Sponsored Projects Post Award Administration - PowerPoint PPT Presentation

About This Presentation
Title:

Sponsored Projects Post Award Administration

Description:

... (NIH) payments are via electronic drawdown Certain Department of Army awards payments are made quarterly DOE Integrated Contractors (other DOE Labs) ... – PowerPoint PPT presentation

Number of Views:214
Avg rating:3.0/5.0
Slides: 75
Provided by: PMG5
Learn more at: https://www2.lbl.gov
Category:

less

Transcript and Presenter's Notes

Title: Sponsored Projects Post Award Administration


1
Sponsored Projects Post Award Administration
  • ASD Academy Presentation
  • May 17, 2004

2
Setting the Stage
  • For I am mindful that scientific achievement is
    rooted in the past, is cultivated to full stature
    by many contemporaries and flourishes only in a
    favorable environment. No individual is alone
    responsible for a single stepping stone along the
    path of progress, and where the path is smooth,
    progress is most rapid.
  • --Ernest Orlando Lawrence

3
Agenda
  • Sponsored Project Award Administration
    Environment and Research Team Responsibilities
    (Phyllis Gale)
  • The Sponsored Project Awards and the SPAA Package
    (Phyllis Gale)
  • Post Award Administration Non Financial
    (Phyllis Gale)
  • Post Award Administration Financial (Phyllis
    Gale)
  • Project Costs and Billing (Jerry Kekos)
  • Cash/Funding Management (Sallie Frainier)
  • Closeout (Andre Bell, and Lisa Rebrovich)
  • Award Management Report and
  • E-Notifications,

4
Award Administration Environment
  • FY2003 1,158 Funding Actions resulting in
    118.2M of funding
  • FY2003 - there was 927 active Sponsored Project
    Awards with 285 different sponsors
  • FY2003 - there were 347 new sponsored project
    awards with 163 different sponsors
  • Every Berkeley Lab Scientific Division has at
    least one active sponsored project award
  • Sponsored Project Awards represent about 25 of
    the Labs research funding

5
Award Administration Environment
  • The research is accomplished
  • by dedicated research
  • teams typically composed of
  • PI
  • Divisional Administration
  • Sponsored Projects Office
  • Finance
  • Other Central Functional Administrative Units
  • Procurement, Property Management, Patents.
    Technology Transfer, EHS, Human and Animals
    Regulatory Commission, Records and Archives,
    Human Resources, and Internal Audit

6
Award Administration Environment
  • Sponsored research is conducted in a regulated
    environment that come from a multitude of
    different sources
  • Federal Government as represented by the U.S.
    Department of Energy through Contract 98
  • The University of California
  • Berkeley Laboratory
  • Terms and conditions of our agreements with the
    Sponsors

7
Award Administration Environment
  • All members of the research team are responsible
    for the conduct of research in a prudent and
    ethical manner through
  • understanding relevant laws, regulations,
    contract and grant requirements pertaining to
    research administration
  • ensuring compliance

8
Award Administration Environment
  • What happens if there are violations of policy or
    regulation occurs during the course of a
    sponsored project, what are the consequences?
  • More scrutiny by sponsors and audit agencies,
    corrective action plans, more regulations,
    potential fines and penalties, potentially
    disallowed costs, harm to the health and safety
    of individuals, and harm to Berkeley Labs
    reputation.

9
Responsibilities of the Research Team Principal
Investigator
  • UC Contract and Grants Manual defines Principal
    Investigator as the individual with primary
    responsibility for
  • The scientific integrity and management of the
    project
  • The financial management of the project funds
  • Adherence to all applicable DOE and University
    policies and
  • Adherence to externally imposed sponsor terms and
    conditions including reporting, deliverables, and
    record keeping requirements contained in the
    award documents
  • UC Contract and Grants Manual
  • Chapter 10 Internal University Administration

10
Responsibilities of the Research Team Division
Accountabilities for the PIs Performance
  • Division Directors are accountable for the
    performance of LBNL PIs under their supervision.
    Basic responsibilities include
  • Determining an individuals eligibility for PI
    status
  • Determining the consistency of the proposed
    project with the objectives of the organizational
    unit

11
Responsibilities of the Research TeamDivision
Accountabilities for the PIs Performance
  • Determining the appropriateness and acceptability
    of research personnel, space, equipment, and LBNL
    financial commitments contained in the proposals
    for sponsored projects
  • Assuring the project performance is consistent
    with DOE and UC policies along with externally
    imposed sponsor terms and conditions.
  • UC Contract and Grants Manual
  • Chapter 10 Internal University Administration

12
Responsibilities of the Research Team -
Divisional Administration
  • Supports PI in post award administration
  • Works with the PI, SPO, Finance and other
    functional organizations to ensure compliance
    with award terms and conditions, DOE, University,
    Laboratory, and Sponsor policies
  • Initiate transactions to support research

13
Responsibilities of the Research TeamSponsored
Projects Office
  • UC Contract and Grants Manual divides the
    responsibility for contracts and grants between
    their Sponsored Projects Offices and the
    Principal Investigators
  • The Berkeley Laboratorys Sponsored Projects
    Office is the only office responsible for the
    formal legal obligations related to the
    solicitation and acceptance/execution of
    extramural funding as delegated by DOE and the
    University of California
  • UC Contract and Grants Manual
  • Chapter 10 Internal University Administration

14
Responsibilities of the Research Team Sponsored
Projects Office
  • Authorizes Sponsored Project Awards
  • Negotiates the award and the required sponsor
    approvals during the course of post award
    administration
  • Partners with the PI, Division Administration,
    Finance and other functional organizations to
    ensure compliance with award terms and
    conditions, DOE, University, Laboratory, and
    Sponsor policies

15
Responsibilities of the Research Team Accounting
and Budget
  • Partners with the PI, Division Administration,
    Sponsored Projects Office and other functional
    organizations to ensure compliance with award
    terms and conditions, DOE, University,
    Laboratory, and Sponsor policies
  • Bills and receives payments from the Sponsor
  • Negotiates and sets Burden Rates and provides
    guidance for budget formulation
  • Interfaces to DOE to assure the Financial Mod to
    Contract 98 contains sufficient resources for the
    award expenditures

16
Responsibilities of the Research Team Other
Functional Central Administration Organizations
  • Partner with PI, SPO, and Divisional
    Administration to ensure compliance with award
    terms and conditions, DOE, University,
    Laboratory, and Sponsor policies
  • Reviews and validates transactions to support
    research

17
Sponsored Project Awards
  • All Sponsored Project Awards are part of the DOE
    Work for Others Program
  • A Sponsored Project Award is can be defined as
  • Externally funded by a Non-DOE HQ Sponsor
  • Governed by terms and conditions specified in a
    written agreement between the sponsor and DOE or
    UC/Lawrence Berkeley National Lab
  • Governed by regulations set out by DOE, the
    University, and Berkeley Laboratory

18
Sponsored Project Award Components
  • Statement of Work
  • Budget
  • Deliverables
  • Disposition of Property
  • Sponsored Project Award Agreement with terms and
    conditions
  • A Finite Period of Performance
  • Detailed Fiscal Responsibility with the
    expectation to return of funds at the end of the
    period of performance

19
Sponsored Project Award Authorization
  • Only the Sponsored Projects Office has DOE and
    University of California delegation to accept
    Sponsored Project Awards
  • If a PI, divisional administration or others
    receive original award documentation, it should
    be immediately forwarded to the appropriate SPO
    Contracts Officer so it can be reviewed, conduct
    negotiations (if required), and authorize the
    award.

20
Sponsored ProjectsAward Package
  • When is an award authorized and when can the
    science begin?
  • No Award may be authorized nor expenditures
    incurred until an award has been fully executed
    by either DOE or LBNL/SPO, all other requirements
    are met (i.e. advance payment received) and
    authorized by SPO.
  • What is an Award Package?
  • The Award Package consists of a Sponsored Project
    Award Authorization and a copy of the agreement
    along with other documentation that SPO may
    include (i.e. copy of advance check).

21
Sponsored ProjectsAward Package
  • What is a Sponsored Project Award Authorization
    (SPAA)
  • It is a report from the RAPID system with
    specific information highlighted for the
    administration of the award.
  • It is issued by SPO to authorize initial award
    and post award administrative and funding actions
  • Additional funding (including incremental)
  • Changes to the Award (including scientific,
    administrative, financial, and no cost
    extensions)
  • It is issued by Accounts Receivable for
    deobligations and refunds based on final invoices
    and financial reports.

22
Reviewing the Award Package and Opening a Project
  • Review the SPAA
  • Review the Agreement
  • Additional Documentation
  • Note if the Sponsor has a separate administrative
    manual (i.e. NIH) for additional terms and
    conditions governing the award
  • Call your SPO CO if you have
  • Questions!

23
Terms and Conditions to Review
  • Committed Funding Amount and Payment Method
  • Period of Performance
  • Property
  • Publications
  • Intellectual Property and Rights in Data
    Integrity
  • Statement of Work for Deliverables
  • Any restrictions or unusual terms that were noted
    in the SPAA

24
Terms and Conditions
  • The Agreement and/or the sponsors administrative
    manual can contain requirements for
  • prior approvals for administrative actions
    including foreign travel, change in PI, PI
    absence from the Lab, change in Key Personnel,
    change in scope of work, addition of Human and/or
    Animal Subjects to Research, RD Subcontracts,
    budget expenditures, purchase of equipment, etc.
  • And without prior approval
  • the costs could become
  • potentially unallowable costs.
  • And balance with the cost
  • principles of Contract 98

25
Post Award Administration
  • Deviation from Award Terms and Conditions
  • If in the course of research there is any
    deviation from the terms and condition,
    consultation with the SPO CO is required to
    determine if prior approval by the Lab or the
    Sponsor is necessary and if the award should be
    amended.
  • If it is implemented prior to sponsor approval
    and amendment of the agreement (if required), the
    costs may be unallowable.
  • Prior approval requests must be in writing and
    include the endorsement of the SPO CO.
  • Sponsor approvals must be in writing (including
    e-mails) and must be on file in the SPO File

26
Post Award Administration
  • Human and Animal Subject Approvals Approvals
    are required to be current throughout the life
    cycle of the award. Adding Human and/or Animal
    Subjects to research is a change in scope of work
    and must be approved for the research award prior
    to commencement.
  • Some sponsors (i.e. NIH) require prior approval
    for this type of change in the scope of work
  • Lapses in approval, not obtaining approval, or
    not obtaining prior approval may result in
    unallowable costs
  • Questions? Contact EHS/HARC
  • http//www.lbl.gov/ehs/health_services/harc/hsc.s
    html

27
Post Award Administration
  • Conflicts of Interest
  • Research and Consultant Agreements
  • When there is evidence of a potential conflict of
    interest situation between an employee's personal
    affairs and Laboratory work, policy requires an
    independent substantive review of all aspects of
    the matter.
  • Questions? Contact the Laboratory COI
    Coordinator
  • http//www.lbl.gov/LBL-Work/RPM/R2.20.htmlRTFToC8
  • Human Subjects
  • Researchers who have an independent role must
    submit a Checklist for Conflict of Interest for
    Human Subjects at the time of submitting a
    protocol
  • Questions? Contact EHS/HARC
  • http//www.lbl.gov/ehs/health_services/harc/hsc.sh
    tml

28
Post Award Administration
  • Procurements POs and RD Subcontracts, and
    Consultant Agreements
  • A purchase order or subcontract (including NIH
    Consortium Agreement) cannot exceed the current
    committed funding amount or the expiration period
    of the parent award.
  • Work with Procurement to establish incrementally
    funded agreements that will mirror the parent
    award
  • Some Sponsors (i.e.) require prior approval
    before an issuance of a research subcontract or
    consultant agreement

29
Post Award Administration
  • Equipment
  • Check the agreement and the proposal budget
    regarding equipment and sponsor administrative
    manual
  • Must have funding for entire purchase price
    committed in the award prior to making the
    purchase
  • Some Sponsors require prior approval before
    equipment at a specific threshold can be
    purchased
  • Example NIH Grants Title vests with UC/LBNL -
    Prior approval to purchase equipment over 25K
    is required
  • NonFederal Standard Agreements equipment over
    5,000 vests with the Sponsor (NOT DOE). If the
    equipment was not budgeted for at the time of
    proposal and the LBNL PI would prefer to have DOE
    hold title, then the agreement will have to be
    amended to reflect the action.
  • If not, at the end of the period of performance,
    the Sponsor can request that the equipment be
    sent to the Sponsor at the Sponsors expense

30
Post Award Administration
  • Change in Scope of Work
  • If there is a substantial change, PI should
    discuss with Sponsor
  • Change in Scope of Work includes changes in
    research plan, introduction of human subjects,
    introduction of animal use, application of a new
    technology, etc.
  • Some Sponsors (i.e. NIH) require that written
    prior approval to be received prior to all
    instances of change in the scope of work
  • The Agreement should be amended to reflect the
    change in direction and Sponsors approval.
  • If approval is not received, the costs of the
    research conducted may be unallowable.

31
Post Award Administration
  • Change in Principal Investigator or Key Personnel
    Status
  • If the PI plans to leave the Laboratory or will
    be absent for a considerable period of time, then
    the Sponsor should be contacted so there is an
    orderly transition of research both
    scientifically and administratively.
  • Some Sponsors (i.e. NIH) require that written
    prior approval change in PI or Key Personnel be
    reviewed and approved prior to the action take
    place.
  • The Agreement should be amended to reflect the
    change in PI and Sponsors approval.
  • If approval is not received, the costs of the
    research conducted may be unallowable.

32
Post Award Administration
  • Publications If the PI has been asked by the
    Sponsor to restrict it may violate LBNLs ability
    to publish to an extent that it violates the
    Laboratory Policy on the Dissemination of
    Research Results.
  • The Laboratory Directors approval must be
    obtained prior to agreeing to the requested
    change.

33
Post Award Administration
  • Intellectual Property If the PI has been asked
    by the Sponsor to handle the disposition of
    Intellectual property differently that in the
    agreement, the agreement may need to be amended.
    Only SPO COs can amend an agreement changing IP
    terms in consultation with DOE and other LBNL
    departments.
  • Rebudgeting Some Sponsors (i.e. NIH) require
    prior approval if expenditures deviate from the
    budget that was approved at the time of the
    award. Consult with SPO CO if determine if there
    is a rebudgeting requirement associated with your
    award.

34
Post Award Administration
  • Additional Funds If additional funds are needed
    and were not approved in the original proposal, a
    new proposal and amendment of the agreement will
    be required. LBNL cannot unilaterally spend
    funds beyond the current contractual limitations.
    Continuation funding can be requested through
    the Bridge Funding policy. Only when Bridge
    Funding is approved and authorized through the
    issuance of a SPAA can continuation funding be
    expensed.
  • No Cost Extension If additional time is needed
    to complete the work as proposed, the agreement
    will need to be amended formally. LBNL cannot
    unilaterally work beyond the current contractual
    period.

35
Objectives of Good Research Management
  • To make the best use of available funds to
    achieve research outcomes
  • To avoid problems of fraud, waste and abuse of
    sponsor support

36
Cost Principles Under Contract 98
  • All awards are subject to the Cost Principles of
    Contract 98.
  • The sponsor may include more restrictions in the
    agreement.
  • Any cost being charged to a Sponsored Project
    Award must satisfy the following Criteria

37
Cost Principles Under Contract 98
  • ALLOWABLE All costs must be allowable under
    Contract 98 and/or the terms of the particular
    award
  • ALLOCABLE The cost must be allocable, that is,
    the award which paid the expense must benefit
    from it.
  • REASONABLE The expense must be reasonable, that
    is, the cost reflects what a prudent person
    might pay.

38
Cost Principles Under Contract 98
  • If costs are not allowable, allocable, and
    reasonable, then they may not be charged to a
    Sponsored Project Award.
  • In addition, all costs should be handled
    consistently across the Laboratory. If a cost is
    usually charged to a burden, then it cannot be
    charged to an award.
  • LBNLs list of Unallowable costs under Contract
    98 can be found at
  • http//www.lbl.gov/Workplace/FSM/UnallowableCosts.
    htm

39
Effort Reporting
  • Sponsors expect to pay only for those portions of
    employee effort that are actually devoted to
    their projects.
  • Periodically, government and internal auditors
    review our payroll charges to enforce this
    expectation.
  • In conducting these audits they are assessing
    whether the salary charged to project accounts is
    for effort that appropriately benefited those
    projects. Auditors are checking the accuracy of
    payroll charges by verifying that the percentage
    of the employee's salary charged to a sponsored
    project account reasonably approximates the
    actual proportion of the employee's FTE effort
    which was devoted to that project.

40
Cost Accounting Standards
  • A contractors practices used in estimating costs
    in pricing a proposal shall be consistent with
    his cost accounting practices used in
    accumulating and reporting costs.
  • A contractors cost accounting practices used in
    accumulating and reporting actual costs for a
    contract shall be consistent with his practices
    used in estimating costs in pricing the related
    proposal
  • Excepted from 48 CFR Part 9904

41
Project Costing and Billing
  • Jerry M. Kekos

42
Responsibilities
43
Bottom Line
  • Principal Investigator
  • Ultimate Scientific Responsibility
  • Ultimate Budget Responsibility
  • Division Analyst, Budget Office, Controller,
    Accounts Receivable and Sponsored Projects Office
  • Advisor
  • Facilitator
  • Monitor

44
Principal Investigator
  • Manages award within funding and time limits
  • Assures charges are allowable reasonable
  • Responsible for personnel assignments
  • Approves the Subcontract requisition
  • Agreement
  • Payment
  • Ensures Sponsor pre-approvals are in place before
    event execution
  • Re-budgeting
  • Key personnel
  • Human/Animal
  • Exercises responsible fiscal control
  • Ensures compliance and reports non-compliance
  • Responsible for training
  • Financial
  • Administrative

45
Division Analyst
  • Serves as an Advisor
  • Reviews and understands the Awards Terms and
    Conditions.
  • Assures the that all award costs are treated
    consistently with regard to direct and indirect
    allocation and Cost Accounting Standards.
  • Transactions are within the award funding
    (contract value), available cash balances, and
    period of performance.
  • Reasonableness of cost of the transactions
  • Reasonable allocation of the cost

46
Division Analyst
  • Serves as a Facilitator
  • Processes financial transactions (i.e. certifies
    invoices).
  • Reviews and analyzes financial reports for
    sponsored awards
  • Prepares documents and provides information for
    re-budgeting if required by Sponsor.
  • Prepares requests for Resource Adjustments (cost
    transfers) and validates for posting by
    Accounting.
  • Prepares documents and provides information for
    compliance with effort reporting (such as "NIH
    Other Support") on the sponsored award

47
Division Analyst
  • Serves as a Monitor
  • Project Costing
  • Ensures the correct burden codes and other
    attributes are assigned to the proposal and the
    project.
  • As project nears closure a greater importance is
    placed upon monitoring certain costs
  • Equipment
  • Subcontracts
  • Large supply expenditures
  • Closely track funds in vs. cost expenditures-
    request bridge when needed and appropriate
  • All Costs must be in support of the project.
  • Billing
  • One of the Division Analysts most important role
    is working with the PI and others to get the
    costs associated with an award right before it is
    invoiced.
  • Tools to Manage
  • Cost Browser
  • Award Management
  • Soft Closes

48
  • Budget Office
  • Pre-audit selected financial transactions
  • Provide institutional oversight on resource
    adjustments
  • Perform risk analysis? ensure compliance
  • Reports instances of financial non-compliance
  • Controller/Accounts Receivable
  • Prepare invoices to sponsors in timely basis
  • Prepare interim financial reports (with
    Divisions)
  • Approve or recommend approval of unexpended fund
    carry-forward
  • Assists P.I. Divisions with procedural
    questions (billing payments)
  • Proactively interacts with Sponsor during
    collection process
  • Reports instances of Financial non-compliance

49
Sponsored Projects Office
  • Authorizes Award Funding in RAPID and Distributes
    a SPAA
  • Assists P.I. with procedural management of active
    research projects
  • Reports instances of non-compliance

50
Points to Remember
  • Provide a seamless operation
  • Everyone clearly knows what their roles are as
    well as how they fit into the larger picture
  • Nothing gets
  • passed,
  • punted or
  • dropped
  • Be Proactive
  • Take Responsibility
  • Partner with other functional groups
  • Ignorance is not bliss

51
Sponsored Projects Post Award Administration
  • Accounts Receivable (AR) responsibilities
  • Billing cycle
  • Invoice types
  • Final invoice
  • Funding and award management
  • Unbilled and bridge funds
  • Cash management and procedures to alleviate
    negative cash position on non-federal awards

52
Sponsored Projects Post Award Administration
  • Accounts Receivable Responsibilities
  • Billings to sponsors
  • Collection activities
  • Invoice and advance payment application
  • final invoicing sponsors 90 days after project
    completion
  • Refunds of any unused funds to sponsors
  • Various financial status reports to sponsors and
    DOE

53
Sponsored Projects Post Award Administration
  • Monthly cutoff for resource adjustments 25th of
    the month
  • Each month on Day 2 of the monthly close, 29th
    of the month, the Project Cost (PC) to Billing
    interface runs
  • This process gathers the project costs (up
    through cutoff) charged to the award and creates
    invoices
  • Invoices are sent five days working days after
    month-end
  • Invoices are due upon receipt

54
Sponsored Projects Post Award Administration
  • Most federal agencies are invoiced and make
    payment via electronic means using the electronic
    Intra-governmental Payment and Collection (IPAC)
    system
  • National Institutes of Health (NIH) payments are
    via electronic drawdown
  • Certain Department of Army awards payments are
    made quarterly
  • DOE Integrated Contractors (other DOE Labs)
    payments are via transfer vouchers but shortly
    invoices will be created and payments submitted
    via check or electronic funds transfer (EFT)

55
Sponsored Projects Post Award Administration
  • At the end of an award AR works with SPO and
    Divisions to ensure all final costs are in,
    awards and projects are closed, and final
    invoices are submitted by the 90 day point
    (typical time period for final invoices)
  • Refunds of unused monies are processed and
    usually take 90 days
  • The refund amount is requested from Department
    of Treasury via DOE

56
Sponsored Projects Post Award Administration
  • Contract specific closing procedures are found
    at
  • http//www.lbl.gov/Workplace/CFO/SPO/Closeouts/Cl
    oseout_Body.htm

57
Sponsored Projects Post Award Administration
  • Proper funding management of sponsored research
    requires close coordination between P.I.,SPO,
    Divisions, and AR
  • Ultimately the P.I. has responsibility for all
    aspects of award management including funding,
    budgeting, spending and closeout
  • Incurring costs greater than funding or past the
    awards period of performance is against federal
    regulations and results in unbilled costs

58
Sponsored Projects Post Award Administration
  • The following is a list of unbilled types
  • Costs exceed contract The contract is within
    Period of Performance (POP) but total cost is
    higher than total funding
  • Credit costs The contract is within POP but the
    invoice payment plus advance paid/or total
    receipts is higher than total cost
  • Past POP with funds The contract is past POP
    but there is advance paid/or total receipts
    available to offset costs
  • Past POP, no funds The contract is past POP
  • but there is no advance paid/or total receipts
    available to offset costs
  • Review Requires further research to determine
    reason for costs in unbilled

59
Sponsored Projects Post Award Administration
  • Resolution of unbilled costs should be initiated
    at the Division level and requires either an
    additional increment of funding from sponsor,
    extension of the period of performance, or
    removal of the costs to the appropriate project
  • Bridge funding must be requested in order to work
    prior to receipt of advance funds or continuation
    of work in excess of funding
  • Bridge funding is provided by UC and the lab has
    a total allocation of 2.7M
  • To request bridge funding, fill out a bridge
    funding request form and submit to the Budget
    Office. Contact Budget with procedural questions
  • Cash management requires that costs not exceed
    the cash received to date on the award (advance
    invoice payments)

60
Sponsored Projects Post Award Administration
  • To request bridge funding, fill out a bridge
    funding request form and submit to SPO
  • The form is located at http//www.lbl.gov/Workplac
    e/FSM/FSMDeptsandCriticalLinks.htm
  • The bridge funding policies and procedures are
    under review by the CFO organization and will be
    changing. Any changes in procedures will be made
    known to you shortly

61
Sponsored Projects Post Award Administration
  • Cash management requires that costs not exceed
    the cash received to date on the award (cash
    advances invoice payments)
  • Currently DOE is scrutinizing sponsored project
    work to determine if laboratories are in a
    financially vulnerable cash position
  • In order to ensure the Lab is not in a vulnerable
    cash position LBNL is stepping up the collection
    practices by coordinating closely with the P.I.,
    Division, and SPO
  • Important Note Delinquent payments primarily
    occur on non-federal sponsors. Most federal
    sponsors payments come either automatically
    through drawdowns or other electronic means

62
Sponsored Projects Post Award Administration
  • 30 days past due phone call and dunning notice
    to sponsor by AR. Calls logged into PeopleSoft
    AR Conversations
  • 60 days past due phone call and second dunning
    notice to sponsor by AR. Calls logged into
    conversations. AR will notify SPO CO and
    Division Analyst if there are issues
  • 90 days past due Third dunning notice sent and
    notification to SPO CO and Division Analyst. SPO
    issues a notice (via fax) to sponsor that payment
    must be received by end of month or work will be
    suspended

63
Sponsored Projects Post Award Administration
  • Division Analyst will let P.I.know that SPO will
    contact sponsor regarding possible suspension of
    work. All calls logged into Conversations
  • 120 days AR notifies SPO CO and Division
    Analyst that work should be suspended and the
    projects closed effective first day of the
    following month if payment not received
  • SPO issues written notice via fax to sponsor that
    work has been suspended and a termination notice
    will be sent in 30 days if the payments have not
    been received

64
Sponsored Projects Post Award Administration
  • Division Analyst informs P.I. That SPO will
    contact sponsor regarding termination and
    suspension of work. Calls logged into
    Conversations.
  • 150 days AR manager follows up with the sponsor
    to collect payment and notifies SPO CO and
    Division Analyst if sponsor has not paid
  • SPO issues a termination notice via fax to
    sponsor on 150th day that the award is terminated
    on the 165th day

65
Sponsored Projects Post Award Administration
  • 180 days - AR supervisor notifies SPO CO and
    Division Analyst that the award is being
    submitted to DOE/Treasury for collection
  • AR will notify all parties if payment received.
    It would have to be decided on a case by case
    basis to continue research with the sponsor and
    under what conditions to minimize the financial
    risk to LBNL.

66
Sponsored Projects Post Award Administration
  • Some tools to assist you
  • Award Management Report
  • Monthly 737 report located on \\Issnov7\fsdata\Pub
    lic\777rpt\FY04
  • Monthly Invoice Aging Report located on
  • \\Issnov7\fsdata\Public\Aging_Report
  • Roles Responsibilities Matrix located on SPO
    website
  • PeopleSoft AR Conversations (Go/Manage Sales
    Activity/Collect Receivables/Use/Conversations.
    Input Customer ID. Notes section available for
    read/write)

67
Award Expiration and Closeout
  • Managing Award expiration and closeout was
    reviewed at the RAPID Meeting on 3/19/04.
  • Closeout usually entails the following
  • Financial Reporting and/or Final Invoice
  • Scientific Reports and Deliverables
  • Intellectual Property Reporting
  • The roles and responsibilities and procedures can
    be accessed at
  • http//www.lbl.gov/Workplace/CFO/SPO/Closeouts/Clo
    seout_Body.htm
  • Update on the Internal LBNL WFO/CRADA Closeout
    Checklist

68
Award Expiration and Closeout
69
Award Expiration and Closeout
  • Tools to manage award expiration includes
  • Award Management Report
  • Monthly 737 report located on GPublic/777rpt
  • E-Notifications for Award Expiration and Closeout

70
Award Management Report
71
E-Notifications
  • Costs Exceed Award Funding (Contract Value) or
    Occur After the Period of Performance
  • 25 of Funding Remaining.
  • Costs have Exceeded Funding.
  • Costs have Exceeded Funding thru a complete
    accounting cycle and Award and Projects close.
  • Award Expiration and Closeout
  • Award Expiration e-notices sent 90, 60, and 30
    days prior to end of the period of performance.
  • Email Notification for Award Closeout sent one
    day after the expiration date.

72
E-Notifications
  • When will the E-Notifications start?
  • May, 2004
  • Initial e-mails will be captured on a
    spreadsheet and sent to Division Analysts for
    review, comments and action.
  • Who will receive E-Notifications?
  • PIs
  • Division Analysts (Managed through Smartlists)
  • SPO CO assigned to the award
  • AR at the time of Award and Project Closeout

73
Negative Funding
  • If the award remains in a negative funding
    position, the award and project will close on the
    first of the month following 30 continuous days
    in a negative position within a one month
    accounting period.

April May June
4/1/04
5/1/04
6/1/04
Award goes negative 4/15/04
Award remains negative through 5/31/04
Award and Projects Close effective 6/1/04
74
Questions?
Write a Comment
User Comments (0)
About PowerShow.com