Specification EB2678
  • Quality Control Requirements for Procured
    Materials

Approved for Public Release
2
EB2678
  • Required in virtually every purchase order
    through
  • Standard Clause 60-29 or
  • EB Specifications in the applicable document
    section
  • Guaranteed quality audit topics

Approved for Public Release
3
Why Imposed on Suppliers?
  • Dept of Navy imposes requirements on Electric
    Boat in the form of material control documents
  • NAVSEA 0900-070-6010
  • NAVSEA 0948-LP-045-7010
  • Electric Boat required by Navy to pass these
    quality requirements on to suppliers through
    procurement documents
  • Compilation of requirements EB2678 defines
    level of quality expected from suppliers

Approved for Public Release
4
Document Structure - Overview
  • Base document Quality Control requirements for
    all products
  • Appendix A Additional Level 1 Material QA
    Requirements
  • Appendix B Contract Compliance Awareness of
    Malpractice Prevention
  • Appendix C Glossary
  • Appendix D Notice for Reporting Malpractice or
    Fraud Falsification
  • Electric Boat expects these topics be addressed
    in supplier procedures, internally audited, and
    flowed down to subtier suppliers if appropriate

Approved for Public Release
5
Base Document Addresses
  • Submittal of VIRs VPARs SCAR
  • VIRs electronic SPARS system submittal
    disposition
  • Interpretation, contract change, conflict,
    requirement waiver
  • Must be registered with EB for SPARS system usage
  • VPAR customer approval of special processes
  • Obtain approval prior to performance
  • SCAR response
  • Provide constructive root cause, corrective
    action, and preventive action for a nonconforming
    condition
  • Topics will be discussed further in related
    modules

Approved for Public Release
6
Base Document Addresses (contd.)
  • Documentation Objective Quality Evidence (OQE)
  • Substantiate conformance to purchase order
  • Contains numerous important details
  • Designate and document authorized signers for the
    supplier
  • Correction to documents
  • Record retention and destruction
  • VIR approval for electronic signatures

Approved for Public Release
7
Base Document Addresses (contd.)
  • Drawing Specification Control
  • Must comply with purchase order revision level
    even if obsolete, discontinued, or otherwise
    unavailable
  • Submit VIR if necessary
  • Change to Design or Service
  • Definition of design changes
  • VIR submittal requirement

Approved for Public Release
8
Base Document Addresses (contd.)
  • Material Control
  • Addresses Level N and Level 1 material
  • Subtier flowdown and controls for material
  • Identification must be maintained
  • Change of mechanical properties
  • Retest and unique reidentification
  • DFAR requirements
  • Further Level 1 requirements in Appendix A

Approved for Public Release
9
Base Document Addresses (contd.)
  • Non-conforming Material Control
  • Waiver EB only VIR submittal
  • Proprietary design Paragraph 4 test
  • Include root cause and preventive action
  • Include VIR copy with certification
  • Manufacturing Special Processes
  • Standard clause, drawing, or specification
  • VPAR approval PRIOR to performance

Approved for Public Release
10
Base Document Addresses (contd.)
  • EBSI GSI at supplier facility
  • Right of entry supplier and subtier
  • Provide assistance and MTE
  • Corrective Action System
  • Internal and external program (RC, CA, PA)
  • Audits
  • Internal and external program

Approved for Public Release
11
Appendix A for Level 1 Materials Discusses
  • General requirements for quality inspection
    systems
  • Compliance with documented inspection/quality
    system identified in SC60-5, 60-19, or 60-58
  • Flowdown of EB purchase order requirements to
    subtiers discussed further during another
    module
  • Material identification control
  • Include requirements in Flowdown to subtiers
  • Quality representative review of PO for Level
    1product
  • Receipt inspection to ensure compliance with
    detailed purchase order and specification
    requirements
  • Suggest checklist for review of test report
    contents

Approved for Public Release
12
Appendix A for Level 1 Materials Discusses
(continued)
  • Raw material storage and physical segregation
  • By alloy type, grade, condition
  • Ensure every piece of material is identified
  • Segregate nonconforming material
  • Ensure proper discipline and control within
    procedures and by personnel

Approved for Public Release
13
Appendix A for Level 1 Materials Discusses
(continued)
  • Material traceability throughout all processing,
    including all outsourcing.
  • Initiate and maintain written procedure.
  • Note requirements when
  • mechanical properties change note that this
    requirement is discussed numerous times
  • marking is removed
  • marking is lost need for procedure and
    reporting to EB
  • Maintenance of ALL records
  • Documentation trail from melt of raw materials
    through shipment of final product

Approved for Public Release
14
Appendix A for Level 1 Materials Discusses
(continued)
  • Heat treat documentation records
  • Supplier is responsible for performance by all
    subtiers including heat treaters and the required
    documentation
  • Annotated charts, re-identification, re-testing
  • See Par 8.2.b.) for certification traceability
    requirements in both directions
  • Finished product requirements
  • Supplier verify all purchase order notes,
    standard clauses, specifications, drawings have
    been satisfied
  • Ensure physical identification marking is correct
  • Ensure documentation is available and correct
  • Electric Boat Source Inspection must verify all
    purchase order requirements for Level 1 product
    and services

Approved for Public Release
15
Appendices B D Purpose
  • Need for purchase order compliance and awareness
    of malpractice prevention
  • Not intended to be punitive but rather
    informative and to help keep honest people honest
  • Suggest new hire orientation and periodic
    reminders to employees of the need to be aware
    and alert to malpractice prevention
  • EB strongly recommends this information be an
    internal program and a Flowdown to subtiers

Approved for Public Release
16
Appendix C
  • Glossary of terms related to processing of
    purchase orders for Electric Boat