Title: AS 51 version 2 -Training Module - Supplier Rating
1 AS 51 version 2 -Training Module -Supplier
Rating
Issued by Jolene Kawa, Jeffrey
McMurdie Approved by Svante Mogefors, Halvar
Jonzon 30-June-2005
2Contents
- AS 51 Training Purpose and Objectives
- Abbreviations and Introduction
- Measurable Parameters (PPM, DMT, OTP)
- Service Level Parameters (S-APQP, PPAP, RESP)
- Overall Rating - Total achieved
- Overall Rating - Rating Category
- Overall Rating - Depending on No. of Relations
- Overall Rating - Example with gt1 Supplier
Relation - Overall Rating - Rating Period
- Overall Rating - Disputes from Suppliers
- AS 51 Training Summary
- References and Links
3AS 51 Training Purpose
- Purpose
- Explain AS 51
- Present changes from AS 51 version 1.0 to the new
AS 51 version 2.0 (high lighted in red) - Demonstrate how supplier rating has been
simplified. - Intended Audience
- Suppliers to Autoliv plants.
- Autoliv SQ, Purchasing and Production Control or
Logistics
4AS 51 Training Objectives
- After completing this training, you will be able
to understand ... - How Autoliv plants rate their suppliers
- How each rating parameter is calculated
- How Overall Rating is calculated for one Supplier
Relation, and for more than one Supplier Relation - How Autoliv discriminates between good and bad
supplier performances - How supplier performance affects supplier
selection for new business
5AS 51 Autoliv Supplier RatingAbbreviations -
General
- Abbreviation Explanation
- PPM Parts Per Million (number of
non-conforming parts per million produced) - DMT Demerits
- OTP On Time Parts
- M Measurable parameters (PPM, DMT, OTP)
- S-APQP Supplier - Advanced Product Quality
Planning - PPAP Production Part Approval Process
- RESP Responsiveness
- SL Service Level parameters (S-APQP, PPAP, RESP)
- NCM Non Conforming Material
6AS 51 Autoliv Supplier RatingAbbreviations -
Targets, Thresholds, Weights
- Abbreviation Explanation Value
- TPPM Target for PPMs 0 PPM
- UPPM Unacceptable Level for PPMs 200 PPM
- THOTP THreshold for On Time Parts 90 on time
- WPPM Weight for PPM 25
- WDMT Weight for Demerits 25
- WOTP Weight for On Time Parts 26
- WAPQP Weight for S-APQP 8
- WPPAP Weight for PPAP 8
- WRESP Weight for RESPonsiveness 8
- These values are defined by Autoliv Head Office
when needed.
7AS 51 Autoliv Supplier RatingIntroduction
- The Autoliv Supplier Rating is a strategic tool
to support decision-making when dealing with our
suppliers. - Suppliers with UNSATISFACTORY rating will be at
risk for obtaining new business. - Each supplier is rated by six different
parameters - 3 Measurable Parameters PPM, DMT, OTP.
- 3 Service Level Parameters S-APQP, PPAP, RESP.
- All suppliers of materials for serial production
will be rated. - All Autoliv plants use this system.
8AS 51 Autoliv Supplier RatingMeasurable
Parameters - Overview
- This rating is unchanged.
9AS 51 Autoliv Supplier RatingMeasurable
Parameters - PPM (I)
- PPM is calculated on production parts as
follows - PPM calculation does not include
- Warranties or field returns.
- Pre-production parts or engineering samples .
- If parts are returned to supplier
- Only actual defective parts are counted. If the
supplier does not provide information within 10
days about actual defective parts found, the
complete returned shipment is counted. - PPAP approved parts
10AS 51 Autoliv Supplier RatingMeasurable
Parameters - PPM (II)
- How to count parts that are difficult to
quantify - All calculations shall be based on the unit used
within the Autoliv MRP system, e.g. - Individual labels or roll of labels.
- Length of threads or number of cones.
- For the following cases, PPM rating can be
modified upon joint decision, between Autoliv and
Supplier - Where counting of defect parts is impossible or
too time consuming in comparison to the cost of
the part. - ExampleA box of 10 000 O-rings was found to be
defective. A representative sample from the box
was inspected with a result of 5 defect ? 5
will be applied 10.000 x 5 500
non-conforming parts.
11AS 51 Autoliv Supplier RatingMeasurable
Parameters - PPM (III)
- TPPM (Target PPM) has changed from 10 to 0.
- PPM score is calculated as follows
- If PPM TPPM ? score WPPM
- If PPM ? UPPM ? score 0
- If TPPM ? PPM ? UPPM ? score
12AS 51 Autoliv Supplier RatingMeasurable
Parameters - PPM (IV)
- PPM score calculation example
- Use these values
- UPPM 200
- WPPM 25
- TPPM 0
- PPM 78 (supplier PPM)
- In this case, TPPM ? PPM ? UPPM applies, and the
score is calculated as follows - score
15.25 - Round off the calculated score ? PPM score 15
13AS 51 Autoliv Supplier RatingMeasurable
Parameters - DMT (I)
- This rating was changed.
- Rating rules in AS 511.0
- Rating rules in AS 512.0
14AS 51 Autoliv Supplier RatingMeasurable
Parameters - DMT (II)
- Supplier demerits are based on the severity of
- the defective material or
- the delivery concern.
- A customer impact is a supplier defect or
delivery concern that reached or affected an
Autoliv customer. - A repeat occurrence is an incident occurring
after the supplier has implemented containment
actions. - For the reporting period, the total generated
demerits are added up.
15AS 51 Autoliv Supplier RatingMeasurable
Parameters - DMT (III)
- DMT score calculation is unchanged.
- DMT is calculated as follows
- If total demerits ? WDMT ? score 0
- If total demerits ? WDMT ? score WDMT ? Total
16AS 51 Autoliv Supplier RatingMeasurable
Parameters - DMT (IV)
- DMT score calculation example
- Use these values
- WDMT 25
- 2 minor demerits 2x1 2
- 1 critical demerit 1x10 10
- ? total demerits 2x1 1x10 12
- In this case, total demerits ? WDMT applies, and
the score is calculated as follows - score WDMT ? Total 25 ? (2x1 1x10) 25 ?
12 13 - ? DMT score 13
17AS 51 Autoliv Supplier RatingMeasurable
Parameters - OTP (I)
- OTP is calculated as follows
- Definition of delivery and delivery concern
- A delivery is defined by part number and
engineering level, quantity and specified
shipment time according to the suppliers
individual purchasing agreement (e.g. INCOTERMS,
Pull Lists). - A delivery concern is an incident monitored by a
NCM reportto the supplier and managed by
Logistics. Typical examples - Deliveries not on time
- Wrong quantity / product
- Packaging not according to specification
- AS 242 non-compliance (e.g. missing or wrong
EDI/documents) - AS 244 non-compliance (e.g. mislabeling)
- Crisis Management (e.g. capacity recovery,
alternative delivery plan)
18AS 51 Autoliv Supplier RatingMeasurable
Parameters - OTP (II)
- OTP score calculation is unchanged.
- OTP is calculated as follows
- If OTP ? THOTP ? score 0
- If THOTP ? OTP ? 100 ? score
19AS 51 Autoliv Supplier RatingMeasurable
Parameters - OTP (III)
- OTP score calculation example
- Use these values
- WOTP 26
- THOTP 90
- 30 deliveries in 1 month with 1 delivery concern
- ? OTP
? 96.66 - In this case, THOTP ? OTP ? 100 applies, and the
score is calculated as follows - score
17.3 - Round off the calculated score ? OTP score 17
20AS 51 Autoliv Supplier RatingService Level
Parameters - Overview (I)
- This rating was changed.
- Rating rules in AS 511.0
- Rating rules in AS 512.0
21AS 51 Autoliv Supplier RatingService Level
Parameters - Overview (II)
- Important Note
- Quality of Quotation (QUOT) was removed.
- Engineering Support (ENG) was replaced by
S-APQP. - Service Level Parameters only apply to external
(non-Autoliv) suppliers.
22AS 51 Autoliv Supplier RatingService Level
Parameters - S-APQP
- This rating was changed.
- Rating rules in AS 511.0, Engineering Support
(ENG) - Rating rules in AS 512.0, S-APQP
23AS 51 Autoliv Supplier RatingService Level
Parameters - PPAP (I)
- This rating was changed.It is applicable only
for 1st time submittals per engineering level.
The worst PPAP score will be taken. - Rating rules in AS 511.0
- Rating rules in AS 512.0
24AS 51 Autoliv Supplier RatingService Level
Parameters - PPAP (II)
- What is counted as an Engineering level?In AS
51 PPAP rating is applicable only for 1st time
submittals per engineering level. For 2nd or 3rd
or 4th time submittals, no new rating will be
given. - There is a new engineering level if
- A major change is made to the part according to
AS 101 - There is not a new engineering level if
- A minor change is made to the part according to
AS 101
25AS 51 Autoliv Supplier RatingService Level
Parameters - RESP
- This rating was changed.
- Rating rules in AS 511.0
- Rating rules in AS 512.0
26AS 51 Autoliv Supplier RatingService Level
Parameters - Level 0
- For all Service Level Parameters, a level 0 was
introduced. - Level 0 gives the score N/A (Not applicable).
This means that the parameter is not included in - Total score
- Total possible score (total possible score is
reduced with the weight of the not applicable
parameter(s) - Level 0 can be applied in the following cases
- The supplier is internal
- S-APQP or PPAP is not required at all for the
supplier (off the shelf parts, small quantities
or the supplier does not provide these services
at all) - S-APQP or PPAP is not required for the rating
period for the supplier
27AS 51 Autoliv Supplier RatingService Level
Parameters - Example
- SL Parameter score calculation example
- Use these values
- S-APQP level 2 ? score 4
- PPAP level 1 ? score 0
- RESP level 3 ? score 8
- In a final step, we will derive the Overall
Rating / Total achieved for all Measurable
and Service Level Parameters used in examples so
far.
28AS 51 Autoliv Supplier RatingOverall Rating -
Total achieved
- Summary of score calculation example
- The scores from the examples are shown below
- The Total Score is 57 out of 100. This means,
Total achieved is 57.
29AS 51 Autoliv Supplier RatingOverall Rating -
Rating Category
- Each supplier is given a status (Rating
Category). - The Total achieved based upon previous examples
was 57, which means this suppliers performance
falls into Rating Category UNSATISFACTORY.Sup
plier Rating Database is only used within Autoliv
30AS 51 Autoliv Supplier RatingOverall Rating -
Depending on No. of Relations
- Overall Rating One supplier relation
- Example of previous slides
- Overall Rating More than one supplier relation
- Example of future slides
-
31Example with gt1 Supplier Relation Supplier
Overview
- Supplier A delivered parts to 4 ALV plants during
the last 6 months (Sep-03 to Feb-04) AOA, ASG,
BKI, BMF. - On the next pages, the numbers below are
explained.
Note! The picture in this and the next slide is
taken from the internal Autoliv Supplier Rating
database
32Example with gt1 Supplier Relation Single Ratings
43
- AAR did not purchase any parts in the last 6
months. - AOA did not rate Supplier A in 2004, but during
the last 4 months of 2003, the 6 months score
was 84 - Supplier A ? ASG 6M rolling 92 , and Feb-04
91 - Supplier A ? BKI 6M rolling 66 , and Feb-04
66 - Supplier A ? BMF 6M rolling 60 , and Feb-04
85 - Supplier A ? Total 6M rolling 39 , and Feb-04
65
33Example with gt1 Supplier Relation Overall Rating
- Total achieved
- Total achieved is calculated as follows
- Note M means Measurable Parameters
SL means Service Level Parameters - Parameters will be rated only if they are
applicable. - Example For Autoliv internal suppliers, Service
Level Parameters are not rated. - Total possible score 100 - Total weight Service
Level Parameters - Total possible score 100 - 24 76
Total achieved score for applicable parameters
(MSL)
x100
Total achieved
Total possible score
34Example with gt1 Supplier Relation Overall Rating
- Total PPM
- Total PPM during the 6 months rolling period
- AOA PPM 0 rejects divided by 147 200
delivered parts 0 PPM - ASG PPM 1 rejects divided by 709 459
delivered parts 1 PPM - BKI PPM 0 rejects divided by 278 400
delivered parts 0 PPM - BMF PPM 998 rejects divided by 277 507
delivered parts 3596 PPM - Total PPM 999 rejects divided by 1 412 566
delivered parts 707 PPM - Note Total PPM is calculated as total rejects
from all supplier relations divided by total
deliveries from all supplier relations, times
1000 000 - Total PPM score 0 because 707 PPM gt 200 PPM
UPPM .
35Example with gt1 Supplier Relation Overall Rating
- Total DMT
- Total DMT during the 6 months rolling period
- Note A supplier relation exists for every
month where a specific supplier delivers parts to
a specific ALV plant. In this example, there are
22 months of reporting due to 22 supplier
relations. - AOA 0 demerits during 4 months of reporting
- ASG 4 demerits during 6 months of reporting
- BKI 0 demerits during 6 months of reporting
- BMF 39 demerits during 6 months of reporting
- All plants 43 demerits during 22 months of
reporting - Total DMT 43 demerits divided by 22 months
1.95 ? 2 - Total DMT score 25 - 2 23 because 2 demerits
lt 25 WDMT .
36Example with gt1 Supplier Relation Overall Rating
- Total OTP (I)
- Total OTP is calculated as a quantity-weighted-OTP
for all supplier relations. - Total OTP during the 6 months rolling period
- The next slide shows the Delivery and OTP data of
all 4 plants for this example. When you put them
in the equation above, the result will be Total
OTP 91.6
37Example with gt1 Supplier Relation Overall Rating
- Total OTP (II)
- Delivery and OTP data for the 4 plants
- Total OTP 91.6 for all 4 supplier relations.
- THOTP 90 ? OTP ? 100 applies, andTotal OTP
score 4.16 ? 4
38Example with gt1 Supplier Relation Overall Rating
- Service Level Parameters (I)
- Total SLP during the 6 months rolling period
- S-APQP, PPAP and RESP data for the 4 plants
during the 6 months rolling period
39Example with gt1 Supplier Relation Overall Rating
- Service Level Parameters (II)
- SLP level for S-APQP
-
1.95 ? 2 - SLP level for PPAP
-
2.57 ? 3 - SLP level for RESP
-
2.33 ? 2 - SLP score level 2 ? score 4, level 3 ? score
8 - Total SLP score (4 8 4) 16
40Example with gt1 Supplier Relation Overall Rating
- Summary
- Overall Rating
- Total PPM score 0
- Total DMT score 23
- Total OTP score 4
- Total SLP score 16
- Total achieved (0 23 4 16) /
(25252624) 43 / 100 43 - This means that this suppliers performance
falls into Rating Category UNSATISFACTORY.
41AS 51 Autoliv Supplier RatingOverall Rating -
Rating Period
- All Suppliers are rated monthly
- Measurable Parameters are calculated monthly.
- Service Level (SL) Parameters are evaluated
monthly. - If there is no change, the last rating will
remain visible in the database until the next
rating will take place. If there is no rating
activity during 6 months, rating will become Not
Applicable (N/A). - For external suppliers, SL Parameters will be
rated only if applicable. For internal suppliers,
SL Parameters are not rated at all. - If a supplier has not delivered any parts to
Autoliv in a specific month/period, this supplier
shall not be rated for that month/period.
42AS 51 Autoliv Supplier RatingOverall Rating -
Rating Period
- Ratings are submitted to Autoliv Supplier Rating
Database by the 10th of the next month. - Supplier Performance is published on APP (Autoliv
Partner Portal) by the 15th of the next month. - The Autoliv Supplier Rating Database will only be
open for input files between the 1st and the 10th
each month. This means that input files sent to
the database after the 10th will not be processed
until the 1st of the next month
43AS 51 Autoliv Supplier RatingOverall Rating -
Disputes from Suppliers
- The supplier is responsible for checking accuracy
of their AS 51 rating. - Suppliers that are not agreeing with their
rating(s) should issue an AS 51 Dispute form
found in the Library section on the APP. - Suppliers must respond within two weeks after the
supplier rating has been published. - The AS 51 Dispute form shall be faxed / e-mailed
to the appropriate person listed in the dispute
form contact list.
44AS 51 Autoliv Supplier RatingOverall Rating - AS
51 Dispute Form on APP
45AS 51 Training Summary (I)Main Changes
- PPM
- Target PPM was changed from 10 to Zero.
- The PPM rating can be modified upon joint
decision, between Autoliv and Supplier, where
counting of defect parts is impossible or too
time consuming compared to the cost of the part. - DMT
- Supplier Demerits are now based on 3 criteria
- Minor (1), Critical (10), Customer (25).
- Major was removed.
46AS 51 Training Summary (II)Main Changes
- OTP
- A delivery is defined by part number and
engineering level, quantity and specified
shipment time according to the suppliers
individual purchasing agreement (e.g. INCOTERMS,
Pull Lists). - A delivery concern is an incident monitored by a
NCM report to the supplier and managed by
Logistics. - Typical examples of reported incidents are
Deliveries not on time, wrong quantity / product,
packaging not according to specification, AS 242
non-compliance (e.g. missing or wrong
EDI/documents), AS 244 non-compliance (e.g.
mislabeling), Crisis Management (e.g. capacity
recovery, alternative delivery plan).
47AS 51 Training Summary (III)Main Changes
- Service Level Parameters (SLP)
- The number of SLP changed from 4 to 3, QUOT was
removed. - The Service Level Weights changed from 6 to 8.
- Engineering Support (ENG) was replaced by S-APQP.
- The number of SLP criteria was reduced from 5 to
3, a Level 0 was added giving a score N/A. - PPAP rating is applicable only for 1st time
submittals per engineering level. - Suppliers with multiple PPAP submittals in one
month will get the lowest score of these
submittals.
48AS 51 Training Summary (IV)Main Changes
- Miscellaneous
- Ratings are compiled and submitted to APP by the
10th of the next month. - The Service Level Parameters are now evaluated
and updated monthly instead of half-yearly. - The AS 51 Supplier Overview Report now shows a
table at the bottom with the detailed data
leading into the summary scores which are shown
in the graphs. - A Supplier Dispute Procedure was introduced.
49References and Links
AS 51 Autoliv Inc. Standard Supplier Rating AS
101 Autoliv Inc. Standard Part number AS
242 Autoliv Inc. Standard EDI Messages AS
244 Autoliv Inc. Standard Package Transport
Label ASM Autoliv Supplier Manual (see
http//www.autoliv.biz) APP Autoliv Partner
Portal (see http//www.autoliv.biz)