Title: Virtual Flag Integration Lessons Learned


1
Virtual Flag IntegrationLessons Learned
  • 04F-SIW-090

Vehicle/Weapons System Modeling Forum Wed, 22
Sep, 1030-1100
For Alan Berry DMOC/SRC Senior Engineer Phone
505-853-1440 Email alan.berry_at_kirtland.af.mil
John Hancock DMOC/SRC Senior Engineer Phone
505-842-5127 Email jhancock_at_scires.com
2
Outline
  • Introduction
  • Exercise Planning
  • Exercise Standards
  • Integration Testing
  • Exercise Control
  • Summary

3
Introduction
  • Characterization
  • Joint Warfighter Focus
  • Geographic Diversity of Sites
  • Quarterly Schedule
  • Tactical Level of Warfare
  • Large Scale Exercise

4
Geo DiversityJoint Warfighter Focus
Kirtland AFB AWACS, CRC, JSTARS, Predator, Cobra
Ball F-15C WTT, HH-60G, MC-130H/P,
MH-53J Constructive Air, Gnd, TBMs
Elmendorf AWACS

DTOC ARC A-10s
Offutt AFB RC-135VW
Schriever AFB Space
CIDS F/A-18
Pentagon CVC
Nellis AFB CAOC
Kirtland AFB DMOC 58 TRS
El Segundo B-2
Ft Bragg SOF Aviation
Ft Sill CGS
Tinker AWACS
Luke/Mesa F-16C
Ft Benning Virtual Village
Robins JSTARS
Charleston AFB C-17
Ft Bliss PATRIOT
Eglin CRC
Ft Huachuca CGS
Lackland AFB AFWC--Red IADS
Hurlburt Field AC-130U Ground Targets MC-130H
Orlando DMON
Live Training Audience Locations
5
Large Scale Event
6
Introduction
  • Obstacles
  • Short Planning time lines
  • Inconsistent Simulation Standards Compliance
  • Limited Integration Testing Time
  • Fast-paced Exercise Environment

7
Introduction
  • Lessons (General Categories)
  • Comprehensive Exercise Plan
  • Appropriate Exercise Standards
  • Detailed Integration Testing
  • Extensive Exercise Support

8
Exercise Planning
  • Technical Working Group
  • Fidelity Requirements
  • Network Design
  • LAN Configuration
  • WAN Configuration
  • Filter Plan

9
Notional Network Design
DFA
10
Exercise Standards
  • Participant Capabilities
  • Interface Standards
  • Natural Environment Standards
  • Entity Standards

11
Exercise Standards Cont.
  • Sensor Standards
  • Warfare Standards
  • Tactical Data Link Standards
  • Voice Standards

12
Integration Testing
  • Technical Briefings
  • Single Site
  • Multiple Site

13
Exercise Control
  • Exercise Management
  • Problem Resolution

14
Summary
  • VF Highlights the Need for Renewed Emphasis on
    DIS Interoperability Standards
  • Success in Distributed Mission Operations calls
    for
  • Realistic Simulation Standards
  • Presentation of a Complete Exercise Plan
  • Attention to Bit-Level Detail, where required
  • Unwavering commitment to Warfighter Needs

15
Questions
16
Back-Ups
17
PDU Counts