1
US Army Corps of Engineers
Detroit District
Sault Ste. Marie Replacement Lock Briefing to
Great Lakes Commission May 13, 2005
Presented by Charlie Uhlarik Project Manager,
Detroit District
2
(No Transcript)
3
Soo Project Site
4
Davis
MacArthur
Poe
Sabin
1943
1968
1914
1919
Built
800
1200
1350
1350
Length
80
110
80
80
Width
31
32
23.1
23.1
Depth
5
  • 1969 Authority
  • 1976 Authority
  • Feasibility Report and Final EIS - March 1986
  • Project Authorized - WRDA 1986
  • Limited Reevaluation Report (LRR) - 1995 to
    Present

6
  • Needed to address changes since 1986
    authorization
  • Reevaluate benefits
  • Revise costs
  • Identify Non-Federal sponsor

7
  • Great Lakes Commission to be Project Sponsor
  • Lake Carriers to be Consulted in Design Efforts
  • Funding Scheme agreed upon by 8 States
  • 50 Year Payback Period, Interest Free
  • U.S. funds Canadian Share

8
  • LRR approved by Division Sep 2004
  • LRR approved by HQ Feb 2005
  • LRR approved by ASA(CW) ??

9
  • Spells out Federal/Non-Federal project
    requirements
  • Execution required prior to first construction
    contract
  • Great Lakes Commission proposed PCA changes

10
  • Reaffirm GLCs proposed changes May 2005
  • Obtain Financial Plan from GLC June 2005
  • Submit PCA to HQ June 2005
  • Obtain PCA approval October 2005
  • Execute PCA November 2005

11
  • Calendar Year 2005
  • - Approval of LRR
  • - Continue detailed design
  • - Execute Project Cooperation Agreement
  • Calendar Year 2006
  • - Receive Non-Federal cost share
  • - Advertise/award first construction contract

12
  • Revised to North Alignment (Sabin Lock)
  • Chamber Geometry Same as Poe Lock
  • Chamber Design
  • Guide Wall Location/Design
  • Cofferdam Design
  • Filling/Emptying System through Gate Sills
  • Channel Deepening/Disposal Area

13
Chamber Geometry
Poe Size Lock Length 1,200 feet Width 110
feet Depth 32 foot depth at normal
pool Lift 21.7 feet
14
  • Total Project Cost 341.7 M
  • Federal Share 260.4 M
  • Non-Federal Share 81.3 M

15
(No Transcript)
16
  • Acting Project Manager Charlie Uhlarik
  • Non-Federal Sponsor POC Dave Knight
  • User Representative James H. I. Weakley
  • Engineering Team Leader Bob Erwin
  • Soo Area Office - Stan Jacek
  • Other assets from Detroit District and Great
    Lakes and Ohio River Division

17
(No Transcript)
18
CELRE Project Manager Charlie Uhlarik (313)
226-6753 charles.a.uhlarik_at_lre02.usace.army.mil