BING ASSEMBLY SYSTEMS GMT 900 Tier 2 PPAP Guidelines - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

BING ASSEMBLY SYSTEMS GMT 900 Tier 2 PPAP Guidelines

Description:

Logisitics . Title: BING ASSEMBLY SYSTEMS GMT 900 Tier 2 PPAP Guidelines Author: jedel Last modified by: jedelman Created Date: 3/30/2005 2:14:38 PM – PowerPoint PPT presentation

Number of Views:183
Avg rating:3.0/5.0
Slides: 33
Provided by: jed60
Category:

less

Transcript and Presenter's Notes

Title: BING ASSEMBLY SYSTEMS GMT 900 Tier 2 PPAP Guidelines


1
GuardianTier 2 PPAP Guidelines
2
  • All submissions shall follow AIAG 4TH Edition
    PPAP Submission guidelines with some exceptions.
  • Customer Specific Requirements-Dependent upon end
    customer

3
  • Table of contents
  • In AIAG format

4
(No Transcript)
5
  • Design records Guardian approved print is
    required.
  • Engineering Change Documents - Required
  • Customer Engineering Approval- Not Required
  • Design FMEA Required- AIAG Current Edition
  • Process Flow Required AIAG Current Edition
  • Process FMEA Required -AIAG Current Edition

6
  • Dimensional results-
  • A ballooned print identifying points
    inspected must be provided.
  • A CMM roadmap is acceptable for CMM checks.

7
  • All Engineering Specifications on the print
    must be provided along with the test data
    verifying acceptability to the spec.
  • Material certifications must be provided for
    ALL components including, base material,
    coatings, grease, wires, tape, etc. Certs must
    be from PPAP submitted material, current and
    dated.
  • All IMDS/MSDS information is to be included
    and submitted to IMDS site 9949.

8
  • Initial Process Study-A summary with supporting
    charts and documentation should be included
  • MSA Results Required In AIAG Current Edition
  • Qualified Laboratory Results-ISO/TS Certification
  • Control Plan-Required
  • PSW-Required-Must be filled out completely! Run
    _at_ Rate (GP-9) must have supporting documentation
    in AIAG Current Edition

9
(No Transcript)
10
  • Appearance Approval Report-Required for A
    surface parts
  • Bulk Material Requirements Where applicable -
  • Sample Product Required must be from PPAP
    submission trial runs and retained at the
    supplier location with PPAP documentation
  • Master Sample Required - Must be retained at
    Supplier
  • Checking Aids Required- IF you have any part
    specific gauges and must include gauge
    certification.
  • Record of Compliance with Customer-Specific
    Requirements -

11
  • Team Feasibility Required AIAG Current Edition

12
(No Transcript)
13
  • Must include all AIAG Current Edition A1 through
    A8 forms

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
  • All pre-production and initial job launch
    components must have GP-12 inspection. A review
    of the GP-12 inspection process may be requested.
  • A separate APQP file must be obtained prior to
    PPAP and include the following documents.

23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
GuardianTier 2 SuppliersThank You!
Write a Comment
User Comments (0)
About PowerShow.com