Title: Andrew Howard
1Progress in implementing the international
transaction log Consultations on registry
systems prior to SBSTA 22 Bonn 13-14 May 2005
Andrew Howard UNFCCC secretariat www.unfccc.int a
howard_at_unfccc.int
2Overview
- Technical design work
- Applicability of the CITL for ITL development
- Development schedule
- Initialization of registries
3Data exchange standards
- Basis for the ITL established in the standards
- Transaction types
- Checks to ensure conformity with rules
- Reconciliation to eliminate inconsistencies
- Electronic communications with registries
- Data records to be kept
- Administrative processes
- Version 1.0 of the technical specifications for
the standards
4ITL technical design
- Version 1.0 (draft 7) of the ITL technical
design specifications - Database design and structure
- Logical flows for transaction and reconciliation
processes - Detailed specifications of coding components
- Detailed methods for ITL checks
- Links to other databases for reference
information - - Compilation and accounting database
- - CDM information system
- - JI information system (track 2)
- Detailed specifications for ITL notifications
5ITL development tasks
- Review ITL technical design
- Create database
- Develop programme code and an administrator
interface - Establish hardware environment
- Testing (individual components and overall
functionality) - ITL deployment in a production environment
- Initialization of secure communications with
registries - Documentation (plans, guides, training)
- Public website
6A head start through the CITL
- EU Community Independent Transaction Log
- Performs checks on transactions under the EU
trading scheme - Modelled on Kyotos ITL
- Development based on ITL technical design
- CITL programme code provides a robust basis for
the ITL - Strong architecture for transactions, data
integrity and checks - Around half of required ITL functionality
contained in CITL code - Challenge is to safely and seamlessly adapt,
remove and add code
7Current EU communications
EU transaction log (CITL)
EU communications hub
8Future Kyoto Protocol communications
Kyoto international transaction log
Kyoto communications hub
9Adaptation of CITL code
- Create new database or modify CITL database
- Add web service communications (tCERs and lCERs,
notifications, STL communications) - Add functions to interact with STLs (routing and
processing communications, reconciliation, data
sharing) - Add transaction types (replacement, expiry date
change) - Add ITL notification functions and running totals
- Modify existing checks and add ITL-specific
checks (tCER and lCER checks, transaction-specific
checks, reconciliation checks) - Remove unneeded CITL code (account management,
EU-specific checks, EU supplementary unit and
transaction types)
10Testing the ITL
- Unit testing on individual code and database
components - Integration testing of compiled ITL code (with
registries and STLs) - - Cover all transaction, reconciliation and
notification cases - - Cover all ITL check cases
- Regression testing (after fixes made through
earlier testing) - Performance testing (for efficiency
improvements) - - In actual hardware/software environment
- - Under realistic load scenarios
11Indicative ITL development schedule
Estimatedcompletion
Review of ITL technical design
Establish development environment
Creation/modification of database Dec 2005
Programme code development and unit testing Mar 2006
Administrator interface development and unit testing Apr 2006
Establish hardware environment
Integration and regression testing (non-STL case) May 2006
Integration and regression testing (STL case) Jun 2006
Performance testing Jul 2006
ITL deployment (including prototype) Jul/Aug 2006
ITL administrator training
12Initializing registries
- Administrator training
- Receipt and review of initialization
documentation - Establishment of VPN connection
- Transaction and reconciliation tests (web
services tests) - Tests for other data submission to ITL
- Full registry tests
- Activation of production environment connection
- Concentrate initially on registries not
associated with an STL
13The special EU case
- CITL initialization
- Similar process as for registries
- Establishment of secure ITL-CITL connection
- Data migration schedule (coordinated with EU
registry migration), including standardized data
migration procedures and scripts - Migration of registry connections from the CITL
to the ITL - One migration round or several?
- Coordination through the administrators
cooperative forum
14Communications with administrators
- Communications and planning through the
cooperative forum - ITL requirements
- Planning and schedules for development, testing,
deployment, initialization (including data and
registry migration in the EU case) - Support for initialization
- Provision of ITL prototype
- VPN purchase/configuration support for registries
- Further guidance on documentation
- Initialization support being incorporated in
contractor selection