Alamo Regional Mobility Authority Team Texas Update February 2, 2005 Terry Brechtel, Executive Director - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Alamo Regional Mobility Authority Team Texas Update February 2, 2005 Terry Brechtel, Executive Director

Description:

Alamo Regional Mobility Authority Team Texas Update February 2, 2005 Terry Brechtel, Executive Direc – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 23
Provided by: tea4
Category:

less

Transcript and Presenter's Notes

Title: Alamo Regional Mobility Authority Team Texas Update February 2, 2005 Terry Brechtel, Executive Director


1
Alamo Regional Mobility Authority Team Texas
UpdateFebruary 2, 2005Terry Brechtel, Executive
Director
2
The Purpose of the AlamoRMA
  • Significantly Accelerate Needed Transportation
    Projects - Providing a Toll/Tax Lane Choice
  • Have a Local Entity in Place Making Mobility
    Decisions for the Community
  • Enhance the Economic Vitality for the Region

3
Staffing Consultants
  • General Counsel
  • Financial Advisor
  • General Engineering Consultant
  • Executive Director
  • Office Administrator
  • Director of Engineering and Operations
  • Public Information Manager
  • Technical Advisor

4
Proposed Toll Network System

  • The Toll Network System exceeds 70 miles

5
Proposed US281/Loop 1604 Project
  • The US281/Loop 1604 Project extends 47 miles.

6
US 281 - Today
7
US 281 Toll Lanes


8
Loop 1604 - Today
9
Loop 1604 Toll Lanes


10
Loop 1604 and IH 10 Interchange


Today With toll
ramps TxDOT Proposing
11
Loop 1604 and US 281 Interchange


Today With toll ramps
12
Proposed US 281/Loop 1604 Toll Project
  • Currently in the CDA Evaluation Process (Industry
    Review)
  • CDA Process Delayed pending completion of a new
    Environmental Document for US 281 segment
  • TxDOT granted a 1.0 Million loan to fund Alamo
    RMA/ Consultants review participation of CDA

13
Proposed IH 35, SH16, Wurzbach Parkway/US281
Toll Project
  • The toll projects exceed 28 miles
  • AlamoRMA granted Development Authority
  • 7.5 Million grant from TxDOT to assist project
    development
  • Work Plan submitted to TxDOT by January 31, 2006

14
IH 35, SH 16, Wurzbach Parkway/US 281 Toll
Project (continued)
  • Project development agreements must be formalized
  • Wurzbach Pkwy/US281
  • Schematic 95
  • Environmental Document being restudied
  • Right of Way 60

15
IH 35, SH 16, Wurzbach Parkway/US 281 Toll
Project (continued)
  • IH 35
  • Basic Line Schematic
  • SH16
  • Feasibility Study

16
Other Activities
  • Public Outreach
  • Media
  • Stakeholders
  • Publications
  • Public Opinion Survey

17
Bexar County Voter Survey
  • September 12-14, 2005
  • N 400 respondents
  • margin of error 4.9

18
CONCLUSIONS
19
CONCLUSIONS
20
Concluded Messages from the Public
  • The new toll system will accelerate the needed
    construction of additional lanes for the most
    congested highways in Bexar County without
    increasing the tax burden on residents.
  • All highways where new toll lanes will be added
    will always have a choice to use non-tolled lanes
    so that drivers who do not wish to pay a toll can
    use non-toll lanes.

21
Concluded Messages from the Public continued
  • The new toll lanes will help reduce traffic
    congestion, so drivers will spend less time in
    traffic and have more time to do what they want.
  • There will be no toll booths because the new toll
    lanes will use technology that electronically
    scans vehicles as they enter the toll lanes so
    drivers will not have to stop to pay a toll thus
    saving time.

22