Municipal and Environmental Infrastructure where TC is crucial - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Municipal and Environmental Infrastructure where TC is crucial

Description:

Structuring the financing of municipal infrastructure, equipment and services ... Creditworthiness Enhancement Programme ('CEP' ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 18
Provided by: vuk67
Category:

less

Transcript and Presenter's Notes

Title: Municipal and Environmental Infrastructure where TC is crucial


1
Municipal and Environmental Infrastructure
where TC is crucial
  • Doncho Barbalov, Associate Banker, MEI
  • 10th CEI Summit Economic Forum
  • Sofia, 20 November 2007

2
EBRDs role in the municipal sector
  • Structuring the financing of municipal
    infrastructure, equipment and services
  • Promote commercialisation and corporatisation of
    services
  • Development of regulatory structures
  • Promotion of appropriate private sector
    involvement
  • Environmental improvement
  • Facilitate donor grant and commercial loan
    co-financing

EBRD helps municipalities meet their
infrastructure needs
3
Water supply and wastewater treatment
Investment challenges
  • Meeting EU water and wastewater standards
  • Need to increase investments in maintenance and
    asset renewal
  • Improve water supply standards
  • Improve collection and treatment of sewage
  • Improve operational and financial performance of
    municipal water and sewerage companies

EBRD water and sewerage Projects
4
EBRD is active in waste management projects
Investment challenges
  • Meeting EU waste standards
  • Efficiency and frequency of collection of waste
  • Improve adequacy of waste disposal
  • Prevent groundwater contamination due to
    inadequate treatment of leachate
  • Need to organise waste management systems

5
EBRD is active in urban transport projects
Investment challenges
  • Key factor in promoting economic growth
  • Rehabilitation of public transport in urban areas
    and need to replace ageing and operating
    equipment
  • Improve financial performance of transport
    operators to allow access financing
  • Need to introduce public service contracts
    between transport authority and operator
  • Investment in public transport needed to counter
    the negative effects of rapid motorisation

6
EBRD is active in district heating
Investment challenges
  • Meeting environmental and public health standards
  • Need to increase investment in modernization of
    heat generation facilities, rehabilitation of
    distribution networks and installation of control
    equipment
  • Improve efficiency of energy and water usage
  • Improve heating and hot water standards for the
    consumers
  • Improve operational and financial performance of
    municipal district heating companies

7
CEI TC assistance past and present
  • Past
  • Bulgaria Water and Waste Water Project (now
    Burgas Water signed 8 June 2005) 300,000 for
    Feasibility Study and Environmental Analysis
  • Brasov Urban Transport Project Company Loan
    City Loan (signed 28 Oct 2005) 150,000 for
    Corporate Development Programme for the Company
    and Advisory Services to the City
  • Present
  • Crimea Municipal Infrastructure - 50,000 for
    IFRS Audit of the Company (Yalta Vodocanal)
  • Kiev City Transport (signed 17 Aug 2007) -
    60,000 for Financial Due Diligence and IFRS
    Audit of the Metro Company (Kiev Metropolitan)
  • Tirana Urban Transport (signed 30 June 2006) -
    Creditworthiness Enhancement Programme for the
    City
  • Rousse Water (signed 20 June 2006) -
    Creditworthiness Enhancement Programme for the
    City

8
What does TC help us achieve
  • Transition impact objectives
  • Sustainability
  • Affordability
  • Capacity development
  • Transfer of skills

9
Types of TC required
  • Pre-signing (preparation)
  • IFRS Auditing
  • Feasibility Study
  • Technical Financial Environmental Due Diligence
  • Post-signing (implementation)
  • Creditworthiness Enhancement
  • Financial and Operational Performance Improvement
  • Project Implementation Support
  • Corporate Development

10
Current TC needs in the region
11
TC support is critical (i)
  • Financial and Operational Performance Improvement
  • Programme (FOPIP)
  • Improve the Companys operational and financial
    management in order to strengthen the capacity to
    service debt while providing high quality water
    and sewerage services
  • establishment of indicators for measurable
    improvements of operational efficiency and levels
    of service
  • increased revenue collection rates
  • improved transparency and accountability to
    consumer
  • facilitation of outsourcing for improved
    financial viability and customer service

12
TC support is critical (ii)
  • Creditworthiness Enhancement Programme (CEP)
  • TC support to assist the City to improve its
    financial management and administration
  • Focus on key areas revenue management, capital
    investment, asset management, municipal services,
    management information systems
  • Support for improved regulatory oversight and
    predictable tariff regimes

13
Case Study Rousse Water Investment Project
  • EBRD financing of 8 million supported by
    Government of Bulgaria, Ministry of Regional
    Development and City of Rousse
  • Upgrade and expansion of water and wastewater
    infrastructure
  • Compliance with EU environmental directives and
    reduced pollution of river Danube
  • Public Service Contract between Company and City
    to ensure stable revenues at Company level
  • CEI TC Support (200,000) - Creditworthiness
    Enhancement Programme
  • Other TC support - Project Implementation Support
    (Denmark - 230,000) Financial and Operational
    Performance Improvement (Netherlands - 300,000)

14
Case Study Bijeljina Waste Water Supply
  • EBRD sovereign loan of 7 million to the State of
    Bosnia Herzegovina signed 17 July 2007
  • Project implemented by the public water and waste
    water management company Vodovod i Kanalizacija
    Bijeljina A.D.
  • Develop waste water collection network in the
    town of Bijeljina
  • Prevent further pollution of underground water
    reserves used - only source of potable water for
    population
  • TC support Feasibility Study (EU DISF) Project
    Management Assistance (Sweden - 437,048)
    Financial and Operational Performance Improvement
    (WB Fund (tbc) - 152,220)

15
Case Study Tirana Municipal Roads Development
Project
  • Sovereign loan of 14.6 million - 8 million
    being on-lent to the City of Tirana and 6.6
    million being implemented by the Ministry of
    Transport
  • Rehabilitation and upgrading of a section of the
    Tirana Ring Road and the Kamza interchange
  • Sustainable Transport Strategy to address
    significant deficiencies in provision of current
    urban transport services and infrastructure
  • First EBRD transaction in the Albanian municipal
    sector
  • CEI TC Support (350,000) - Creditworthiness
    Enhancement Programme
  • Other TC support - Sustainable Transport Strategy
    (Italy - 250,000)

16
Case Study Plovdiv Water Project - Bulgaria
  • Loan of EUR 11.4 million to Plovdiv Regional
    Water Company
  • Board Approved 6 November 2007
  • Rehabilitate the water supply infrastructure
  • Environmental benefits
  • TC Support Technical, Financial and
    Environmental Due Diligence (Bank funded -
    22,500) Financial and Operational Performance
    Improvement (donor tbc - 375,000)

17
Contact details
  • Doncho Barbalov
  • Associate Banker, Municipal and Environmental
    Infrastructure
  • Tel 359 2 9321 407
  • barbalod_at_ebrd.com
  • 17 Moskovska Str.
  • Sofia 1000
  • Bulgaria
Write a Comment
User Comments (0)
About PowerShow.com