BioRad Sputter Coater - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

BioRad Sputter Coater

Description:

SETUP FOR SPUTTERING Chamber pressure should reach 6 8 x 10-2 mbar. INT/LOCK SET HT Button should be illuminated. Press the FTM TIMER Button ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 15
Provided by: MikeBe157
Learn more at: https://aarc.ua.edu
Category:

less

Transcript and Presenter's Notes

Title: BioRad Sputter Coater


1
BioRad Sputter Coater
  • Instructions for gold coating a SEM sample.
  • NO, its not your eyes. This image is out of
    focus

2
Overview
3
Step 1 -- Argon On
  • Check to see if the Argon tank (bottle) main
    valve is on.
  • Do NOT turn the pressure adjust needle valve on
    the regulator.

4
Vent Specimen Chamber
  • Normally the specimen chamber is left under
    vacuum.
  • Turn on Power (red button illuminates)
  • Press Vent button (illuminates)
  • Allow 30 seconds or so for the chamber to vent
  • Press the Vent button again after chamber is
    vented

5
Vent Chamber 2
6
Open Sample Chamber
  • Open chamber by lifting the Target Assembly. Do
    not place your fingers on the target.

7
Place samples in chamber
  • Load samples on stage
  • Close Chamber top making sure that the top is
    seated properly on the glass jar.
  • DO NOT DROP THE TOP.

8
Pump chamber
  • Press Pump button (illuminates)
  • Let chamber pump down to 2 4 10-1 mbar. Then
    press Pump button (light out).
  • Press Vent button (illuminates). This will purge
    the chamber of air. The press Vent button again
    (light out).
  • Press Pump button (illuminates) and pump down.
    Chamber pressure should reach 6 8 x 10-2 mbar.
    This takes about 15 minutes.

9
SETUP FOR SPUTTERING
  • Chamber pressure should reach 6 8 x 10-2 mbar.
  • INT/LOCK SET HT Button should be illuminated.
  • Press the FTM TIMER Button (illuminates)
    sputtering is done by time FTM does not work.

10
LEAK ARGON
  • Press the LEAK BUTTON (illuminates) DO NOT
    ADJUST THE LEAK VALVE
  • The pressure in the chamber should spike and then
    drop back down to about 8 10-2 mbar.

11
Sputter Gold -- 1
  • Set the time on 30 sec.
  • Press the start button on the timer unit.
  • Slowly increase the kV (turn the knob)until the
    Plasma current is about 25 mA. The kV knob will
    be at about the 1 oclock position.

12
Sputter to desired thickness
  • Reset the timer to the desired time. This will
    vary depending upon the thickness of the coating
    that you want. Try 60 seconds for a start.
  • Remember that you can always put more on but it
    doesnt come off very easy.
  • Recommend that you try very light coating and
    build up to your needed thickness. This is a
    trial and error process.

13
Take Out the Samples
  • Turn the kV knob to zero
  • Press the LEAK Button (light out)
  • Press PUMP button (light out)
  • Press VENT button (illuminates)
  • Let the chamber vent (takes about 30 seconds)
  • Open chamber top and remove samples.

14
Shut down
  • Close top (target assembly) making sure it is
    seated properly
  • Press VENT button (light out)
  • Press PUMP button
  • Turn off valve on top of Argon bottle
  • Press POWER Button (light out)
  • Sign In/Out
Write a Comment
User Comments (0)
About PowerShow.com