Title: FULL BUSINESS CASE. THE RELOCATION OF SHETTLESTON CAMPUS


1
14 July 2009 JOHN WHEATLEY COLLEGE EAST END
CAMPUS
2
Figure 5.7
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
  • John Wheatley College
  • East End Campus
  • A High Quality BREEAM Excellent Public Building
    with Environmental and Sustainable Features
    (6,459 sq m)
  • Built within Budget Handover 9 March 2007 and
    Operational 12 March 2007

9
Environmental and Sustainable Features
  • Rainwater Harvesting and Recycling
  • Biomass Boiler
  • Photo-Voltaic Cells
  • Solar Collectors
  • Air Sourced Heat Pumps
  • ETFE Roof
  • Higher than Required Thermal Insulation
  • Lighting Control Systems
  • Passive Ventilation

10
Delivery Team
  • Project Manager Capita Symonds Ltd
  • Cost Consultant Doig Smith
  • Architect Aherns Burton and Koralek
  • Mechanical, Electrical, Structural and Civil
    Engineers Buro Happold
  • Environmental Consultant Ironside Farrah
  • Contractor HBG (now BAM) Construction Ltd

11
Costs
  • Project Cost 15m
  • Building Contract 9.1m
  • FFE 800k
  • Building Cost 1,409 per sq m
  • Project Cost 2,183 per sq m
  • Sustainable Features - 3.11 of Project Cost
  • Structural Funds (ERDF) 2,818,47919 of Project
    Cost

12
Sunpath Diagram
Prevailing Winds
Street noise and pollution
The site is very exposed on the South and East
aspects
Site Environmental Microclimate
13
Sunpath Diagram
Prevailing Winds
The site is very exposed on the South and East
aspects
Site Environmental Microclimate
14
  • Double Glazing
  • For South Façade light transmittence of 0.6 or
    less or 1m overhang
  • Low E coating to reduce heat loss
  • Top and bottom opening lights preferable
    (minimum 125mm)
  • Trickle vent to frame
  • High performance seals

Site Environmental Microclimate Section Optimum
Single Sided Ventilation
15
600
500
Annual Energy Consumption (kWh/m2) Typical
Practice
400
300
200
100
0
Air-Conditioned Building
Naturally Ventilated Building
Annual Energy Consumption Target Setting
16
  • A biomass boiler uses waste material or
    renewable sources e.g. refuse, wood, crops etc to
    generate useful heat
  • Recommendation for a 100 kW heat-only system to
    be developed to meet the year round base load for
    the entire site
  • Woodchip fuel source from off-cuts from the
    forestry commission
  • 100kW biomass boiler 0.35GWh of carbon free
    energy per year for the John Wheatley College

Typical layout of modern biomass fired boiler
Energy and Utilities Alternative Energy Systems
17
Rainwater to Grey Water
Rainwater
Break Tank
Urinal
WC
WC
Cartridge Filter UV
Solar Powered Pump
Irrigation

Rainwater Retention Tank
Grey Water Retention Tank
Water Conservation
18
Roof mounted solar collectors
Exposed concrete soffits
Good window design
Site Environmental Microclimate Section -
materials
19
Biomass Boiler Plant
  • Biomass Boiler Unit
  • Rainwater and Grey Water Recycling
  • Solar collectors for domestic hot water
  • Rainwater and Grey Water Recycling
  • PIR control of
  • Lighting
  • Security
  • Waste recycling

Solar Energy Solar Collectors
Energy and Utilities Alternative Energy Systems
20
Carbon Trust Review
  • Carbon Trust reviewed the Colleges renewable
    energy elements and sustainable features
  • Concluded the College had an efficient mix of
    renewable energy and other sustainable features
  • Carbon Trust estimated largest saving and
    shortest payback from rainwater recycling

21
Post Occupancy Evaluation
  • Now mandatory on new build projects
  • SFC funded project with Cumbernauld, Carnegie,
    John Wheatley and Queen Margaret University
  • Functional Performance Review
  • Independent BREEAM Assessor appointed early
  • Future building occupants consulted early

22
  • Specify detail
  • Consider secondary effects of equipment
  • Develop a user guide for staff
  • Train staff in building systems
  • Record and monitor utility usage
  • Use energy saving equipment
  • Maintain the building

23
Sustainable Accounting
  • Pilot project
  • Energy Consumption
  • Water Usage
  • Materials and Product Consumption
  • Waste Generation and Disposal
  • Travel and Transport
  • Other Sustainability Initiatives

24
(No Transcript)