Design- Davis-Bacon and Other Influences. Schedule- Pre-installation and Installation. ... Deleted 3ph Buss-tie assy's and safety covers from racks. ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 8
Provided by: marioo
Category:
Tags: buss | pack | rack | system

less

Transcript and Presenter's Notes

Title: 8-Pack: Rack System


1
8-Pack Rack System
  • Summary Update Design, Costs and Schedule

2
8-Pack Rack System -
  • Design- Davis-Bacon and Other Influences.
  • Schedule- Pre-installation and Installation.
  • Costs- Update from 9/7/01 Report

3
Design- AC power configuration Covered Work
  • Davis-Bacon Recommendation-
  • Conduit routing
  • The mounting of conduit from existing electrical
    AC power outlets to electronic racks and outlets
  • Power cable installation
  • The installation of cabling to deliver the
    electrical AC power to electronic racks and
    outlets.

4
Design- Non-Covered Work
  • Davis-Bacon Recommendation-
  • Internal rack wiring
  • Cable Group installed by means of Job Order.
  • Sub-system Eng./Tech. Installed.
  • Wiring inside experimental equipment and racks.
  • Standard Practice-
  • Assemble racks and label
  • Includes mounting of Quad and Duplex boxes
    besides plugmolds.
  • Pre-install of supplied chassis prior to floor
    mount.

5
8-Pack Costs
  • AC costs immediately reduced by 11.5k
  • Deleted 3ph Buss-tie assys and safety covers
    from racks.
  • AC costs increased to cover Davis-Bacon edict.
  • AC distribution supplied from side-mount power
    panels via conduit using THHN wire.
  • Net savings of 4.3k

6
8-Pack Rack Schedule
  • Still formulative
  • Pre-assembly is dependant on when equipment
    shows-up for install. Should start NLT 3/29.
  • Rack procurement not yet made. Purchase Req. to
    D. Schultz by 11/16/01

7
8-Pack Racks-Whats needed?
  • Design-
  • I need to produce a Breaker schedule for
    individual circuits.
  • Design help w/ AC distribution from Power Panels.
  • Schedule-
  • Dates when equipment will arrive for
    installation.
  • Dates when Decking is ready for racks.
Write a Comment