Title: Geospatial Transition Plan Implementation Team Update
1Geospatial Transition Plan Implementation Team
Update
- presented to
- The Army Geospatial Conference
- 4 May 2005
Ms. Karen Ruppe Team Lead
This briefing is UNCLASSIFIED
2Overview
- Background of Geospatial Transition Plan
Implementation Team - GTP IT activities update
- Army Issues
- Geospatial Intelligence Project Korea (GIP-K)
- Future Combat Systems requirements
- Joint Geospatial Enterprise Service (J-GES)
- Mission-Specific Data
- TEMs
- Prototypes
- Foundation-based Operations Management Authority
(FOMA) - Summary
3Geospatial Transition Plan Implementation Team
(GTP IT)
- Established in January 2002 to facilitate GTP
implementation across the community - Honest broker between NGA and the community
- A Communications Team
- Regular meetings with community GIS Officers
- Technical exchange meetings and tiger teams to
develop Mission-Specific Data - Other documents, briefings, meetings, and
instructional material - Provide community updates on GTP implementation
4GTP IT ActivitiesArmy Issues (1 of 2)
- Geospatial Intelligence Project Korea (GIP-K)
- Provide staff support for Foundation-based
Operations (FBO) Business Case development
prove the readiness responsiveness concept - Provide staff support to plan for the
Intelligence Campaign Plan during Ulchi Focus
Lens 05 (UFL) - Identify and obtain non-NGA data for UFL 05
plan to test value-adding and conflation - Develop the NGA Warfighter Support Plan SOP
- Future Combat Systems
- NGA is assisting Army in refining geospatial
intelligence requirements for FCS - Most rigorous requirements driving NGA future
systems development
5GTP IT ActivitiesArmy Issues (2 of 2)
- Joint Geospatial Enterprise Service (J-GES)
- NGA is participating in this Army-sponsored,
JFCOM effort to develop - Standardized formats
- Architectures
- Data structures
- Common core software capabilities for the
military Services
6GTP IT Activities (cont.)Mission-Specific Data
(MSD)
- Intensified Foundation Data with greater detail
(density and resolution) or additional features
and/or attributes to meet specific mission
requirement. - High-resolution digital surface models
- High-resolution orthoimagery
- Expanded or finer-grained feature/attribute
content - The stated future warfighter requirement
- A validated Service requirement for future
systems - A critical element of Foundation-based operations
7MSD Where We Are
Non-Interoperable Legacy Products
Aero Charts
Topo Maps
Combat Charts
DNC
City Maps
TOD
NGA Profile of the Feature Attribute Coding
Catalog
The universe of NGA feature/attributes
Unified Profile for Mission-Specific Data
Agreed-upon set of interoperable feature and
attribute definitions
8MSD - What We Have Done/Are Doing
Littoral
Ground
Urban
Aero
Ocean
Mission Environments
Conflate many representations of a single feature
into one representation for that feature at each
MSD Level
MSD Level 1
MSD Level 2
Unified Profile for MSD
MSD Level 3
Derived from five disparate environment profiles
MSD Level 4
MSD Level 5
Five Levels of Resolution
9Populating Feature Content
NGA In-house
Coproducers
Value-adding by customers
Commodity Data Sources
Integrated Vector Features in compliance with MSD
Data Content Specifications based on the Unified
Profile of MSD
MSD Levels
Numbers of features
Defined by NGA Services
Ratios are notional
10MSD Status of Actions
- Unified Profile of MSD Involves the entire
community, since production and any maintenance
will be a collaborative effort - Prototypes being produced over Inchon in support
of GIP-K - MSD 12 will complete by end of May (strategic
planning) - MSD 3 complete (tactical view/TLM)
- MSD 4 TEM complete, beginning extraction
expected to complete in August - MSD 5 TEM in planning now
- Incorporates urban, intelligence, and modeling
simulation
11MSD 3 Prototype
UNCLASSIFIED
12OVERVIEW Incheon, South Korea area of interest
with CADRG display of 1250,000 scale JOG dated
2003. Approximately a 5 X 15 minute cell
outlined in red.
13ENLARGED VIEW Incheon, South Korea area of
interest with CADRG display of 1250,000 scale
JOG dated 2003. Approximately a 5 X 15 minute
cell outlined in red.
14FURTHER ENLARGED VIEW Incheon, South Korea area
of interest with CADRG display of three 150,000
scale TLMs dated 1997 2000. Overlaid on a
CADRG display of 1250,000 scale JOG dated 2003.
Approximately a 5 X 15 minute cell outlined in
red.
15AREA OF INTEREST Incheon, South Korea area of
interest with CADRG display of three 150,000
scale TLMs dated 1997 2000. Exact area of
coverage outlined in yellow 37o2916.8
37o3443.7 N latitude by 126o508.6
126o5049.2 E longitude.
16Open water oceans, lakes
17Linear area drainage features
rivers/streams, ditches
18Tree vegetation area features
19Aeronautical area features runways, taxiways,
apron/hardstands
20Built up area features
21Linear road network features
22Building point features
23Complete MSD 3 level feature data
24MSD 5 Process Ahead
- Develop core Communities of Interest (COIs)
- MS, Special Operations, Intelligence, Facilities
- Develop draft data content specification for MSD
5 through TEMs - Refine data content specification
- Build Prototype
25GTP IT in the Future
- Reorganized within Production Directorates Data
Generation Office - Effective end of May
- Working for John Liebsch, former Team Lead
- Retain independent status and mission
- Currently devoted full time to FOMA in Office of
Geospatial Intelligence Management (OGM) - Significant commitment
- Continuing communications mission with customers
- Major contributor to the Strategic Implementation
Plan
26Summary A Recap
- Director, NGA fully supports the GTP and our
coordinated efforts - NGA committed to MSD prototype production
- GTP IT to transition with FOMA
- Mission continues
27We must get MSD right to fight tomorrows
battles, enable transformation, and support the
Future Force