0332 - PowerPoint PPT Presentation

1 / 4
About This Presentation
Title:

0332

Description:

0332 Impact of combining the Entry and Exit Capacity credit processes Chris Shanley * 0332 Removal of a users ability to allow Quarterly NTS Entry Capacity to ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 5
Provided by: bev134
Category:

less

Transcript and Presenter's Notes

Title: 0332


1
0332 Impact of combining the Entry and Exit
Capacity credit processes
  • Chris Shanley

2
0332 Removal of a users ability to allow
Quarterly NTS Entry Capacity to lapse
  • Modification Proposal 0332 was discussed at the
    October Transmission Workstream
  • 0332 has been amended to reflect discussions at
    October Workstream and other feedback received
  • NTS were also asked to consider the implications
    of looking at a Users exit and entry capacity
    credit position at the same time and to present
    back to the November Workstream

3
Combining exit and entry credit checks NTS
Analysis
  • Analysis has been carried out to assess the
    impact of combining the entry and exit credit
    processes
  • Estimated Exit Capacity Charges 2012/13
  • Current entry capacity charges
  • The revised level of credit has been calculated
    in accordance to Section V (exit capacity credit
    process).
  • Results are a rough estimate

4
Analysis Results
  • 44 active Entry Shippers
  • 2 Shippers will be affected by exit reform and
    required to provide additional credit/security to
    National Grid NTS
  • 4 Shippers (9) would be required to provide
    extra credit/security if the 2 credit processes
    were combined
  • 14.75m in total
  • Is there a benefit of combining the 2 credit
    processes?

The cost of providing this additional
credit/security depends on which tools are used
by the affected shippers
Write a Comment
User Comments (0)
About PowerShow.com