The Allen Telescope Array - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

The Allen Telescope Array

Description:

The Allen Telescope Array – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 37
Provided by: skatel
Category:
Tags: allen | array | olm | telescope

less

Transcript and Presenter's Notes

Title: The Allen Telescope Array


1
The Allen Telescope Array
SKA 2004 July 19, 2004
2
The Allen Telescope Array
  • RAL
  • Leo Blitz
  • Douglas Bock
  • Geoff Bower
  • Calvin Chang
  • Matt Dexter
  • Greg Engargiola
  • Ed Fields
  • Matt Fleming
  • Colby Kraybill
  • Dave McMahon
  • Doug Thornton
  • Lynn Urry
  • Jack Welch
  • Mel Wright
  • SETI Institute
  • Rob Ackermann
  • Larry DAddario
  • Mike Davis
  • Dave DeBoer
  • John Dreher
  • Gerry Harp
  • Girmay-Keleta
  • Jill Tarter

Other Ed Ackermann John Andersen Charlie
Cox Niklas Wadefalk Sandy Weinreb
3
The Allen Telescope Array
  • Introduction
  • Antenna
  • Signal Path
  • Control
  • Site
  • Status

4
The Allen Telescope Array
Introduction Antenna Signal Path Control
Site Status
  • Joint project between SETI Institute and UCB
    Radio Astronomy Lab
  • Located at Hat Creek in N. CA
  • Goal of 350 6.1-meter antennas (and beyond)
  • Funded to-date primarily by Paul G. Allen
    Foundation

5
Science Goals
Introduction Antenna Signal Path Control
Site Status
  • 3 year survey to map all Galaxies out to 300 Mpc
    and extragalactic clouds in HI
  • Frequent, fast all-sky surveys to explore
    transient phenomenon (5 days)
  • Pulsar monitoring/survey
  • Magnetic field transition regions (Zeeman)
  • Large-scale surveys at other frequencies (e.g.
    CCS, H2CO, H2CS,C4H, CH3OH, OH, CH, CH2NH,
    CH3NH2, HCOOH, HC5N, HC7N, HC9N)
  • SETI

Multiple concurrent
6
Design Goals for the ATA
Introduction Antenna Signal Path Control
Site Status
7
Hat Creek Radio Observatory
Introduction Antenna Signal Path Control
Site Status
ATA
BIMAOVRO CARMA
8
Antenna
Introduction Antenna Signal Path Control
Site Status
  • 6.1-meter offset Gregorian (2.4-meter secondary)
  • rim-supported, hydroformed dishes

9
Antenna
Introduction Antenna Signal Path Control
Site Status
10
Antenna Surface
Introduction Antenna Signal Path Control
Site Status
  • rms 0.022 (0.56mm)
  • p-p 0.118 (3mm)

11
Shipment
Introduction Antenna Signal Path Control
Site Status
12
Shipment
Introduction Antenna Signal Path Control
Site Status
13
Many Antennas
14
Signal Path
Introduction Antenna Signal Path Control
Site Status
Correlator SETI detectors ASP
Field Lab
15
Signal Path
Introduction Antenna Signal Path Control
Site Status
16
Feed
Introduction Antenna Signal Path Control
Site Status
221
17
Front-End
Introduction Antenna Signal Path Control
Site Status
18
Balun/LNA
Introduction Antenna Signal Path Control
Site Status
19
Full Spectrum
20
Control
Introduction Antenna Signal Path Control Site
Status
  • Javabased client-server JSDA (Java Simple
    Distributed Architecture)
  • TCP/IP, UDP/IP
  • Jython scripting
  • SBC at each antenna does its own housekeeping
  • Hierarchical controllers thru processor
  • Monitor less is more

21
Beam Pattern Client
Introduction Antenna Signal Path Control Site
Status
22
ATA-350 Configuration
Introduction Antenna Signal Path Control
Site Status
23
Beam
Introduction Antenna Signal Path Control
Site Status
24
ATA-32
Introduction Antenna Signal Path Control
Site Status
25
ATA-32
ATA-32
(This year)
26
Construction Site
27
Cable Vault
28
Trench/Foundation
29
Trenches
30
BIMA
31
Old New
32
Measurements
33
Silo/Holography
34
Photogrammetry
35
Number of Elements/Schedule
Introduction Antenna Signal Path Control
Site Status
36
End
http//www.seti.org http//astro.berkeley.edu/RAL
Write a Comment
User Comments (0)
About PowerShow.com