Entergy Gulf States, Inc' Louisiana Proposed Transmission Reliability Projects - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Entergy Gulf States, Inc' Louisiana Proposed Transmission Reliability Projects

Description:

... Parishes are served by 2-230/138 kV autos located at Port Hudson substation. ... Splices have been used to make repairs and they are beginning to fail. ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 20
Provided by: brian568
Category:

less

Transcript and Presenter's Notes

Title: Entergy Gulf States, Inc' Louisiana Proposed Transmission Reliability Projects


1
Entergy Gulf States, Inc.(Louisiana)Proposed
TransmissionReliability Projects
  • Entergy Transmission Planning Summit
  • New Orleans, LA
  • July 10, 2003

2
2004 EGSI-LA Transmission Reliability Projects
McManus Capacitor Bank Addition
Harelson Substation 230/69kV Auto
Replacement Carryover 4-30-2004 ISD
Port Hudson 69 kV Breaker Replacement
Coly-Hammond Build 230kV line 2006 ISD .
Chlomal-Jennings Line 13 Upgrade
Willow Glen Breaker Replacement Program 5 230
kV breakers
Port Hudson-Crown Zellerbach Line upgrade
69kV Five Points-Erath Line Upgrade
Improve ASI REVISEDBuild line Conway-Panama
(2004 ISD) Carryover SEE ELI Presentation
3
230kV Harelson SubstationReplace 2nd 230/69kV
200MVA auto with a 300MVA unit
2004
  • Harelson 230/69kV substation, located in eastern
    Baton Rouge, has two 200MVA autotransformers.
    This substation, in conjunction with Coly
    substation, serves an area with one of the
    highest load growths in south Louisiana.
  • Contingency Under peak loading conditions, loss
    of one of the existing 230/69kV autotransformers
    at Harelson can potentially overload the other
    unit by 19 .
  • Recommended Solution Replace 2nd 200MVA auto
    with another 300MVA unit. The 1st auto will have
    been in-service by 12-13-2003 (T2). Substation
    space constraints prohibited the installation of
    a third auto.
  • Total Estimated Cost 4.2M 2004 Cost 700 K
  • Estimated In-service Date 4-30-2004

4
2004
230kV Harelson Substation
Harelson
Weiner
5
2004
EGSI-LA Circuit Breaker Replacement Program
  • Mandatory Safety Issue
  • Replace five 230 kV circuit breakers at Willow
    Glen Substation
  • Replace one 69kV circuit breaker at Port Hudson
  • Total Estimated Program Cost 7.3 M
  • 2004 Cost 2.8 M
  • Estimated ISD 7-30-2004

6
2004
138 kV Line 368 Port Hudson-Crown Zellerbach
The 138 kV substations in East Baton Rouge and
East Feliciana Parishes are served by 2-230/138
kV autos located at Port Hudson substation. This
industrial loop serves approximately 237 MVA.
Contingency Under peak loading conditions,
loss of the Repapco-Port Hudson line can
potentially overload Line 368 (Port Hudson-Crown
Zellerbach) by as much as 36 in 2004, that
portion of line composed of 795 AA and rated at
174 MVA. Recommended Solution Reconductor 7.5
miles of Line 368 with a conductor capable of at
least 301 MVA or 1260 A. Estimated Cost 3.81M
7
2004
138kV Line 368 Port Hudson-Crown Zellerbach
Line 368
8
Chlomal-Jennings Loop Upgrade
2004
  • The 69kV transmission system between Jennings and
    Chlomal substations will serve approximately 73MW
    of load including the radial from Lawtag
    substation in 2004. The main "trunk" of these
    systems are the contiguous segments comprising of
    Line 13 (Jennings-Compton-Elton), Line 16
    (Elton-Tupper-Serpent-Carter), and Line 11
    (Carter-Lacassine-Chlomal).
  • The other main "trunk" is comprised of Line 14
    (Jennings-Lawtag) and Line 12 (Lawtag-Welsh-Deroue
    n-Iowa-Chlomal), which span approximately 29
    miles and serve approximately 39 MW.
  • These lines are over 50 years old. Their age
    have manifested in reduced reliability and
    reduced load-serving capacity. Between 1997 and
    2001, an average of 19 outages per year occurred
    on the northern route (Lines 11,13, and 16). In
    2002, 13 outages were recorded.
  • Splices have been used to make repairs and they
    are beginning to fail. The current loading can
    potentially cause the 69kV lines to sag into the
    distribution underbuild that is located along
    most of these lines. Upgrading these lines is
    needed to avoid safety and reliability concerns.

9
Line 11/12/13/15/16 69 kV Upgrade
10
Chlomal-Jennings Loop Upgrade(continued)
  • For Existing Configuration
  • Contingency Overload/Undervoltage
  • Loss of Jennings-Compton Chlomal-Lacassine
    13
  • Depressed local area voltages (0.78 p.u. at
    Compton)
  • Loss of Jennings-Elton
    Chlomal-Lacassine loads to 99
  • Loss of Chlomal-Lacassine Jennings-Compton
    30
  • Depressed local area voltages(0.75 p.u.
    at Lacassine)
  • Elton-Tupper 5
  • Loss of Jennings-Lawtag
    Chlomal-Iowa 6
  • Depressed local area voltages (0.91 p.u. at
    Potter)
  • Possible solution Upgrade 46 miles of line
    Chlomal-Serpent and Jennings to Compton rated 33
    MVA/ 39 MVA with a conductor capable of 72 MVA
    or 602 amps. Install breaker at Lacassine.
  • Estimated cost 13M (2.5M for 2004)
  • Expected In-Service Date October 2010

11
Existing Configuration of Lines 11, 12, 13, 14
16
12
Chlomal-Jennings Loop Upgrade(continued)
  • For Modified Proposal
  • Contingency Overload/Undervoltage
  • Loss of Jennings-Lawtag Chlomal-Iowa 119
  • Loss of Carter-Lacassine Lawtag-Jennings
    32
  • Loss of Chlomal-Lacassine Lawtag-Jennings 43
  • Loss of Lawtag-Compton Tupper, Serpent,
  • Compton, Elton lt 0.9 p.u.
  • Possible solution Upgrade 25.5 miles of line
    Chlomal to Carter and Jennings to Roanoke pt
    rated 33 MVA/ 39 MVA with a conductor capable of
    93 MVA or 780 amps. Install breaker at
    Lacassine.
  • Total Estimated cost 13M (3.5M for 2004)
  • Expected In-Service Date October 2010

13
Modified Proposed Reconfiguration
14
McManus 69kV Substation Replace Cap Bank
Correct Load PF
2004
  • McManus 69kV Substation is located north of Baton
    Rouge in East Feliciana Parish near the end of a
    12 mile radial 69kV line. There will be
    approximately 70 MW of load in the area in 2004.
  • Contingency Loss of Port Hudson to Jackson 69kV
    will cause voltages less than 0.91 p.u. near the
    end of this line.
  • Recommended Solution Replace existing 18 MVAr
    capacitor bank with 1-30 MVAR capacitor bank.
  • Estimated Cost 550K

15
McManus 69kV Substation
16
69kV Line 280 (Five Points -Erath)
2004
  • The 69kV substations Five Points, Texas Erath,
    Erath, and LeBlanc in Vermillion and Iberia
    Parishes are served by two sources, Meaux and
    Moril. The load served by the four 69kV
    substations will be approximately 41 MW in 2004.
  • Contingency Under peak loading conditions, loss
    of the Moril 138/69kV autotransformer can
    potentially overload a portion of Line 280 (Five
    Points to Erath) by 13 in 2004, that portion of
    line is composed of 4/0 ACSR and rated at 39MVA.
  • Recommended Solution Reconductor 5.01 miles of
    69kV Five Points-Erath with a conductor capable
    of 72 MVA.
  • Estimated Cost 1.3M

17
69kV L280 (Five Points -Erath)
These lines (Line 280 649) do not connect.
TIGRE
18
2005 EGSI-LA Transmission Target Areas
69kV Jackson- Marydale Line Upgrade ISD 2005
Coly-Hammond Build 230kV line 2006 ISD
Winn 69 kV 18MVAR Capacitor Installation ISD 2005
69 kV Lafayette-Holiday Line Upgrade ISD 2006
69 kV Harelson-Flannery Rd Line Upgrade ISD 2006
138 kV Willow Glen-Alchem Line Upgrade ISD 2005
19
  • Questions