Title: Stefano Carosio
1The industry Multi-annual Road Map and longer
term strategy for more energy efficient buildings
in Europe
Stefano Carosio DAppolonia S.p.A. EeB PPP AIAG
Co-ordinator
2Where is the built environment sector?
- Buildings use 40 of total EU energy
consumption - The built environment generates 1/3 of GHG in
Europe - Even new buildings are far from being all energy
efficient - Replacement rate is very small (1 to 2 per
year) - The renovation of the existing stock is a real
challenge - Many experiments are made but actual impacts are
limited - Business as usual is not an option!
3Industry mobilisation and engagement
- Within the framework of ECTP, E2BA was
established to engage into a long term
partnership with EC, aiming at - Seeking and demonstrating industry engagement
- Coordinating research interests towards Public
stakeholders - Keeping close links with international
initiatives - Liaising with national/regional initiatives
4 in the full innovation chain
Over 140 members have joined the Association.
5The industry vision and long term strategy (1/4)
6The industry vision and long term strategy (2/4)
Time horizon
Beyond 2013
2010-13
Mobilisation of the entire value and innovation
chains
7The industry vision and long term strategy (3/4)
Project Concepts/ opportunities
8The industry vision and long term strategy (4/4)
EeB PPP as first wave of a Long Term Strategy
i.e. Retrofitting and reduction of energy use
i.e. Energy neutral buildings/districts
i.e. Energy positive buildings/districts
9The roadmapping process
Analysis of ETPs/JTIs SRAs/SET Plan Roadmaps
(SETIS) over 200 contributions from E2BA
members highlighting research challenges and
opportunities
10The roadmapping process
- Actions carried out to prepare an Updated Draft
of the document - Implementation of comments/feedbacks received
during the 1st consultation - Identification of priorities by AIAG
11The roadmapping process
- Actions carried out in order to
- finalise the Roadmap document
- 2nd Public Consultation, updated Draft publicly
available for comments to the stakeholders
community on E2BA website - Participation to a high number of workshops,
events and conferences to gather inputs outside
E2BA - Implementation of comments/feedbacks received
from broader stakeholders community, including
relevant ETPs
12Overall timing
April 13th 2010
Nov 30th 2009
Sept 30th 2009
July 13th 2009
Nov 9th 2009
April 2009
1st Draft development
2nd Draft development
Finalisation of the Roadmap
2nd Public Consultation
1st Public Consultation
13Final version of the Roadmap
14Final version of the Roadmap
15Research priorities
Energy and equipment for energy use for
existing buildings
Envelope for existing buildings
Systemic approach for existing buildings
Interaction (integration) Between buildings,
grid, heat networks,
16Multiannual Roadmap
17Acknowledgements
In close cooperation with the EC interservice
Group under the coordination of the NMP Theme
18Thank you for your attention!!
stefano.carosio_at_dappolonia.it secretariat_at_e2b-ei.e
u