency of the
    system.

8
TSMO
  • Optimize the use of existing infrastructure
  • Performance is known in real-time
  • Real-time network operations
  • Rapid response maintenance of signal system
    infrastructure on segments
  • Ability to make better investment choices

9
Active Operation and Management of TSMO Network
  • Freeways operated and managed by FDOT through ITS
    program
  • Arterial operations and management by Broward
    County Traffic Engineering Division
  • Operation resides in Broward TMC to facilitate
    synergy with FDOTs freeway management

10
TSMO in Broward County
  • A Broward County TSMO Task Team was formed
  • Members include Broward County Transit, Broward
    County MPO, Broward County Traffic Engineering,
    FDOT Planning, FDOT Traffic Operations, FDOT OMD
  • The Broward County TSMO Task Team have had
    regular meetings to develop and manage the TSMO
    program
  • To date, the Team has accomplished the following
  • Defined the TSMO Network and targeted user
    groups
  • Defined performance measures to be tracked
  • Defined a reporting schedule (quarterly)
  • Measured performance on the TSMO Network in July
    and October 2009

11
Broward County TSMO Initial Deployment Network
12
Broward County TSMO Data Collection
  • Quarterly Performance Measurement
  • Travel Time
  • Vehicle throughput
  • Passenger throughput
  • Incident duration
  • Number of incidents
  • System Health
  • Resources spent
  • Work zone characteristics
  • Schedule adherence
  • Air quality

13
Next Steps
  • Transition from manual data collection and
    reactive operations to real-time network
    management and operations
  • ATMS1.1 will provide the ATMS infrastructure to
    support real-time operations and management on
    Broward Countys Initial TSMO Deployment Network

14
Agenda
Write a Comment
User Comments (0)
About PowerShow.com