Title: The Allen Telescope Array
1The Allen Telescope Array
SKA 2004 July 19, 2004
2The Allen Telescope Array
- RAL
- Leo Blitz
- Douglas Bock
- Geoff Bower
- Calvin Chang
- Matt Dexter
- Greg Engargiola
- Ed Fields
- Matt Fleming
- Colby Kraybill
- Dave McMahon
- Doug Thornton
- Lynn Urry
- Jack Welch
- Mel Wright
- SETI Institute
- Rob Ackermann
- Larry DAddario
- Mike Davis
- Dave DeBoer
- John Dreher
- Gerry Harp
- Girmay-Keleta
- Jill Tarter
Other Ed Ackermann John Andersen Charlie
Cox Niklas Wadefalk Sandy Weinreb
3The Allen Telescope Array
- Introduction
- Antenna
- Signal Path
- Control
- Site
- Status
4The Allen Telescope Array
Introduction Antenna Signal Path Control
Site Status
- Joint project between SETI Institute and UCB
Radio Astronomy Lab - Located at Hat Creek in N. CA
- Goal of 350 6.1-meter antennas (and beyond)
- Funded to-date primarily by Paul G. Allen
Foundation
5Science Goals
Introduction Antenna Signal Path Control
Site Status
- 3 year survey to map all Galaxies out to 300 Mpc
and extragalactic clouds in HI - Frequent, fast all-sky surveys to explore
transient phenomenon (5 days) - Pulsar monitoring/survey
- Magnetic field transition regions (Zeeman)
- Large-scale surveys at other frequencies (e.g.
CCS, H2CO, H2CS,C4H, CH3OH, OH, CH, CH2NH,
CH3NH2, HCOOH, HC5N, HC7N, HC9N) - SETI
Multiple concurrent
6Design Goals for the ATA
Introduction Antenna Signal Path Control
Site Status
7Hat Creek Radio Observatory
Introduction Antenna Signal Path Control
Site Status
ATA
BIMAOVRO CARMA
8Antenna
Introduction Antenna Signal Path Control
Site Status
- 6.1-meter offset Gregorian (2.4-meter secondary)
- rim-supported, hydroformed dishes
9Antenna
Introduction Antenna Signal Path Control
Site Status
10Antenna Surface
Introduction Antenna Signal Path Control
Site Status
- rms 0.022 (0.56mm)
- p-p 0.118 (3mm)
11Shipment
Introduction Antenna Signal Path Control
Site Status
12Shipment
Introduction Antenna Signal Path Control
Site Status
13Many Antennas
14Signal Path
Introduction Antenna Signal Path Control
Site Status
Correlator SETI detectors ASP
Field Lab
15Signal Path
Introduction Antenna Signal Path Control
Site Status
16Feed
Introduction Antenna Signal Path Control
Site Status
221
17Front-End
Introduction Antenna Signal Path Control
Site Status
18Balun/LNA
Introduction Antenna Signal Path Control
Site Status
19Full Spectrum
20Control
Introduction Antenna Signal Path Control Site
Status
- Javabased client-server JSDA (Java Simple
Distributed Architecture) - TCP/IP, UDP/IP
- Jython scripting
- SBC at each antenna does its own housekeeping
- Hierarchical controllers thru processor
- Monitor less is more
21Beam Pattern Client
Introduction Antenna Signal Path Control Site
Status
22ATA-350 Configuration
Introduction Antenna Signal Path Control
Site Status
23Beam
Introduction Antenna Signal Path Control
Site Status
24ATA-32
Introduction Antenna Signal Path Control
Site Status
25ATA-32
ATA-32
(This year)
26Construction Site
27Cable Vault
28Trench/Foundation
29Trenches
30BIMA
31Old New
32Measurements
33Silo/Holography
34Photogrammetry
35Number of Elements/Schedule
Introduction Antenna Signal Path Control
Site Status
36End
http//www.seti.org http//astro.berkeley.edu/RAL