WP 8F Workplan - PowerPoint PPT Presentation

About This Presentation
Title:

WP 8F Workplan

Description:

SG 8 Seminar WP 8F Workplan Jim Ragsdale, USA – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 20
Provided by: Lang150
Category:
Tags: chapter | workplan

less

Transcript and Presenter's Notes

Title: WP 8F Workplan


1
WP 8F Workplan
SG 8 Seminar
Jim Ragsdale, USA
2
SG 8 Seminar
WP 8F Work Flows (1)
  • WP 8F deliverables for WRC 07 timeframe are
    grouped in three high level groups
  • Demand IMT.MARKET, IMT.SRVC_View
  • Supply IMT.METH, IMT.ESTIMATE
  • Where IMT.CANDI
  • Generically known as
  • What for? How much? Where?

Jim Ragsdale, USA
3
SG 8 Seminar
WP 8F Work Flows (2)
Jim Ragsdale, USA
4
SG 8 Seminar
Original WP 8F Structure
Working Groups
WP 8F Plenary
Ad-Hoc and Coordination Groups
Coordination with external forums (research,
standards, other ITU groups, etc.)
Jim Ragsdale, USA
5
SG 8 Seminar
WP 8F Work Flows (3)
  • WP 8F deliverables demand great interaction
    among Working Groups
  • Services
  • Spectrum
  • Technology
  • WRC
  • This was complicated in the original structure
    due to interactions among Sub-Working groups
  • Market, Services, Methodology
  • Estimate, Spectrum Bands, Frequency Arrangements,
    Sharing
  • Radio Aspects

Jim Ragsdale, USA
6
SG 8 Seminar
WP8F Original Interactions
Jim Ragsdale, USA
Jim Ragsdale, USA
7
SG 8 Seminar
WP 8F SWG Restructure
  • WP 8F at 13th meeting in Berlin restructured
    Sub-Working Groups
  • Methodology and Estimate combined and renamed
    SpeCalc, home is Services WG until 16th
    meeting, then moved to Spectrum WG
  • Market and Services combined, renamed Market
  • Restructure smooths interactions among
    Sub-Working groups
  • Market and Service aspects in same Sub-Working
    Group
  • Methodology and initial Estimate work in same
    Sub-Working Group In same Working Group as
    Market
  • Final Estimate work in WG Spectrum along with
    CANDI

Jim Ragsdale, USA
8
SG 8 Seminar
WP 8F Deliverable Plan

2003

2004

2005

2006

2007

2008

2009

2010

gt2010

CPM/WRC meeting

ltWRC







CPMgt

WRCgt





SG 8 meeting


























WP 8F meeting No.

10

11

12

13

14

15

16

17

18

19

20

21

22





Service View



Services





Mark
et










Methodology
(to be moved to WG Spec in









meeting 16)

Services/market aspects (SERV)

Estimate
(to be moved to WG











Spec in meeting 16)

Naming




Naming










WRC Preparations (WRC)






CPM Text









Candidate Spectrum









Mitigate











Spectrum

Comp

Sharing







(SPEC)

UWB

Survey












M.1036 Rev 2












Migrate (MIGRATE)

Texts











Developing (DEV)



Handbook update (if required)








SDR














Radio aspects







Technology (TECH)


M.1079 Rev2














M.1580/1













Trends
















Enhancements to IMT
-
2000

Annual revisions to M.1457 and, if necessary,
revisions to other Recommendations on IMT
-
2000

IMT.RADIO and subsequ
ent












revisions, if necessary

New radio interface(s) for

IMT.GCS and subsequent
systems beyond













revisions


Development of detailed specifications for
enhancements of
Radio interface

IMT
-
2000 and
IMT
-
2000

development process

Complementary
enhancement

work to be

performed
Systems
Research on new technologies

Development of detailed
outside ITU

beyond IMT
-
specifications/standards

2000






WRC
-
07 related
Key


deliver

Recommendations


Reports/Circulars etc.

ables


Jim Ragsdale, USA
9
SG 8 Seminar
WP 8F Deliverables
  • Planned WP8F Deliverables (WRC-07 timeframe)
  • Methodology (IMT.METH
  • Estimate (IMT.ESTIMATE)
  • Candidate Spectrum (IMT.CANDI)
  • Radio Aspects (IMT.RAD_ASPECTS)
  • Market (IMT.MARKET)
  • Service View (IMT.SRVC_VIEW)
  • Services (IMT.SRVC)
  • Naming (IMT.NAME)
  • Sharing Studies
  • Survey (IMT.SURVEY)
  • Revision of M.1036-2 (2500-2690 MHz addition)
  • Software Defined Radio (IMT.SDR)
  • Revisions to M.1457
  • Handbook Supplement

Jim Ragsdale, USA
10
SG 8 Seminar
WP 8F Meeting Plan (1)
 

Jim Ragsdale, USA
11
SG 8 Seminar
WP 8F Meeting Plan (2)
Jim Ragsdale, USA
12
SG 8 Seminar
WP 8F Meeting Plan (3)
2007


Meeting
Number
Start
End
Year
Location
Status
Comments








21
17 Jan
25 Jan
2007
Geneva
Tentative







WP 8F

ITU CPM
-

5 Mar
16 Mar
2007
Geneva
Firm






07

May
22
23
31 May
2007
TBD
Tentative
(date c
onstrained





WP 8F

by RA
-
07 SG
-
8)


SG 8

25 Jun
26 Jun
2007
Geneva
Tentative
(date constrained






by RA
-
07 approx 3
months prior to
RA)

ITU RA
-

1 Oct
5 Oct
2007
Geneva
Firm






07

ITU WRC
-

8 Oct
2 Nov
2007
Geneva
Firm






07


Jim Ragsdale, USA
13
SG 8 Seminar
WP 8F Micro Workplans(1)


Jim Ragsdale, USA

14
SG 8 Seminar
WP 8F Micro Workplans(2)
Jim Ragsdale, USA
15

SG 8 Seminar
WP 8F Micro Workplans(3)
MICRO WORKPLAN FOR
METHODOLOGY (3)
Jim Ragsdale, USA





16
SG 8 Seminar
WP 8F Micro Workplans(4)
  •  

MICRO WORKPLAN FOR
METHODOLOGY (4)
Meeting 13

Milestones



Identify what technical parameters need to be
considered for
developing the spectrum calculation methodology



Submission of the technical parameter requirement
to SWG
Radio Aspects



Develop initi
al calculation algorithm



Consider the relationship between the methodology
developed
here and Rec. ITU
-
R M.1391, dealing with the satellite
component of IMT
-
2000.

Meeting 14



Use initial set of preliminary figures from
Market Report
(IMT.MARKET), Service
View and Radio Aspects
(IMT.RADIO) to begin to test the methodology
through an
iterative process



Determine calculation algorithm



Submission of the material available on
the methodology to
SWG Estimate



Jim Ragsdale, USA
17
SG 8 Seminar
WP 8F Micro Workplans(5)
MICRO WORKPLAN FOR
METHODOLOGY (5)
Meeting 15

Milestones



Final adjustment of algorithm using a set of
figures from
Service/Market (Service View, Report IMT.MARKET)
and
Radio Aspects (IMT.RADIO)

Meeting 16



Agreement of Methodology Recommendation



Submission of Methodology Recommendation t
o SWG
Estimate

Meeting 17



Consideration of comments from application in SWG
Estimate



Final approval of methodology Recommendation in
WP8F and
submission to SG 8


Jim Ragsdale, USA
18
Thank you
SG 8 Seminar
Jim Ragsdale, USA
19
SG 8 Seminar
WP 8F Work Plan
2002 2003
2004 2005
2006
2007 2008 2009 2010 2011 2012

WRC-03
WRC
WRC-07
WP 8F WRC preparations
  • Draft text for WRC-07
  • Spectrum estimate
  • Candidate freq ranges
  • When
  • What for / name
  • Methods to satisfy agenda
  • Footnote text
  • Pooled / shared / paired / etc. ?

Future Services / Market Analysis
Future Spectrum Calculation Methodology
Future Spectrum Estimate
Future Technology Assumptions
Spectrum Survey
Sharing Studies
Radio Aspects
WP 8F other spectrum- related activities
2.5 GHz Spectrum Plan
Peter Scheele, Germany, for the Chairman of WP 8F
Write a Comment
User Comments (0)
About PowerShow.com