Title: Task 11.2: Fragmentation of post


1
Task 11.2 Fragmentation of post accelerated ISOL
beams
David Pérez Loureiro Universidad de Santiago de
Compostela, Spain
2
Production of extremely neutron-rich nucleus
  • Two step scheme fission cold fragmentation

n,p 238U ? 132Sn Be ? X
  • Milestones and expected results
  • - preparation of an experiment (month 12)
  • - data analysis of the experiment (month 28)
    delayed (Nov 06)
  • - optimal post-acceleration energy
    estimation (33 month)

3
Proposed experiment
FRS-GSI
4
Proposed experiment
FRS-GSI
  • Experiment proposal was submitted and approved
    by the
  • GSI PAC (18 shifts 136Xe-parasitic and 18
    shifts 238U )
  • Beam time expected scheduled July 2006 ? delayed
    until November

5
Completed work during the first 18 months
  • The experiment proposal was submitted and
    approved by the GSI
  • PAC (18 shifts 136Xe-parasitic and 18 shifts
    238U )
  • Detection setup plastic scintillator at S1
  • - two fast photo-multipliers Hamamatsu
    H2431-50mod delivered
  • to GSI last December
  • - these photo-multipliers were tested in a
    beam time last April
  • Detection setup tracking detectors at S2
  • - TPCs will be used. New TPCs tested in a
    beam time last April
  • Acquisition system new readout using the
    buffer memory of the
  • CAEN converters
  • - the system has been implemented and tested
    with 2 TDC 1 ADC
  • - final implementation in the FRS DAQ after
    summer
  • New on-line analysis based on Go4 implemented
    and tested

6
Planned work for the next months
  • Fix last details of the experimental setup
  • - calibration requirements for TPCs
  • - photo-multipliers at S2
  • - removable target at S2
  • Implementation and test of the new acquisition
    at the FRS
  • Final schedule of the beam time constraints
  • Detailed planning of the experiment
  • - calculation of the magnetic tunings of the
    FRS
  • - calibration planning with the 136Xe beam
  • - definition of working teams

7
Preliminary beam-time schedule at GSI
8
Modifications of initial plans
  • The beam time will be scheduled 9 months later
    than expected
  • - all milestones of these subtask will be
    delayed by 9 months