Title: Alamo Regional Mobility Authority Team Texas Update February 2, 2005 Terry Brechtel, Executive Director
1Alamo Regional Mobility Authority Team Texas
UpdateFebruary 2, 2005Terry Brechtel, Executive
Director
2The Purpose of the AlamoRMA
- Significantly Accelerate Needed Transportation
Projects - Providing a Toll/Tax Lane Choice - Have a Local Entity in Place Making Mobility
Decisions for the Community - Enhance the Economic Vitality for the Region
3Staffing Consultants
- General Counsel
- Financial Advisor
- General Engineering Consultant
- Executive Director
- Office Administrator
- Director of Engineering and Operations
- Public Information Manager
- Technical Advisor
4Proposed Toll Network System
- The Toll Network System exceeds 70 miles
5Proposed US281/Loop 1604 Project
- The US281/Loop 1604 Project extends 47 miles.
6US 281 - Today
7US 281 Toll Lanes
8Loop 1604 - Today
9Loop 1604 Toll Lanes
10Loop 1604 and IH 10 Interchange
Today With toll
ramps TxDOT Proposing
11Loop 1604 and US 281 Interchange
Today With toll ramps
12Proposed US 281/Loop 1604 Toll Project
- Currently in the CDA Evaluation Process (Industry
Review) - CDA Process Delayed pending completion of a new
Environmental Document for US 281 segment - TxDOT granted a 1.0 Million loan to fund Alamo
RMA/ Consultants review participation of CDA
13Proposed IH 35, SH16, Wurzbach Parkway/US281
Toll Project
- The toll projects exceed 28 miles
- AlamoRMA granted Development Authority
- 7.5 Million grant from TxDOT to assist project
development - Work Plan submitted to TxDOT by January 31, 2006
14IH 35, SH 16, Wurzbach Parkway/US 281 Toll
Project (continued)
- Project development agreements must be formalized
- Wurzbach Pkwy/US281
- Schematic 95
- Environmental Document being restudied
- Right of Way 60
15IH 35, SH 16, Wurzbach Parkway/US 281 Toll
Project (continued)
- IH 35
- Basic Line Schematic
- SH16
- Feasibility Study
16Other Activities
- Public Outreach
- Media
- Stakeholders
- Publications
- Public Opinion Survey
17Bexar County Voter Survey
- September 12-14, 2005
- N 400 respondents
- margin of error 4.9
18CONCLUSIONS
19CONCLUSIONS
20Concluded Messages from the Public
- The new toll system will accelerate the needed
construction of additional lanes for the most
congested highways in Bexar County without
increasing the tax burden on residents. - All highways where new toll lanes will be added
will always have a choice to use non-tolled lanes
so that drivers who do not wish to pay a toll can
use non-toll lanes.
21Concluded Messages from the Public continued
- The new toll lanes will help reduce traffic
congestion, so drivers will spend less time in
traffic and have more time to do what they want. - There will be no toll booths because the new toll
lanes will use technology that electronically
scans vehicles as they enter the toll lanes so
drivers will not have to stop to pay a toll thus
saving time.
22(No Transcript)