College of San Mateo Facilities Master Plan
Update
  • San Mateo County Community College District

March 14, 2006
2
Agenda
  1. Introduction
  2. Orientation
  3. Current Campus Plan
  4. Focus of Discussion

3
Definition and Process
  • A Facilities Master Plan is a document that
    describes an overall physical development concept
    through maps and narrative.
  • The Facilities Master Plan documentation reflects
    a strategy to provide the facilities that support
    your college Mission Statement. The plan is
    guided by a vision statement and defined goals.
  • Process
  • Physical and Academic review and analysis
  • Options development
  • Solution development
  • Facilities Master Plan approval

4
Orientation to Site
5
2001 Facilities Master Plan
6
Site Projects
CAMPUS WIDE PROJECTS EXTERIOR
LIGHTING UPGRADES FIRE ALARM SYSTEM
UPGRADES WATER SYSTEM UPGRADES UTILITY
INFRASTRUCTURE UPGRADES ELECTRICAL SERVICE
UPGRADES ELECTRONIC ACCESS CONTROLS
INFRASTRUCTURE PAVING REPAIR PROJECTS
ENERGY EFFICIENCY UPGRADES ATHLETIC
FACILITIES UPGRADES WAYFINDING / SIGNAGE
PROGRAMMING ADA TRANSITION PLAN
7
Completed Projects
BLDG 33 INTERIOR RENOVATIONS
and SITE IMPROVEMENTS
BLDG 36 NEW SCIENCE BUILDING/
PLANETARIUM
BLDG 18 MODERNIZATION / SEISMIC
UPGRADE
BLDG 19 SMART CLASSROOM UPGRADES ROOF
REPLACEMENT
BLDG 16 INTERIOR FACE LIFT
BLDG 35 NEW REGIONAL PUBLIC SAFETY
CENTER
BLDG 9 TENANT IMPROVEMENTS TO LOWER LEVEL FOR
KCSM BUILDING-WIDE MECHANICAL SYSTEM UPGRADES
BLDG 2 - CHORAL ROOM AV
BLDG 8 ASBESTOS ABATEMENT IN GYM
BLDGS 7, 8 ROOF REPLACEMENTS
8
Planned Projects
BLDGS 1, 5 6 CONSOLIDATION OF STUDENT
SERVICES, SEISMIC RETROFIT AND MODERNIZATION
9
Completed and Planned Projects
BLDG 33 INTERIOR RENOVATIONS
and SITE IMPROVEMENTS
BLDG 36 NEW SCIENCE BUILDING/
PLANETARIUM
BLDG 18 MODERNIZATION / SEISMIC
UPGRADE
BLDG 35 NEW REGIONAL PUBLIC SAFETY CENTER
BLDG 19 SMART CLASSROOM UPGRADES ROOF
REPLACEMENT
BLDG 16 INTERIOR FACE LIFT
BLDG 9 TENANT IMPROVEMENTS TO LOWER LEVEL FOR
KCSM BUILDING-WIDE MECHANICAL SYSTEM UPGRADES
BLDG 8 ASBESTOS ABATEMENT IN GYM
BLDGS 7, 8 ROOF REPLACEMENTS
BLDG 2 - CHORAL ROOM AV
BLDGS 1, 5 6 CONSOLIDATION OF STUDENT
SERVICES, SEISMIC RETROFIT AND MODERNIZATION
CAMPUS WIDE PROJECTS EXTERIOR
LIGHTING UPGRADES FIRE ALARM SYSTEM
UPGRADES WATER SYSTEM UPGRADES UTILITY
INFRASTRUCTURE UPGRADES ELECTRICAL SERVICE
UPGRADES ELECTRONIC ACCESS CONTROLS INFRASTR.
PAVING REPAIR PROJECTS ENERGY EFFICIENCY
UPGRADES ATHLETIC FACILITIES UPGRADES
WAYFINDING / SIGNAGE PROGRAM ADA TRANSITION PLAN
10
2001 Goals
  1. Renovate or replace existing facilities to
    support current instructional needs.
  2. Create a welcoming, identifiable entrance to
    campus.
  3. Welcome students with a new One-Stop-Shop for
    Student Services.
  4. Re-zone the campus to evenly distribute parking
    and to bring the campus together into a cohesive
    campus environment.
  5. Create new pedestrian gateways to the campus from
    all major parking areas.

11
Focus of Discussion
  • Open Dialogue

12
College of San Mateo Vision
College of San Mateo will continue its
commitment to robust programs in transfer,
occupational education, basic skills and lifelong
learning. College of San Mateo will endorse,
support and actively pursue a policy of
inclusiveness that recognizes, values and
reflects the diversity of the community we serve,
the professionals with whom we serve and the
subject matter we impart.
13
2006 Vision Focus
STUDENT LIFE (Academic Social) - Create a
supportive learning environment that maximizes
the synergy between instruction and student
support services. FACULTY STAFF - Recruit,
support and retain the best faculty, staff and
administrators. COMMUNITY (Outreach) -
Strengthen partnerships with businesses,
industry, other educational institutions and
increase non-matriculating usage of
facilities. PEDESTRIAN/VEHICULAR CIRCULATION
(Image/Parking/Safety/Access) - Solidify the
campus image, confine the traffic, enhance the
pedestrian areas, address the evening campus
experience and improve access to buildings.
CAMPUS PHYSICAL ENVIRONMENT (Facilities) -
Support institutional needs identified through
program review for updating facilities and
equipment to enhance learning environments.