Nexus Study Presentation
November 6, 2002
2
Present Capital Construction Charge Fee Structure
3
2002 Nexus Study
  • Modified 1993 method and charges
  • 1993 charges based on 167M CIP, with 55.7M
    allocated to new users (growth)
  • 2002 method used revised CIP of 427M, with 148M
    allocated to growth

4
CIP Allocation
35
For New Users 148 M (2003 dollars)
For Existing Users 279 M (2003 dollars)
65
5
2002 Nexus Study (cont.)
  • Developed new method for levying charge from
    units and acres to number and size of metered
    connections
  • New method more closely relates growth in water
    demands to need for future capital projects
    (nexus)

6
Nexus Methodology
  • Convert actual number and sizes of metered
    connections into equivalent single-family
    meters for ease of comparison and projection
  • Develop forecasting model that predicts future
    demand based on projections of new housing and
    employment
  • Project annual increases in equivalent
    single-family meters for next 20 years

7
Nexus Methodology (cont.)
  • Allocate CIP projects to growth
  • Determine annual cost requirements for capital
    projects for next 20 years, based on CIP for
    growth
  • Divide annual cost requirements by annual
    increases in meters to determine base charge
  • Apply multipliers to base charge for
    larger-sized meters

8
Projected Annual Equivalent Singe-Family
Connections
9
(No Transcript)
10
Capital Construction Charge
  • Annual requirements for CCC
  • 160M (148M escalated at 1.6 per year)
  • 45M financed at 5 for 30 years, but recovered
    over 20 years 4.4M per year
  • 115M (160M - 45M) recovered over 20 years
    5.8M
  • Total annual CCC requirement 10.2M

11
Capital Construction Charge (cont.)
  • Annual average new meters
  • 4,539 equivalent single-family connections
  • Base charge for 5/8 and 3/4 meters
  • 10.2M 4,539 meters 2,235

12
Gallons per minute, obtained from AWWA standards
manual C700 and C701 (1996)
13