LaRC Office of Safety - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

LaRC Office of Safety

Description:

Basic Elements in Draft NPR 8705.X are similar to other Audits experienced by LaRC S&MA ... 'Horse before the Cart' Should consider performing the IPS before the PA&R ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 8
Provided by: odin90
Category:
Tags: larc | office | safety

less

Transcript and Presenter's Notes

Title: LaRC Office of Safety


1
LaRC Office of Safety Mission Assurance
Recent Audit/Assessment History _at_ LaRC
  • Initial Process Verification (PV) in 1999
  • 2nd or Phase II PV in 2003
  • Voluntary Protection Program (VPP) in 1999
  • Recertification Audit in 2003

2
LaRC Office of Safety Mission Assurance
  • Basic Elements in Draft NPR 8705.X are similar to
    other Audits experienced by LaRC SMA
  • Therefore, LaRC SMA can fundamentally support HQ
    OSMA led Compliance Verifications

3
LaRC Office of Safety Mission Assurance
IFO Issues/Caveats.
  • Who are the applicable ITA/TWHs for IFO
    activities?
  • Chief Engineer Institution Management to
    define BRS with OSMA?
  • CE to ensure relevant system level TWH
    define/document the applicable IFO BRS and
    associated OQE?
  • Not sure when applicable IFO BRS will be defined
    if different from current requirements
  • What requirements would be audited?
  • What would be the level of audit required be for
    a VPP certified Center?
  • Would the OSMA IFO be limited to reviewing VPP
    audit results as suggested in NPR?
  • Centers have a limited capacity to support audits
    - VPP audits are viewed as the safety audit at
    those Centers

4
LaRC Office of Safety Mission Assurance
IFO Issues/Caveats.
  • Any new methodology required for auditing
    requirements flow down would have to be assessed
    for impact
  • new as in different than the way previous
    audits were held
  • LaRC is not currently planning to implement a
    Center-led IFO SMA Audit Process
  • Current Procedures and Practices coupled with
    Business Reviews and Metrics are used to verify
    organizational compliance
  • Small staffing - re-direction of resources for
    additional auditing will cause other work to not
    be done
  • Will have to assess to determine if different or
    additional auditing is beneficial and if an IFO
    Audit approach is the best way

5
LaRC Office of Safety Mission Assurance
Programmatic Audit Review
  • Project specific SMA roles and responsibilities
    traditionally captured in either SMA Plans or SMA
    sections of a Project Plans
  • Developing Mission Assurance Process Maps and
    Matrices is new work or a new method for LaRC
  • To better support Compliance Verification Audits,
    the Mission Assurance Branch needs to develop
    the MAP maps and matrix into office procedures
    along with a more cohesive requirements flow down
    methodology

6
LaRC Office of Safety Mission Assurance
PAR Issues/Caveats
  • Should work the TWH establishing BRS requirements
    before the audits are conducted
  • Horse before the Cart
  • Should consider performing the IPS before the
    PAR
  • IPS - phase I and PAR -phase II?
  • Develop the general criteria for requiring a PAR
    ASAP, then schedule PaRs according to criteria
    and priority
  • Development of efficient office procedures to
    closely couple with the CV will take some time

7
LaRC Office of Safety Mission Assurance
SMARR
  • Participated in two SMARR Reviews to date
  • X-43A
  • CALIPSO
  • No Issues or Concerns with SMARR
  • Smooth working process
  • HQ should think about what level of participation
    a Center that provides a part of a project to
    another Center has in the SMARR?
  • Providing an earth science instrument to the
    mission lead (i.e., CERES instrument (LaRC) to
    AQUA (GSFC) mission