Establishing continental backbones "The DANTE/GEANT experience" - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Establishing continental backbones "The DANTE/GEANT experience"

Description:

Establishing continental backbones – PowerPoint PPT presentation

Number of Views:123
Avg rating:3.0/5.0
Slides: 22
Provided by: helg89
Category:

less

Transcript and Presenter's Notes

Title: Establishing continental backbones "The DANTE/GEANT experience"


1
Establishing continental backbones "The
DANTE/GEANT experience"
  • E. Valente (GARR)
  • International Workshop onAfrican Research
    Education NetworkingSeptember 25-27 2005 CERN -
    Geneva, Switzerland

2
What is GÉANT2?
  • 7th generation of pan-European research network
    infrastructure first international hybrid
    network
  • Project partners include 30 of Europes national
    research and education networks (NRENs), DANTE
    and TERENA
  • Will connect 34 European countries and serve over
    3500 research and education establishments across
    Europe
  • Over 3 Million Users

3
What is GÉANT2?
  • Provide international connectivity to other world
    regions
  • Funded jointly by NRENs and European Commission
  • Project timescale September 2004 - August 2008

4
GÉANT2s Objectives
  • Provide a gigabit-speeds infrastructure to
    support European research and education
  • Provide a research infrastructure for network
    technology developments
  • Develop a wider range of network services
  • Performance monitoring
  • Security
  • Bandwidth on demand
  • Testbed facility
  • Mobility and roaming
  • Provide global connectivity for Europes research
    and education community

5
Research Networking in Europe
  • Where did we start?

6
EUROPANET
1996/97 Topology
7
October 1996 Topology
8
January 2000 Topology
9
December 2001 Topology
10
October 2004 Topology
11
Research Networking in Europe
  • And where are we now ?

12
August 2005 Topology
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
Country Name of NREN International Research Connectivity (in Mbps) Status
Algeria CERIST 155 In service1
Cyprus CYNET 200 In service
Egypt EUN 34 In service
Israel IUCC 310 In service
Malta University of Malta 20 In service
Jordan UniCo 45 Planned2
Morocco CNRST 34 In service
Syria HIAST 8 Planned2
Tunisia RFR 45 In service
Turkey ULAKBIM 155 In service
17
  • The EUMEDGRID initiative is aimed to estabilish a
    Grid Infrastructure for eScience in the
    Mediterranean Area
  • connected with EGEE
  • and other related initiatives in the Balkans,
    North Europe, Latin America and Far-East Asia.
  • The EUMEDGRID initiative is intended to foster
    and promote the international cooperation in
    eScience as well as the growth of the
    Mediterranean Countries in the fields of Research
    and Industry.
  • EUMEDGRID EUMEDGRID EUMEDGRID

18
  • EUMEDGRID aims to provide specific support
    actions to assist the participation of the states
    of the Mediterranean region in the pan-European
    and worldwide Grid initiatives, thus expanding
    and supporting the European Research Area (ERA)
    in the region.
  • The core of the EUMEDGRID approach is to
    establish a human network in the eScience area,
    enlarge and train this community, and establish a
    pilot Grid infrastructure supporting proof of
    concept regional applications.
  • The reference GRID Infrastructure in Europe will
    be EGEE a 2 years project funded by the EU and
    started in April 2004.
  • EUMEDGRID will build upon and exploit the
    infrastructure provided by the Gigabit
    Pan-European Research Education Network (GEANT)
    and the Mediterranean Research and Education
    Networking (EUMEDCONNECT) initiative in the
    region.

19
Participants
INFN (Italy) Coordinator
CERN (Switzerland)
CYNET (Cyprus)
DANTE (UK)
GARR (Italy)
GRNET (Greece)
RED.ES (Spain)
University of Malta (Malta)
CERIST (Algeria)
CNRST (Morocco)
EUN (Egypt)
HIAST (Syria)
RNRST (Tunisia)
TUBITAK - ULAKBIM (Turkey)
20
Work packages
  • WP1 Project administrative and technical
    management
  • WP2 Requirement capture and analysis
  • WP3 Pilot infrastructure deployment and
    operations
  • WP4 Applications support
  • EGEE supported applications
  • Regional applications
  • New applications
  • WP5 Training and dissemination
  • 24 Months duration

21
Infrastructure
Write a Comment
User Comments (0)
About PowerShow.com