Title: Gloria Dei Information Meeting II


1
Gloria Dei Information Meeting II
2
Information Meeting I
  • Review
  • Meetings Early May Timeframe
  • Annual Meeting Motion
  • Introduce and Inform
  • Identify Components

3
Annual Meeting Motion
  • This congregation directs the Council to appoint
    a facility and maintenance planning task force
    to
  • Gather feelings/feedback from the congregation
  • Identify overall needs
  • Identify the costs
  • Identify the funding options
  • Prioritize the actions and set timelines
  • Present a plan for approval to the congregation
    no later than September 2005
  • Motion Passed
  • 2005 Congregation Annual Meeting Presentation

4
Components
  • The Four Components are
  • Building Expansion
  • South Parking Lot
  • Renovation and Repair
  • Potential Future Expansion
  • Future Expansion is not address in this
    presentation

5
Purpose of Meeting II
  • The purpose is to
  • Conceptualize the Components
  • Visualize the Expansion
  • Detail Costs

6
Aerial View

7
Disclaimer
  • Please Understand
  • The concepts and visuals that you will see in
    this presentation are not, in any way, final.
    They are meant to provide the vision of what
    could be done and the benefits realized by doing
    this project.

8
Component 1 Expansion
9
Expansion Component
  • Will Address
  • ADA Compliance
  • Gathering Area
  • Kitchen
  • Library
  • Lounge
  • Memorial Garden
  • Americans with Disabilities Act
  • Multipurpose Rooms
  • Nursery
  • Office Space
  • South Entrance
  • Storage
  • Traffic Pattern
  • Youth Room

10
ADA Compliance
  • Expansion Makes Compliance Possible With
  • Larger Bathrooms
  • Exterior Exit Ramp
  • Interior Ramp for Lower Levels
  • Wider Door Openings
  • Chair Lift to Choir Loft
  • Americans with Disabilities Act

11
Gathering Area
  • Gathering Area would
  • Create a centrally located gathering space
    designed for hospitality and fellowship
  • Assist with traffic flow
  • Be connected with lounge to create larger open
    area

12
Kitchen
  • Kitchen would feature
  • Additional space added to current location
  • Proper ventilation
  • New Walk-in pantry and storage

13
Library
  • Library would be
  • Expanded to provide additional floor space in
    the same location for a possible conference area
    with additional storage

14
Lounge
  • Lounge to be
  • Located adjacent to the Gathering Area
  • Adaptable
  • Individual or small group
  • Open doors to Gathering Area
  • to handle large groups
  • Enhanced with glass door panels facing Gathering
    Area

15
Multi-Purpose Rooms
  • Multi-Purpose Meeting/Education Rooms create
    space designed for growing ministries
  • Sunday School
  • Adult Education
  • LSSI Counseling
  • 12 Step and other support groups
  • Other Opportunities
  • Activities Local Groups to rent
  • Tutoring and other Outreach

16
Nursery
  • To be relocated
  • Closer to the Nave
  • Featuring
  • Attached bathroom and changing
    facility
  • Sound system to hear services

17
Office Space
  • Office Suite situated to function better and
    more efficiently
  • Administrative Staff Office
  • Senior Pastor Office
  • Associate Pastor Office
  • Parish Nurse Dedicated Location
  • Work Room
  • Conference Room
  • Storage

18
Youth Room
  • New Youth Room is provided
  • New Facility on the lower level
  • Dedicated Room
  • Storage for Youth

19
Traffic Pattern
  • Expansion includes enhancements that would
    address the congestion that is present in the
    current confined outer narthex area by
  • Front and Rear Nave Entrances
  • Large Gathering Area
  • Open Coat Rack Area

20
Storage
  • The following critical storage needs would be
    addressed
  • Fellowship Hall (Tables and Chairs)
  • Organizations (e.g., WELCA.)
  • Office
  • Kitchen
  • Sunday School
  • Youth
  • Library
  • Outdoor (Now in garage)

21

22
Lower Level View
23
Component 2 Parking Lot
24
Parking Lot Component
  • New South Parking Lot would
  • Reside on land south of the church
  • Provide parking for 70 cars
  • Alleviate weekday and evening parking shortage
    problems
  • Provide closer parking for those with difficulty
    walking
  • Be accessible friendly
  • Reduce the need to cross Grant St, for some
    members, especially those with young children

25
Memorial Garden
  • The Memorial Garden would need to move
  • Would be moved to the front of the new South
    Entrance
  • An alternate location could be along Main Street
    in front of the parking area

26

27
Component 3 Renovation/Repair
28
Renovation/Repair Component
  • The following are included here
  • Fellowship Hall and Nave
  • Organ Repair and Update
  • Sound System Replacement
  • North Window Replacement
  • Roof Leak Repairs
  • Electrical Upgrade to Code
  • Fire/Security System Upgrade to Code

29
Nave
  • Nave to receive the following
  • Improved Lighting
  • Ventilation Improvement
  • Leaks Repaired by Relocating Ducts
  • Cleaning of walls and woodwork

30
Fellowship Hall
  • The Fellowship Hall would be renovated with the
    following
  • New lowered ceiling
  • Improved lighting
  • Carpeting
  • Storage in the current Youth Area

31
Organ and Sound System
  • Organ
  • Address Maintenance Issues
  • Upgrade to digital (Requirement)
  • Add Trumpet Stop
  • Money in Memorial Fund to cover this item
  • Sound System
  • Replace 20 year old system (A must)

32
Upgrades
  • There are upgrades that are required by code,
    fire and police
  • Fire Alarm System Upgrade
  • Fire Sprinkler System
  • Security System Upgrade (including internal
    security for staff)
  • Electrical
  • Plumbing

33
Estimated Costs of the Project
34
Repairs and Upgrades
  • Repairs and Upgrades
  • Fire Alarm 42,000
  • Fire Sprinkler System 105,000
  • Security System Upgrade 26,000
  • Duct Work to Repair Leak 269,000
  • Replace North Windows 80,000
  • Electrical Upgrades 25,000
  • Lighting 28,000
  • Chair Lift 17,000
  • Total Estimated Cost 592,000

35
Organ and Sound System
  • Organ and Sound System Costs
  • Organ 63,000
  • 10,000 in Memorial Fund
  • Organ Net Cost 53,000
  • Sound System Cost 47,000
  • Total Estimated Cost 100,000

36
Parking Lot
  • Parking Lot Construction Costs
  • The cost of the parking lot including storm water
    management, set backs and landscaping
  • Total Estimated Cost 450,000

37
Expansion and Renovation Component
  • Nave
  • Nursery
  • Office Suite
  • South Entrance
  • Storage
  • Traffic Pattern
  • Youth Room
  • Total Estimated Cost 2,800,000

Including ADA Compliance Fellowship Hall
Gathering Area Kitchen Library Lounge Memoria
l Garden Multipurpose Meeting/Education
Rooms

38
Other Costs
  • Other Costs to be covered
  • Architect Fees 210,000
  • Engineering Fees 105,000
  • Permits 10,000
  • Fund Raising 65,000
  • Contingency 200,000
  • Total Other Costs 590,000

39
Project Cost Summary
  • Repairs and Upgrades 592,000
  • Organ and Sound System 100,000
  • Parking Lot 450,000
  • Expansion/Renovation 2,800,000
  • Other Costs 590,000
  • Total Estimated Cost 4,532,000

40
June 26, 2005
  • Congregational Meeting on June 26, 2005
  • It is at this meeting that the congregation will
    decide whether to move forward with this project.
  • At the same time the future direction of Gloria
    Dei will also be decided.
  • Please Plan to Attend and Vote

41
Discussion Time