Title: Boundary Subcommittee Report


1
Boundary Subcommittee Report
  • May 12, 2008

2
Boundary Subcommittee Report
  • 1. Direct administration and the committee to
    develop the advantages and disadvantages for each
    recommended high school boundary option, state
    the goal of the option, and provide that
    information to the Board.
  • 2. Following the identification of the advantages
    and disadvantages, and goals, direct
    administration and the committee to develop
    several strategies to take the question of
    secondary boundary adjustments to community and
    staff for input. Administration and committee
    will then bring that input to the Board when
    complete.

3
High School Boundaries
  • All three high schools are under capacity
  • Student populations between the three high
    schools are disproportionate
  • Excessive travel distances to school
  • Future growth will not affect the three high
    schools equally.

4
Student Enrollment
Source November submittals to State
5
Premises Behind Boundary Development
  • Boundaries should follow natural lines and
    geography. Students should attend the school
    closest to their residents
  • The three high school boundaries should reflect
    similar student numbers
  • There should be a balance of socioeconomic
    neighborhoods represented in each boundary
  • Sports and opportunities for post season play are
    important
  • Within the next 5 to10 years, community growth
    should equally affect each school
  • Open enrollment should continue

6
Criteria for High School Boundary Change
  • 1. Use high student transfer areas to adjust
    boundary areas
  • 2. Balance student populations
  • 3. Minimizes travel distance to each school
  • 4. Provide for a diverse Socioeconomic student
    population
  • 5. Plan for future community growth by
    encompassing slated growth areas as evenly as
    possible between the three high school boundaries
  • 6. Respect the current sports classifications
  • 7. 9th Grade school choice continued

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
Public Involvement Recommendation
  • Hold six meetings
  • Three faculty/staff at each school
  • Three general community at each school
  • Format of Meetings
  • Presentation of background, criteria, and
    options.
  • Gather input from community on concerns and pros
    and cons of each options.
  • Timeline September 2008

11
Building Configuration / Grade Capacity
Subcommittee Report
  • May 12, 2008

12
Building Configuration / Grade Capacity
Subcommittee Report
  • 1. Are the considerations acceptable to guide
    development of options?
  • 2. Should any other considerations be added to
    guide development of options?

13
Previous Findings
  • Building Capacity
  • Building capacity is most severely constrained at
    the elementary school level.
  • Most significant at Chubbuck, Edahow, Ellis, Gate
    City, Syringa, Tendoy.
  • Deviation from preferred learning environment
  • Range surplus of 24 students to shortage of 464
    students
  • Secondary schools have ample room given current
    configuration.
  • Franklin Middle School and Highland High School
    are closest to capacity at each level

14
Options to Alleviate Elementary School Crowding
  • Given current overcrowding at the elementary
    school level, path must be found to provide
    relief.
  • Must consider the short run alternatives.
  • Must plan for long run opportunities and
    circumstances.
  • Two Scenarios
  • Maintain a K-6 / 7-8 grade configuration
  • Reorganize district to a K5 / 68 grade
    configuration

15
Maintaining Current Grade Configuration (K6
78)
Short Term (AY 2008 - 09)
Mid Term (AY 2010 -13)
Long Term (AY 2013 )
  • Short-Term
  • Options
  • Overload at existing schools as much as possible
  • Redraw boundaries to assist schools along the
    northern rim.
  • Costs
  • Extends period of sub-optimal educational
    environment.
  • Numerous short-lived boundary changes can be very
    disruptive to families.
  • Benefits
  • Minimal explicit costs, buys time to implement
    mid to long term solution.

16
Maintaining Current Grade Configuration (K6
78)
Short Term (AY 2008 - 09)
Mid Term (AY 2010 -13)
Long Term (AY 2013 )
  • Mid-Term
  • Options
  • Add additional classrooms at Edahow Elementary.
  • Costs
  • Expenses associated with new construction.
  • Benefits
  • Adds classrooms in area where growth is
    anticipated.
  • Takes advantage of large lot size doesnt
    require purchase of land to alleviate
    overcrowding.

17
Maintaining Current Grade Configuration (K6
78)
Short Term (AY 2008 - 09)
Mid Term (AY 2010 -13)
Long Term (AY 2013 )
  • Long-Term
  • Options
  • Build new elementary school in Chubbuck
  • Close Washington Elementary as operational and
    maintenance expenses increase.
  • Costs
  • Expenses associated with constructing new
    elementary school
  • Requires significant increase in student
    population
  • Requires passing a bond
  • Benefits
  • Allows for significant growth in the student
    population
  • Costs reduced if new larger elementary school is
    brought on line as Washington Elementary is
    closed thereby shifting operational and
    staffing costs

18
Summary of Maintain Current Grade Configuration
Option (K6 78)
Short Term (AY 2008 - 09)
Mid Term (AY 2010 -13)
Long Term (AY 2013 )
Overload elementary schools and change
boundaries as needed.
Add additional classrooms to Edahow Elementary.
Build new elementary school in Chubbuck when Washi
ngton Elementary is closed.
19
Alter Grade Configuration (K5 68)
  • Where do the sixth graders go?
  • Move all sixth grade classes to existing three
    middle schools.
  • Results in approximately 2,550 students in 6th
    8th grades.
  • Building capacity analysis showed there is room
    for approximately 2,400 students in current
    middle school buildings.
  • Move all sixth grade classes to four middle
    schools.
  • Convert Alameda Center back to a middle school.
  • Build new middle school.

20
Alter Grade Configuration (K5 68)
  • Convert Alameda Center to Middle School
  • Alameda Center programs currently use 31
    classrooms
  • New Horizon 16 4 child care
  • Kinport Academy 4
  • Turning Point 2
  • Crossroads 2
  • Summit Learning Center 3
  • New Horizons, Kinport Academy, and Crossroads
    must be housed in a facility separate from the
    mainstream population.
  • There is some debate as to whether that many
    classrooms are needed.
  • Earlier analysis concluded that 24 rooms are
    needed.

21
Alter Grade Configuration (K5 68)
  • Where to place the alternative education
    programs?
  • Reopen Bonneville Elementary to house alternative
    education programs.
  • Costs Expenses of bringing school up to code,
    etc.
  • Benefits Uses existing facility.
  • Place alternative education programs in Lincoln
    Center.
  • Place alternative education programs in Tendoy
    Elementary.

22
Alter Grade Configuration (K5 68)
  • Place alternative education programs in Lincoln
    Center
  • Relocate Early Intervention Program to Tendoy
    Elementary and move the Head Start Program into
    five regional elementary schools.
  • Costs Expenses to relocate alternative education
    and EIP Head Start, requires boundary changes
    to accommodate Tendoy students, requires some
    adjustments by EIP and Head Start staff, reduces
    number of classrooms opened up by 6th grade move
  • Benefits Uses school district buildings, enables
    Head Start students to attend home school,
    requires no additional staff

23
Alter Grade Configuration (K5 68)
  • Place alternative education programs at Tendoy
    Elementary
  • Change boundaries to relocate Tendoy Elementary
    students and use alternative delivery mode for
    alternative education programs
  • Costs requires students to change schools,
    expenses to relocate alternative education
    programs
  • Benefits split session / late start may better
    serve some alternative education students, safer
    location for secondary students given increased
    commercial businesses in area

24
Alter Grade Configuration (K5 68)
  • Build new middle school
  • Costs Needed funds will require passing a bond,
    property may be difficult to acquire, additional
    staffing (and MO) costs for new school
  • Benefits Does not require moving alternative
    education programs, allows for significant growth
    at elementary and middle schools

25
Long Range Facility Planning Subcommittee Report
  • May 12, 2008

26
Long Range Facility Planning Subcommittee Report
  • 1. Direct administration and committee to
    estimate costs of new addition to Edahow, project
    inflationary factors, proposed time line and
    propose payment plan.
  • 2. Direct administration and committee to
    estimate costs of construction of new elementary
    school for 650 students, project inflationary
    factors, propose time line and propose payment
    plan.
  • 3. Direct administration and committee to
    estimate cost/square foot to renovate Bonneville
    School, project inflationary costs and propose
    payment plan.
  • 4. Target potential school sites in growth areas
    and project cost/acre.

27
The 2008 Annual School Construction Report
28
Edahow Expansion Cost Estimate
29
Edahow Elementary Addition Estimate(expand
school from 350 to 650 students)
30
Edahow Expansion Floor Plan
31
Edahow Elementary Addition
  • Proposed Time Line Payment Plan
  • Project would require a bond election for
    taxpayer approval (2/3 majority)
  • Bond may be considered in conjunction with other
    district needs
  • Construction could begin during summer of 2009
    (earliest) and continue during school year.
  • Estimated timeline to complete (10-13 months)

32
Chubbuck Elementary Property
33
Northwest Chubbuck Property (14.51 acres
owned by District)
34
New Chubbuck Elementary School
  • Proposed Time Line Payment Plan
  • Project would require a bond election for
    taxpayer approval (2/3 majority)
  • Bond may be considered in conjunction with other
    district needs or individually
  • Construction would begin in Spring and be
    completed for operation following the close of
    the next school year for start of school in the
    Fall.
  • Estimated timeline to complete (10-13 months)

35
Bonneville Elementary Facility
36
Bonneville Renovation Estimated Costs
37
Bonneville Renovation Estimated Costs
38
Bonneville Renovation Estimated Costs
39
Bonneville Renovation Estimated Costs
40
Potential/Future School Site Areas
  • Elementary site replacement for
    Washington/Bonneville neighborhoods in southeast
    area
  • Elementary and/or Middle School site(s) for
    future growth in northeast area
  • Ballard Building and property for alternative,
    professional technical, and other educational
    programs

41
A special thanks.
  • .to all members who continue to give of their
    time and effort in making a difference for our
    children and future generations.