Construction Site Best Management Practices - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

Construction Site Best Management Practices

Description:

Construction Site Best Management Practices and the Project Design Process BMP Strategy and Cost Estimate PID General BMP Strategy Cost Allocation PA/ED Refined BMP ... – PowerPoint PPT presentation

Number of Views:318
Avg rating:3.0/5.0
Slides: 38
Provided by: Kat550
Learn more at: https://dot.ca.gov
Category:

less

Transcript and Presenter's Notes

Title: Construction Site Best Management Practices


1

Construction Site Best Management Practices
and the Project Design Process
2
Why are you here
  • As Caltrans staff from Design (or other
    divisions) you need to know how to
  • Assess your project for implementation of
    appropriate Construction Site BMPs
  • Incorporate selected Construction Site BMPs as
    separate bid items (lump sum is not an option)
  • Develop the engineers estimate of separate
    Construction Site BMPs
  • Incorporate a Construction Site BMP strategy into
    the Storm Water Data Report
  • To complete these tasks, you also need to know
  • About the Standard Special Provisions

2
3
Agenda
Module Topic Time
0 Overview 60 Minutes
I Introduction 45 Minutes
II Soil Stabilization (SS) and Sediment Control (SC) BMPs 60 Minutes
III Tracking, Wind Erosion, and Construction Site Management BMPs 60 Minutes
IV Incorporation of Construction Site BMPs into the Design Process 90 Minutes
V Final Wrap-Up 45 Minutes
3
4
Course Administration
  • Sign-in and attendance forms
  • Breaks
  • Restrooms
  • Emergency exits
  • Classroom etiquette

4
5
Course Administration
  • Expenditure Authorization (EA) 910076
  • Special Designation G100695 2059

5
6
Introduction Your Facilitators
  • Who am I?
  • What is my background?
  • What is my storm water background?

6
7
Introduction About You
  • Who are you?
  • What is your storm water background?
  • What do you want to learn from this class?

7
8
The Pre-Test
  • Evaluates your current level of knowledge
  • Covers course topics
  • Time limit 15 minutes
  • Same test will be given at the end of the course
    to evaluate what you learned
  • Answers will be reviewed at the end of the course
  • Results will be used to evaluate the
    effectiveness of this training

8
9
Pre-Test
9
10
Module Topic
0 Overview
I Introduction
II Soil Stabilization (SS) and Sediment Control (SC) BMPs
III Tracking, Wind Erosion, and Construction Site Management BMPs
IV Incorporation of Construction Site BMPs into the Design Process
V Final Wrap-Up
Module I
Introduction
10


11
Module I Objectives
  • The student will learn about
  • The regulatory background
  • Department policy and goals
  • NPDES definitions
  • The Caltrans manuals available to designers

11
12
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Regulatory Background
Clean Water Act Enforced by USEPA
12
13
Caltrans Statewide NPDES Permit California
General Construction Permit Caltrans Storm
Water Management Plan
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Implementing the Caltrans Storm Water Quality
Program
13
14
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Caltrans StatewideNPDES Permit
  • Issued in 1999 by the State Water Resources
    Control Board (SWRCB)
  • Implements year-round program throughout state to
    control storm water and nonstorm water
    discharges from all Caltrans properties
  • Caltrans must comply with the California General
    Construction Permit
  • Appropriate best management practices (BMPs) must
    be installed

14
15
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
General Construction Permit
  • Applies to projects that disturb gt 1 acre (0.4
    ha) of soil
  • Disturbance means any construction activity that
    creates exposed soils
  • Applies to smaller areas if part of a larger
    common plan of development
  • Requires development of a storm water pollution
    prevention plan (SWPPP)
  • Enforced by the RWQCBs

15
16
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Caltrans SWMP
  • The Storm Water Management Plan (SWMP) was
    adopted in May 2003 and includes the following
  • How Caltrans is organized
  • The responsible people
  • The process to disseminate information to staff,
    contractors, and public
  • A self-audit program

16
17
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Department Policy
  • The storm water data report should describe the
    strategy for incorporating construction site BMPs
    into the contract documents.
  • Designers are required to consider the BMPs as
    separate bid line items for all projects.
  • Preferred types of BMPs may vary from district to
    district therefore, Design and Construction
    Divisions should be in concurrence with the
    strategy.

17
18
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Department Goals
  • Better projects can be achieved by
  • Helping contractors develop more accurate,
    competitive bids for all Caltrans construction
    projects
  • Reducing construction costs arising from contract
    change orders (CCOs) and claims
  • Facilitating implementation of preferred
    temporary BMPs during construction of the project

18
19
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
NPDES Definitions
  • What is a best management practice (BMP)
  • A measure implemented to protect water quality
    and reduce potential pollutants associated with
    storm water runoff
  • Any program, technology, process, siting
    criteria, operating method, or device that
    controls, prevents, removes, or reduces pollution

19
20
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Caltrans-Approved Best Management Practices (BMPs)
  • There are several Caltrans-approved BMPs
  • Design Pollution Prevention (DPP) BMPs
  • Treatment BMPs
  • Maintenance BMPs
  • Construction Site BMPs

20
21
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Design Pollution Prevention BMPs
DPP BMPs are permanent water quality controls
used to reduce pollutant discharges by preventing
erosion.
Flared End Sections
21
22
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Treatment BMPs
Treatment BMPs are water quality controls used to
remove pollutants from storm water runoff prior
to its being discharged from the Caltrans right
of way.
Gross Solid Removal Devices
22
23
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Maintenance BMPs
Maintenance BMPs are water quality controls used
to reduce pollutant discharges during highway
maintenance activities and during the operation
of the facility.
Storm Drain Stenciling
Sweeping Operations
23
24
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Construction Site BMPs
Construction Site BMPs are temporary controls
used to control pollutant discharges during
construction.
Temporary Hydraulic Mulch (Polymer Stabilized
Fiber Matrix)
24
25
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Construction Site BMP Categories
Construction Site BMPs are separated into six BMP
categories as follows
  • Soil Stabilization Practices
  • Sediment Control Practices
  • Tracking Control Practices
  • Wind Erosion Controls
  • Non-Storm Water Controls
  • Waste Management and Materials Pollution Controls

25
26
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Temporary vs. Permanent BMPs
  • Temporary
  • Implemented only for the duration of the contract
  • Will be removed
  • Permanent
  • Installed as part of the construction work
  • Will not be removed

26
27
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Active vs. Non-Active Areas
Active Areas are construction areas where soil
disturbing activities have already occurred and
continue to occur or will occur during the
ensuing 21 days.
Non-Active Areas are construction areas (formerly
active areas) that will be idle for at least 21
days.
27
28
Caltrans Storm WaterQuality Handbooks
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
  • Project Planning and Design Guide
  • Construction Site BMPs Manual
  • SWPPP and WPCP Preparation Manual

28
29
Project Planning and Design Guide (PPDG)
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
  • Provides guidance on the following
  • BMP selection and design process
  • Incorporation of BMPs into PID, PA/ED, and PSE
  • Storm water data report (SWDR)
  • BMP cost information

Recent version (revised May 2007) can be found at
http//www.dot.ca.gov/hq/oppd/stormwtr/

29
30
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
Construction Site Best Management Practices Manual
  • Provides detailed information on Construction
    Site BMPs, including the following
  • Instructions for selection and implementation of
    Construction Site BMPs
  • Working details forConstruction Site BMPs

Recent version (dated March 2003) can be found
at http//www.dot.ca.gov/hq/construc/stormwater/ma
nuals.htm

30
31
Regulatory background
Department policy and goals
NPDES definitions
Caltrans manuals
SWPPP WPCP Preparation Manual
  • Guides contractors and Caltrans staff through the
    process of preparing the following
  • Storm Water Pollution Prevention Plan (SWPPP)
  • Water Pollution Control Program (WPCP)

Recent version (dated March 2007) can be found
at http//www.dot.ca.gov/hq/construc/stormwater/ma
nuals.htm
31
32
Construction Site BMPs and the Design Process
33
Include Construction Site BMP Strategy in the
Storm Water Data Report
  • At each design phase (PID, PA/ED, PSE), include
    the following
  • Temporary BMP information
  • Quantity and cost information
  • Construction Division concurrence information

33
34
BMP Strategy and Cost Estimate
  • PID
  • General BMP Strategy
  • Cost Allocation
  • PA/ED
  • Refined BMP Strategy
  • Refined Cost estimate
  • PSE
  • Detailed BMP Strategy
  • Select Construction Site BMPs
  • Select SSPs for Line Items
  • Prepare Water Pollution Control Summary Sheets
  • Estimate BMPs for Line Items and Lump Sum

35
Module I Summary
  • These are the topics that we have just covered
  • The regulatory background
  • Department policy and goals
  • NPDES definitions
  • The Caltrans manuals available to designers

35
36
Questions
36
San Mateo 1, Culvert Replacement Project
37
Okay, I have a couple of questions
What are the benefits of identifying Construction
Site BMPs during the project design process?
What is Department policy concerning Construction
Site BMPs and the project design process?
37
Write a Comment
User Comments (0)
About PowerShow.com